Skip to the record
The gold standard in government transparency.

Council archive · source document

Response to Information Request OPW20-0145. 19.10.2020 · OPW20/0145

of 11

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

19.

20.

Zhe

Provide comment on any layout changes that have been included and demonstrate how the changes are in
accordance with judgement No 765 of 2020

Stockwell Response

No layout changes have occurred in relation to boundaries, roads, and landscaping, except the Easements
modified in accordance with Judgement No 765 of 2020. These are:

Lot 1:
i. | Easements AM & AN have been combined to a single 6m wide Easement AM
ii. Easement AF between Lots 2 and 7 now includes the area of the adjacent “new road” connecting to Walter
Hay Drive, along with secondary access to Lot 24 by way of left in left out access along the full northern
boundary of Lot 24.

Lot 3:
ili. Easement AL — benefits lots 1, 4 and Public Thoroughfare, with a minimum width of 4m.
iv. Easement AK — benefits lots 1, 6, 7, 8, 9.
Vv. Easement AP — benefits lots 10, 11, 12, 13, 14, 15, 16.

Lot 8:

vi. Easement AS — benefits lots 7, 9 and Council for stormwater.
Lot 9:

vii. Easement AR — benefits Council for stormwater.

Clarify if a further operational works application will be lodged to satisfy condition 44 or provide updated
plans to satisfy condition 44,

Stockwell Response

Element Designs have updated their plans to include the areas of Open Space 3 (OS3) to be rehabilitated to provide
a vegetated screen of future development. These areas are to adjacent to the emergency access egress on Lot 23,
the Lot 23 vehicle crossover, the Lot 11 Emergency Access Road crossover, and the stormwater outlet from Lot 9 onto
Walter Hay Drive. These areas will be planted at a density of 1 plant per m? with suitable rehabilitation species (see
10m buffer species list). Please refer to Element Design Drawing ED-20265 OPW-18 and OPW-19.

Clarify if a further operational works application will be lodged to satisfy condition 49 or provide updated
plans to satisfy condition 49, and include access gate to Covenant L.

Stockwell Response
Barlow Shelley have emended their plans to include:

- 1.8m high chain wire fence to the perimeter adjacent Covenant J on the boundary of Lot 17, the boundary of
proposed Lots 12-15 and Lot 5 on SP222982, proposed Lot 12 and Lot 3 on SP182845, and the bound of
proposed Lot 23 and Lot 147 NPW889.

- Single person access gate (minimum opening of 1200mm) in the location of the rear of Lot 13 to SP222982, and
to Covenant J from Proposed Lot 17.

- Signage for each Lot interface stating the land is a fauna reserve.

Please refer to drawings number 1856 R35-R38 and R41 detailing the specification of the 1.8m chain wire fence in
accordance with AS 1725.1.

Page 6

 

ENT PROPERTY MANAGEMENT DESIGN & CONSTRUCTION

Used in these records

About this file

File size
4.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request OPW20-0145. 19.10.2020.pdf · 4.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.