Original source · versioned page text
2022-06-13 General Committee Meeting Agenda PUBLIC
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 13 JUNE 2022
Environment
59. Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must
not be released from the site or to waters within the site, or be likely to be released should
rainfall occur, unless all reasonable and practicable measures are taken to prevent or
minimise the release and concentration of contamination.
60. Erosion and sediment control measures must be installed and maintained to minimise
erosion on the site and to minimise the export of sediment and associated pollutants from
the site. The erosion and sediment control measures must be designed, installed and
maintained in accordance with current best practice standards
(*Refer to Advisory Notes).
61. Limit soil exposure on the site to a distance of no more than 2m beyond the extent of
earthworks shown on the approved plans except where the exposed soil is effectively
stabilised without delay and prior to rainfall occurring.
Bushfire Management
62. The development must be carried out in accordance with section ‘Bushfire Risk Mitigation’
of the Bushfire Hazard Assessment (V3) dated February 2022 prepared by Queensland
Bushfire Planning listed within this Decision Notice.
63. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with the bushfire management conditions
of this Decision Notice, prior to the commencement of use.
*(Refer to Advisory Note)
WASTE DISPOSAL
64. Prior to the issue of any Operational Works approvals the Operational Waste Management
Plan must be amended to reflect that all waste collection will be undertaken by Council’s
contractor via rear lift trucks with the trucks collecting 1100 litre bins.
65. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an impervious
area, within the site, correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties. A bin wash area is required with a
cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet
must be designed to prevent storm water entry to the sewerage system.
66. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REPORT
1. PROPOSAL
The application seeks approval for a multiple dwelling development of 90 dwelling units comprising
37 x 1 bedroom dwelling units, 41 x 2-bedroom dwelling units and 12 x 3-bedroom dwelling units.
The dwelling units are proposed within 3 x 3 storey buildings with all the dwellings defined as ‘small
dwelling units’ under the Noosa Plan 2020, as they have a gross floor area under 100m2.
The development will gain access from Hofmann Drive via a single cross over with 124 car parks
provided within a basement and 10 additional car spaces provided on the basement podium at the
Hofmann Drive entrance.
A copy of the proposal plans is included at Attachment 1.
Page 16 of 69
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.