Council archive · source document
Response to Information Request OPW20-0145. 19.10.2020 · OPW20/0145
. Indicate the location of the emergency gate as described in Condition 2.1 (Lot 23) 2.1. identification of the proposed emergency access for Lot 23 and that the proposed emergency gate is located in the road reserve in accordance with condition 8; Stockwell Response Barlow Shelley have updated their plans to include an emergency access gate (double swing gate IPWEAQ GS-08) to the emergency access egress to Lot 23. Please refer to drawings number 1856-R41D. . Provide Energex approval for the access for Lot 23 (Condition 7) for that part that stands within the Energex easement. 7. Prior to the sealing of the survey plan a vehicle access to proposed Lot 23 must be constructed at no cost to Council. The works must be undertaken in accordance with an Operational Works approval, be generally in accordance with drawing number 1856- R08 Revision J prepared by Barlow Shelley and include an access extending from the existing roundabout in Walter Hay Drive to the property boundary. Stockwell Response Stockwell has referred OPW20/0145 to Energex as the relevant referral agency pursuant to section 54(1) of the Planning Act 2016. Energex has provided approval for the access for Lot 23 (Condition 7) subject to conditions 1-8 outlined in their letter dated 07 October 2020. We attach a copy for your referral. . Provide a detailed plan of the pathway connection to Lot 23 as described in Condition 9 9. Prior to the sealing of the survey plan a new pedestrian access from Lot 23 to the existing pathway network must be constructed at no cost to Council. The works must be undertaken in accordance with an Operational Works approval. The pedestrian connection must be located in the north western part of the site and extend to the existing pathway network in the Eenie Creek Road road reserve to the east of the underpass. Stockwell Response Barlow Shelley have updated their plans to include the detailed plan of the pathway connection to Lot 23. Please refer to drawings number 1856-R41D. . Indicate on the relevant plans the signage as described in Condition 15. 15. Clearly visible signage must be erected at the threshold of the private roads. The signage must clearly indicate to motorists and pedestrians that they are entering a private road system. Stockwell Response Barlow Shelley have updated their plans to include private road signage at the threshold of any private roads. Please refer to drawings 1856-R65D and R68D. . Clarify the proposed width for Road B and demonstrate compliance with Condition 16 416. Prior to the sealing of the survey plan, the private road within Lot 3 (Road B adjacent to Lots 10-16) must be constructed with a centrally located 10m carriageway. The works must be in accordance with an Operational Works approval and be generally in accordance with drawing number 1856-R05 revision K prepared by Barlow Shelley. The works must include but not be limited to kerb and channel, footpaths, street lighting, services, linemarking, stormwater drainage and landscaping. Stockwell Response Road B is proposed as a 10m wide carriageway with 2 x 3.5m travel lanes and a 3m parking lane along the southern side of the carriageway. Please refer to drawings 1856-R46D. a LOPMENT |= FUNDSMANAGEMENT = PROPERTY MANAGEMENT __ DESIGN & CONSTRUCTION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request OPW20-0145. 19.10.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.