Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2018-05-14 GC Agenda Attachment 1 to Item 6 Lake MacDonald Dr Community Reference Group Investigations Report

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Image 5-1: Shallow floodplain channels near Liane Drive



Option 2A - High level earth bund from Liane Drive
As per Option 1; however, with the earth bund raised to an elevation above the major flood level.
This would require the earth bund to be approximately 2m above the natural ground surface.

The flood model results demonstrated similar reductions in flood levels in the vicinity of Highland
Drive as seen for Option 1.

Localised upstream increases in flood levels exceed 1m immediately upstream of the higher bund.
Downstream along the main branch of Six Mile Creek flood levels increased by approximately 100
to 250mm for both moderate and major flood events. Refer to Figure 13 and Figure 14.




Lake McDonald Flooding Community Reference Group Report                                       Page 21
Log in to download the original file

2018-05-14 GC Agenda Attachment 1 to Item 6 Lake MacDonald Dr Community Reference Group Investigations Report(PDF, 4MB).pdf · 4.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.