Original source · versioned page text
2018-05-14 GC Agenda Attachment 1 to Item 6 Lake MacDonald Dr Community Reference Group Investigations Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Image 5-1: Shallow floodplain channels near Liane Drive Option 2A - High level earth bund from Liane Drive As per Option 1; however, with the earth bund raised to an elevation above the major flood level. This would require the earth bund to be approximately 2m above the natural ground surface. The flood model results demonstrated similar reductions in flood levels in the vicinity of Highland Drive as seen for Option 1. Localised upstream increases in flood levels exceed 1m immediately upstream of the higher bund. Downstream along the main branch of Six Mile Creek flood levels increased by approximately 100 to 250mm for both moderate and major flood events. Refer to Figure 13 and Figure 14. Lake McDonald Flooding Community Reference Group Report Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.