Original source · versioned page text
2018-05-14 GC Agenda Attachment 1 to Item 6 Lake MacDonald Dr Community Reference Group Investigations Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
6.1 Discussion of results The results show there is a small increase in flood levels immediately downstream of some of the urban areas. However, these small increases are attenuated as flood waters expand across the floodplain and pass through the significant waterway crossing of the north coast rail line. The rail line includes a high embankment which guides upstream flood waters towards the bridge opening immediately upstream of Elm Street. The constriction of the bridge acts as a hydraulic control allowing controlled rates of flood waters to pass through the bridge opening. This controlling affect removes any evidence of the small increase in flood levels simulated upstream of the crossing. This analysis demonstrates that if the planning scheme did not contain provisions to manage additional stormwater runoff then a small increase in design flood levels could be observed in areas upstream of the north coast rail line; however, these increases do not translate to areas downstream of the rail line. On the basis of the simulation results and with consideration of the provisions of the Planning Scheme this analysis concludes that planned increases in urbanisation within the Cooroy township urban footprint will not increase peak flood levels in the vicinity of Highland Drive, Lake MacDonald. Lake McDonald Flooding Community Reference Group Report Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.