Council archive · source document
Attachment 2 - Termite Detection Report · MCU17/0559.05
‘Bridging’ means termites gaining access to a structure by passing over a termite management
system or inspection zone. ‘Breaching’ means the passing of termites through a hole or gap in a
termite management system.
Was the finished ground or paving level above Yes - see Details below
the adjacent internal floor level or
damp-proof-course or obstructing any
weephole or vent face on external walls?
Was evidence of bridging or breaching Yes - see Details below,
including the condition insufficient slab edge Include any visible evidence of bridging or
exposure found? breaching or slab edges obstructed by:
(Landscaping )
Include any visible evidence of bridging or raised garden beds are to close to the building
breaching or slab edges obstructed by:
Details (include the location and any
recommendation for further expert advice e.g.
from a licensed a building contractor):
C9 Earth-wood or damp masonry-wood contact
Was evidence of earth-wood or damp No
masonry-wood contact found?
Details (include the location and any No evidence was found
recommendation for further expert advice e.g.
from a licensed a building contractor):
C10 Other conditions conducive to termite attack
© Copyright Report Systems Australia Pty Ltd - amended and reproduced under copyright Licence 1710-c087 Page 13 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Termite Detection Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 266 KB (small file)
- File type
No other editions are linked here.