Skip to the record
The gold standard in government transparency.

Council archive · source document

09/1247 - Prescribed Tidal Works [As Published] · 142009.1247

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 22

 

 

SECTION 4 + Section 4 must be completed when the application seeks approval to carry out operational work.

 

 

 

 

PLANNING SCHEME . —
41 Is the proposed operational work assessable under any State planning regulatory provisions?
KI) No [] Yes
If no, is the proposed operational work assessable under the planning scheme?
KX] No - Goto 04.2 (71 Yes - Complete Form 1, Part € and answer 04.1.1 - 4.1.7 below

‘KSSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL,

‘AREA
42

 

 

Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
[X] No -Gotoas3 (_] Yes
IPA, schedule 8, part 1, table 4. item 2: IP Regulation, schedule 1, part 2, table 5, item 1(c)

Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban

area}

COMMERCIAL OR INDUSTRIAL DEVELOPMENT INA WILD RIVER |
d

 

|KOALA CONSERVATION (Inside SEQ urban footprint)

4.3A

ls any part of the premises in an interim koala habitat protection area?

{X] No -Gotoa43a ((] Yes
IP Regulation, schedule 2, table 2. item 34A

_I

 

‘VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA

4.3B

\s any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

[X] No -Gotoas4 (] Yes

IPA. schedule 8, part 1, table 4, items 14-1G; IP Regulation, schedule 2, table 2, item 5 (vegetation clearing): IP Regulation, schedule 2, table 2. item 34 (koala

conservation); IP Regulation, schedule 1, part 3, table 4, tem (vegetation clearingAvild river area); Vegetation Management Act 1999, section 22A (vegetation
clearing’wild river area); Wild Rivers Act 2005, sections 31F and 43A

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA

44

45

ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or

interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5), or ftom a dam constructed on a watercourse or lake?

{XJ No -Gotoas5 [_] Yes - Answer (a) and (b) below

IPA, schedule 8, part 1, table 4, items 3(a); 1P Regulation, schedule 2. tabie 2. item 8: IP Regutation, schedule 1. part 3, table 4, items 3 and 34; Water Act 2000, section 966A (wild river

area); Wild Rivers Act 2005, section 434; relevant wild river declaration: Wild Rivers Code

ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or

interfering with artesian water (other than using a water truck to pump water)?

46

47

48

kK No Goto 04.6 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). IF NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 3(b); JP Regulation, schedule 2, table 2. item 8; IP Regulation, schedule 1, part 3, table 4, item 3

Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water}

Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?

No -Gotoa47 [] Yes - Answer (a) and (b) below

IPA, schedule 8. part 1, table 4, item 3{c}{i): IP Regulation. schedule 2, table 2. item 8: iP Regulation, schedule 1, part 3. lable 4, item 3. Water Act 2000 section 966A (wild river area);

Wild Rivers Act 2005. section 434, relevant wild nver declaration Wild Rivers Code.

Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
BX] No -Gotoose ((] Yes

IPA, schedule 8, part 1, table 4. item 3fc)(ii): IP Regulation, schedule 2, table 2, item 8: IP Regulation, schedule 1. part 3, table 4, item 3
Water Act 2000, section 966A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable}
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)

Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?

[EX] No -Gotoaa9 [_] Yes - Answer both (a) and (b) below

Used in these records

About this file

File size
845 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1247 - Prescribed Tidal Works [As Published].pdf · 845 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.