Original source · versioned page text
2022-06-13 General Committee Meeting Agenda PUBLIC
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 13 JUNE 2022
2. SITE DETAILS
2.1 Background
The subject lot forms part of the Shire Business Centre. The intended development of the site was
originally identified through a master plan process nominated by the 1997 Strategic Plan. Master
plans were developed in consultation with the owners of the site, various external consultants and
the community to achieve the aim of the Strategic Plan and to inform the development of the Noosa
Plan. When the Noosa Plan was created in 2006 it captured MP2 via the inclusion of various
provisions under the Noosaville Locality Code and a master plan known as the Shire Business
Centre precinct map. Noosa Plan 2020 has further evolved and developed the master planning for
the site.
On 20 February 2020, Council, at its Ordinary meeting resolved to refuse an application to
reconfigure 1 lot into 23 lots. As a result of Council’s decision to refuse the subdivision, the
applicant lodged an appeal to the Planning & Environment Court. During the course of the appeal
a series of without prejudice meetings were held, which resulted in a negotiated settlement on 3
September 2020 which allowed for 1 into 23 lot reconfiguration to proceed subject to conditions.
The works associated with the reconfiguring a lot are currently under construction, with this
proposal to be developed on approved lots 17 -19. This is detailed in the following image.
Figure 13 – Location of proposed development
Page 25 of 69
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.