Council archive · source document
09/1247 - Prescribed Tidal Works [As Published] · 142009.1247
INTEGRATED PLANNING ACT 1997
Part A, Version 3.1, 3 March 2008
Part A
RECEIVED
? SEP 2009
[approval that may be issued ag a consequéncé of this application will be Issued to the Applicant.)
deciding this application. By lodging this application, the Applicant i incurs the obfigations and responsibilities. prescribed by the IPA. Any; development pernit or preliminary
Mey et ee
Company/organisation name (if applicable) [Pite-t Pty Ltd t/a Noosa Jetty Builders
individual applicant/Contact person (Mf there is more than one applicant, provide additional applicant details on an attachment to this form)
Postal address [Po Box 299 Noosaville, QLD 4566
|
Contact telephone number 07 5474 3480 Mobile phone number 0408 137 526
Facsimile number 07 5474 3480 e-mail address
[email protected]
‘Details of the Premises (ie. the fand on which the development is proposed - refer to the advice af the end of the form)
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A if the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
[ Name of each focal goverment area in which the mobile and temporary ERA is proposed to operate
[1
OR
Table B Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
(i) (J Street address / jot on plan for the premises (Appropriate for most applications including building applications); or
(ii) JX] Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.. jetty,
pontoon etc) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the local goverment.)
Street Address . . . Lot on plan description
Tat] Sheet - — — _ Plan type and Local government area (e.g: Logan,»
No. | No. Street Name and official suburb/locality name {Post Code } Lot No. Plan Number Cairns)
| 1 7 Wyuna Drive, Noosaville 4566 3 N10575 Sunshine Coast Regional Councit
AND/OR
Table Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
Coordinates
__(Note: place each set of coordinates in a separate row} Zone Daturn Loca! government area
Easting Northing Latitude Longitude Reference (if applicable)
1 LJ vepass
CL weses
[J Other -
2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics
- complete only if applicable)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 13 pages
Page 2
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.9. river, creek, fake, canal)
Name of water body, watercourse or aquifer (if known)
[4 [Noosa Sound Canal
Table E Complete if the premises are on Strategic Port Land under the Transport infrastructure Act 1994
Lot on pian description for strategic port land j Port Authority for the lot
i
Table F Complete if the premises are in tidal water
Name of focal government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable)
[1 | Sunshine Coast Regional Counci
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
Total area of premises
628.00 &)m? [hectares {Tick applicable unit)
‘Existing use of the premises |
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
| 1 House
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?
& No O Yes - Ensure the type, focation and dimensions of each easement are included in plans, submitted with the application
[Proposal details
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 tot residential subdivision, a bore, aquaculture)
Existing pontoon
7. Does the poposal include new buildings or operational work (including any services) on the premises?
Oo No Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
‘Resource entitlement (i applicable) - further information is provided in the advice section at the end of the form
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
Kl No - Goto a9 Oo Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
‘Owner’ 's consent (if appiicable} _- further information is provided in the advice section at the end of the form”
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.
Premises Owner's name/s Details of the premises owned . Date consent
Table H and postal address (street address or lot on plan description) Ow {ure was obtained
Glen Francis Edward Bewley
4 C/- PO Box 299 Noosaville | 7 Wyuna Drive Noosaville. QLD 4566 . 02/09/2009
QLD 4566 t
Lynette Bewley
2 C/- PO Box 299 Noosaville | 7 Wyuna Drive Noosaville. QLD 4566 Ss2iosr2009
QLD 4566 A
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent If the owner is a company, $127 of the Corporations Act 2001 (Cweatth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .
Page 3
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
‘Attachments and supporting information (Complete Table | - Use a separate row for each type of attachment or information, including information required
lunder this Parl) Please ensure alf documentation submitted with this farm, including other Parts of Form 1, or owner's consent, etc, are securely attached lo this Part of the Farm.
Description of attachment or information Title (a i
, plicable) Method of delivery to
Fable | (95 Pat Co Fem 1 mers conser evince Of SNT® | (ag. Genera Auth. ames Steet Tate Report Date | assessment manager
1 Part P 02-Sep-2009 | over the counter
2 Checklist 02-Sep-2009 | over the counter
3 John Norden G & L Bewley 7 Wyuna Dr 02-Sep-2009 | over the counter
4 Photos 02-Sep-2009 | over the counter
5 RP Plan 02-Sep-2009 | over the counter
‘Portable Long Service Leave (PLSL) levy (Applicable for cerfain building and construction work valued over $60,000 only) ~~]
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if applicable)
(J the application seeks a preliminary approval only;
{] the application is not for building and construction work under the Building and Construction industry (Portable Long Service
Leave) Act 1991, section 3A (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
[X] all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
No - End of Part A
LJ Yes - Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
Fee ($) GE? Date received | vt (aleq Recewing offer’ PS $ rae Reference call 1Uape-7
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER
To: Council. | have been engaged as the private certifier for the building work referred to in this application.
ore
-Dateof |: mo . ou“ . nO cat "tars olieecin cag
engagement Name BSA Certification number Building classifications
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
. oa ; Date receipted :
Description of the work QLeave Project Number |Amount paid (8)| Date paid form siied by Name of officer who sighted the
- manager *.
1
Privacy Statement
The information colfected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, excep! where required by legislation {including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 General advice Part A of IDAS Development Application Form 1 must be completed and accompany alt development applications. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger may refuse to receive an application that is not properly made. The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only. Applicant details If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided under the IPA. Details of the premises The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land. Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete Table A. The premises may be identified in a number of ways -- ¢ Street address and lot on plan are most common and will apply to most applications. ¢ Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as Zone Reference or GS84 may be provided. The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act. StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand. StrategicPortLandis declared under the Transport Infrastructure Act 1994, For further information go to IDAS Guide 11 (Development on strategic port land) and the Queensland Transport (Ports) website. “Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is defined in the IPA (schedule 10). Generally, the area below “high-water mark’ (defined by the Coastal Act in relation to high water mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local govemment's area unless provided for under the Loca! Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidat area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work). Resource entitlement Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a prescribed State resource. Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State- owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Regulation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence. For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made. For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads. Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark. ‘Owner's consent Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the application involves: a materiat change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport infrastructure Act 1994. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the processes of the application or in the event of an appeal about the outcome of the application. “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent). Templates are available from the PA website for the provision of owner's consent as an attachment to this form. However other documentation may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises. Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary ERA.
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Portable Long Service Leave (PLSL) Levy The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland. The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction industryTrainingLevy. The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land. The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be issued. The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qid.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web: www.qleave.qid.gov.au )
Page 6
6
xf
INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008
idas}
Part P
Prescribed tidal work
iNature of the prescribed tidal works |
1. Whatis the nature of the proposed prescribed tidal work and the type of approval sought? (Tick applicable box/es)
Nature of use Estimated value of
{Tick applicable box) | completed works ($)
(7 Private use
(J Non-private use
J Private use
LJ Non-private use
Type of approval sought
Ow Jetty, pier or wharf
OO iti) Boat ramp or spillway
Private use
C1 (ii) Mooring pite 4 Non-private use [Xx] Development Permit
(J Private use _] Pretiminary approval
i Deck ‘dwalk
a) jack of boardwal [J Non-private use
Private use
Ow Pontoon M4 $15,000.00
{J Non-private use
(Private use
(1 Non-private use
O wi Revetment, sea wall or retaining wall
oO (vii) Other (e.g. abutment, basin, bridge, breakwater, dam,
dock, dockyard, embankment, groyne, pipeline or other |[—] Private use
underground service etc.) - Provide details below
([J Non-private use
2. ts the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of the lot connected to the
work and neighbouring lots are not at right angles fo the waterway?
a)
(11 Yes - Submit, with the application, photos of any constructed neighbouring structures, or information about approved but unconstructed
neighbouring structures.
(Adjoining property access and evidence of support |
3. __ Is the application supported by evidence that the proposed work will not prejudice the access rights of adjoining property owners?
LE] No — & Yes - Complete Q3(a)
3(a) What is the nature of the evidence?
[J Letters of support from adjoining property owner - Submit, with the application, the letters of support.
Plans illustrating a water allocation area - Submit, with the application, the plans illustrating the water allocation area,
Page 7
INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008
ICertification J
4. Has a Registered Professional Engineer of Queensland (RPEQ) or interstate equivalent certified that the works comply with the design
and safety provisions of the State IDAS code for Prescribed Tidal Works contained in the Coastal Protection and Management
Regulation 2003?
[1] No
[Xx] Yes - Provide details below
Name of RPEQ or equivalent John Norden
RPEQ No. or equivalent
Contact mailing address PO Box 205 Tewantin QLD 4565
Contact telephone number 107 5449 7137
Contact facsimile number . 107 5449 7172
Reference number of all plans to which this certification relates
[Mandatory information ]
5. Confirm the following mandatory information accompanies this application.
Confirmation of
lodgement Method of lodgement
Plans and written documentation
i) The location and dimensions of the proposed tidal work in relation to the lot/s abutting the proposed
work and the tidal land on which the work is proposed to be located
(ii) All other structures on the waterfront and within 20 metres of the proposed works & Confirmed over the counter
(iii) The current tocation of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and
Mean High Water Springs (MHWS)
(iv) The slope angles of the beds and banks of the tidal area [X] Confirmed over the counter
[X] Confirmed —_| over the counter
[x] Confirmed —_| over the counter
(v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work in the
Coastal Protection and Management Regulation 2003, schedule 4A (e.g. physical appearance, lighting, |X] Confirmed over the counter
signage, earthworks, public access, infrastructure, structural components, engineering design standards)
(vi) The finished levels of the proposed works (XJ Confirmed over the counter
Confirmed
(vii) Details of the largest vessel, if any, to be moored at the structure over the counter
[_] Not applicable
(vii) — Evidence that the proposed work will not prejudice the access rights of adjoining property [Confirmed over the counter
owners {_] Not applicable
OFFICE USE ONLY
Date Received Reference Numbers [oF] EPA cost code | 433061
Page 8
INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008 Advice for completing Part P General advice * Part A must also be completed for all IDAS development applications. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. » When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) use the process from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and attach the form Electronic Funds Transfer (EFT) payment notification to the application. » For further information about compteting this form go to: . (DAS Guide 24 (Prescribed tidal work) . Ecoaccess website . EPA Guidelines and procedural guides Qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur. Q4 A Registered Professional Engineer of Queensland (RPEQ), or the interstate equivalent, may certify that the proposed work complies with the design and safety provisions of the IDAS code for prescribed tidal work in the Coastal Protection and Management Regulation 2003, schedule 4A. The provision of the certification may reduce the applicable fee for assessment of the work by the local government.
Page 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
idas)
IDAS
Assessment Checklist
IDAS Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.
Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Fortn 1 depends on
the nature of the application.
Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.
Section 1-and all-other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must-be--. —---
completed for all development applications except those proposed on land in an urban development area, or for building work
requiring assessment against the Building Act 1975 only.
For more information about development applications on land in an urban development area, refer to www.ulda.qid.gov.au.
For more advice about building applications refer to Part B of the IDAS Application Form.
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www.dip.qld.gov.au for help
For all {OAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist
Does the application seek approval to make a material change of use of the premises?
ifyes - complete Section 2 of this checklist
(Yes |fXJNo
Does the application seek approval to reconfigure a lot?
If yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. If the premises are completely within a single |_]Yes |DXJNo
local government area assessment is by the local government.
Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist Byes |LIJNo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
ifyes - complete Section 5 of this checklist
C1Yes |INo
Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application?
if yes - complete Section 6 of this checklist (Yes |JNo
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? DYes |JNo
if yes - complete Form 1 Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. DYes |JNo
Assessment is by a building certifier
Do you wish the application fo be assessed against a superseded planning scheme?
If yes - complete Form 1 Attachment 1 (Yes |BQNo
\s the application for development completely or partly on Cairns and Mackay airport land under the Airport Assets
(Restructuring and Disposal) Act 2008?
/f yes - Assessment is by the Department of infrastructure and Planning. Complete Form 1 Part D of IDAS Application Form 1 if the (Yes |INo
application is for a material change of use, and Part E if for building or operational work. Also. the application must be referred to the
local government as Advice Agency.
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
iS SECTION T section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
‘HERITAGE
“4A {s any part of the proposal intended tobe canfed out on a Queensland heritage place under the Queensland Heritage Act 19927
DX] No-Goto1.18 [_] Yes
IPA senedute E part‘ table § tem 2 iP Reguiaten schedu'e 2 iable 2 item 79.
1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Caims or Mackay airport land?
[KX] No-Gotoo12 [_] Yes
IPA schedule 8. part 1. table 5, item 2A. iP Regulation. schedule 1. part 2 fable 5. item 2.
[REMOVING QUARRY MATERIAL; WILD RIVER AREA |
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
[X] No-Gotoar3z {[] Yes
IPA, schedule 8, part 1. table 5, item 1: IP Regulation, schedule 2. table 2, item 11: IP Regulation. schedule 1. table 5, item 2 (wild river area}: Water Act 2000,
section 966C; Wid Rivers Act 2005, section 434
‘ENVIRONMENTALLY RELEVANTACTIVITY;WILDRIVERAREAts—~—=<C=s‘SSSC~™ Oo 4
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[IX] No-Gotoar4 [_] Yes
IPA, schedule 8, part 1. table 2, item 1; IPA. schedule 8, part 1, table 5. items 3 and 4: IP Regulation, schedule 2. table 2. items 1 and 23; Environmental Protection Act 1994, section
73AA (wild river area); Wild Rivers Act 2005, section 434; relevant wild river declaration: Wild Rivers Code.
WITHIN THE LIMITS OF A PORT
Wace em ee enemas ok nen ak emeen ohote omaD comet
14 Is any part of the premises within the limits of a port under the Transport infrastructure Act 1994?
No - Goto 01.5
Yes
IP Requiation, schedule 2, table 2, items 15 and 16
[DECLARED FISH HABITAT AREA |
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 19947
[X] No - Goto a1.6
(J Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, tem 26
‘COMMUNITY INFRASTRUCTURE ~ —
16 Is any part of the premises designated for community infrastructure?
KK] No - Goto. 01.7
LJ Yes
IP Regulation, schedule 2, table 3, tem 7
WASTE WATER MANAGEMENT _ J}
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
S<] No -Endof Section? [_] Yes
ip scion schedule 2, table 3, item 5
Page 11
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 22
SECTION 4 + Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME . —
41 Is the proposed operational work assessable under any State planning regulatory provisions?
KI) No [] Yes
If no, is the proposed operational work assessable under the planning scheme?
KX] No - Goto 04.2 (71 Yes - Complete Form 1, Part € and answer 04.1.1 - 4.1.7 below
‘KSSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL,
‘AREA
42
Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
[X] No -Gotoas3 (_] Yes
IPA, schedule 8, part 1, table 4. item 2: IP Regulation, schedule 1, part 2, table 5, item 1(c)
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area}
COMMERCIAL OR INDUSTRIAL DEVELOPMENT INA WILD RIVER |
d
|KOALA CONSERVATION (Inside SEQ urban footprint)
4.3A
ls any part of the premises in an interim koala habitat protection area?
{X] No -Gotoa43a ((] Yes
IP Regulation, schedule 2, table 2. item 34A
_I
‘VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA
4.3B
\s any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[X] No -Gotoas4 (] Yes
IPA. schedule 8, part 1, table 4, items 14-1G; IP Regulation, schedule 2, table 2, item 5 (vegetation clearing): IP Regulation, schedule 2, table 2. item 34 (koala
conservation); IP Regulation, schedule 1, part 3, table 4, tem (vegetation clearingAvild river area); Vegetation Management Act 1999, section 22A (vegetation
clearing’wild river area); Wild Rivers Act 2005, sections 31F and 43A
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44
45
ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5), or ftom a dam constructed on a watercourse or lake?
{XJ No -Gotoas5 [_] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, items 3(a); 1P Regulation, schedule 2. tabie 2. item 8: IP Regutation, schedule 1. part 3, table 4, items 3 and 34; Water Act 2000, section 966A (wild river
area); Wild Rivers Act 2005, section 434; relevant wild river declaration: Wild Rivers Code
ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
46
47
48
kK No Goto 04.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). IF NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3(b); JP Regulation, schedule 2, table 2. item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water}
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
No -Gotoa47 [] Yes - Answer (a) and (b) below
IPA, schedule 8. part 1, table 4, item 3{c}{i): IP Regulation. schedule 2, table 2. item 8: iP Regulation, schedule 1, part 3. lable 4, item 3. Water Act 2000 section 966A (wild river area);
Wild Rivers Act 2005. section 434, relevant wild nver declaration Wild Rivers Code.
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
BX] No -Gotoose ((] Yes
IPA, schedule 8, part 1, table 4. item 3fc)(ii): IP Regulation, schedule 2, table 2, item 8: IP Regulation, schedule 1. part 3, table 4, item 3
Water Act 2000, section 966A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable}
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)
Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
[EX] No -Gotoaa9 [_] Yes - Answer both (a) and (b) below
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
IPA, schedule 8. part 1 table 4 items 3ic)ij and 3/d) IP Regulation scheaute 2. iable 2 em 9 IP Regulation scheduie 1. part 2 table 4 item 34 Water Act 2000. section 9668 (wild
fiver area). relevant wild nver declaration, Wild Rivers Code
49 \s the proposed operational work for the following?
()} For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
® No (7 Yes
Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% KI No (1 Yes
if yes to either or both (i} or (ji) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule 8. part 1. table 4, item 4: IP Regulation. schedule 2, fable 2. item 10
(TIDAL WORK; WILD RIVER AREA ]
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
(J No -Gotoaat1 Yes - Answer (a) and (b) below
(a) 1s any of the proposed tidal work prescribed tidal work?
&X] Yes [_J No
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild
Rivers Act 2005?
>] No ([[] Yes
If no, is the work proposed in a canal?
L.INo —& Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
No - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime
Safety Qid) as Concurrence Agency.
C1 Yes- {Complete Form 1, Part P). This application must be referred to QueensiandTransport (Maritime
Safety Qld} as Concurrence Agency, and Qld Fire and Rescue Service as Advice Agency.
(b) Is any of the proposed tida! work to be carried out in one or more of the following tidal areas?
(0) One only tocai government tidal area [I No XX Yes
(ii) Starting in one local government tidal area and extending into another local 1 No Yes
government tidal area (but in no strategic port tidal area)
(iii) In two or more local government tidal areas but not starting in either local
government tidal area CL] No [] Yes
(iv) One only strategic port tidal area CI No CO Yes
(vy) Ata area that is not a strategic port tidal area or a local government tidal [1 No Cl Yes
Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application.
IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2, table 2. dems 12. 14 and 17; IP Regulation, schedule 1, part 3, lable 4, tems 4A and 5
Coastal Protection and Management Act 1995, section 104A (wild river area)
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA : |
411 1s any of the operational work proposed to be carried out within a coastal management district?
[DX] No -Gotoas72 [_] Yes
IPA, schedule 8, part 1, table 4, item 5; iP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995 Ac! 1995, section 104A (wild river area): Wild Rivers Act 2005, section 43A
iWATERWAY BARRIER WORKS; WILD RIVER AREA |
4.12 |s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
DX] No -Gotoaa13 [7] Yes
JPA, schedule 8. part i, table 4. item 6. IPA. schedule 8, part 2, table 4, item 2: Fisheries Regulation 1995 $1124 (self-assessable codes}: IP Regulation. schedule 2, table 2. item 28; 1P
Reguiahan, schedule 1. part 3. iable 4, tem 6; Fisheries Act 1994, section 76D (wild river area): Wild Rivers Act 2005, section 43A.
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
|DECLARED FISH HABITAT AREA; WILD RIVER AREA |
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
DX] No - Goto Q4.14
LJ Yes
IPA schedule 8 part 1 table 4 tem 7 IPA schedule 8 part 2. table 4. item 3. Fisher'es Regulation 1995 511A (sel-assessable codes). 1P Regulaton, schedule 2 table 2. stem 25. /P
Pegulaton scheaule 7. part lave 4. cem 7, Wid Rivers Act 2005 secuens 424 Fisheres Act secon 76DC {wild aver areal.
[REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA |
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
[KJ No -Gotoas15 [(] Yes
IPA, schedule 8, part 1, table 4, item 8. IPA, schedule 8, part 2. table 4, item 4: Fisheries Regulation 1995 s113A (self-assessable codes): iP Regulation, schedule 2. table 2, item 29: IP
Regulation, schedule 1, part 3, table 4, item 8: Fishenes Act 1994, section 760B (wild aver area): Wild Rivers Act 2005, secon 434; relevant wild river declaration; Wild Rivers Code,
{WILD RIVER AREA §
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No -Gotoa4.16 [] Yes
IPA, schedule 8, part 1, table 4, item 10; IP Regulation, schedule 2, table 2. item 37; Wild Rivers Act 2005, sections 42, 43A
[STATE:CONTROLLED-ROAD:
4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[XJ No -Endofsection4 [_] Yes
IP Regulation, schedule 2, table 2. item 3
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims alll liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.
Page 14
L-8Z1/60_ ws | oe:h wes 2 ‘SaTd V7 NIW URLS - CWSRELL NVId SIS XV ROW “EIST a= ah. “LINS OL Pr SdB1S LOMRLSNOO | ALLS ODG s oma one OS GNS HOVA SMSHOS T3aL8 | g E E “be — 8 — someon ris iw ; GMH P14 SZ x BE @ F ¢ ONDIOSG = |, — ; a +——__+ \. uaa ALL2P dO LUVd ON VAASM HSRivd 2901 N €101 JOS/W G°0 - ALIDOTSA ONIHLYSE Nouanoesa wc - T3SS3SA GSYOOW WNWIXVN ONT iid - ALuadOUd Wat SONVOUOOOY MI GSTIVISN 98 TIVES Sd TY Bd 0% - G¥O1 SAN NOISSG COOMOLVH CBAOUSV 3a TIVHS Sd TIV ™en TWOILYSA HOSC AVM TIVM SIN £101 (+ “ \w/NOILLOSS it BAINUG VYNNAM | “SONIMVEO SHL ORL C=TVOS 38 LON TIVHS STAT ONV SNOFENSINO ‘9 CBHSVT d¥D ATMS ONV OFIV3S 38 TIVHS S31id 40 dOL ‘Y i “W3ALS SSTINIVIS UO-CESINVATVD Caddid LOH 38 TIVHS "0113 ‘STIVN ‘SMUG ‘SUSHSYM 'S.1104 ‘SLIN ONION TON! _. | JROMTERLS UIHLO TIV ‘DIE 30VuO SNRIVN GaA0tdd¥ 38 TIVHS “O13 ‘900U '8L108 GALS SETINVIS TH E q m7 F 5 “3g BUWAREd HOS SUELLVM YO | SONV1 TVOLL NO SRIOM JO NOLLOMRLLSNOO YO4 <SSNTISOINS. | 'SADN3OV NOLLOBLOUd “WLNSIINOUIANS SHL HIM A710 l TIVHS NOLLOMULSNOO Ti 3SWUEHLO GSLON SSSINN Z ~ | el | ‘NIN vid JO B0vUD SSmUSY woe — La |_ “ SAVH GV SS08d8 CEMORN JO | SSO AL vavunG KROQ KKK — / eo ean IES om TIVHS USGVEL, TY SSIWUSHLO CALON SSSINN oR oR ‘SALON an arom a a — : io wesO 180 1030 ee 3s WOOL
Used in these records
09/1247 - Prescribed Tidal Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 845 KB (small file)
- File type
No other editions are linked here.