Council archive · source document
Response to Information Request OPW20-0145. 19.10.2020 · OPW20/0145
29. 30. d) Emergency access markers & identifiers will be attached to all emergency access gates. e) The fuel loads associated with the 20 metre break between proposed Lots 3 and 7, interface between Covenant J and the 20 metre buffer on Lot 23 will be maintained by mechanical slashing/mowing conducted within the determined pre fire season (August — October) or as required to conduct mitigation burning and other management operations. The maintenance of these areas will be the responsibility of the Noosa Civic Centre Management. f) The identified covenant areas will not be cleared for bushfire management. Provide amended landscape plans showing landscaping to the splitter island, suitable for pedestrian and vehicle sight lines. Stockwell Response Element Design have amended their Landscape Plans to include landscaping to the splitter island, suitable for and vehicle sight lines to lot 23 on. Please refer to Element Design drawing ED 20265 OPW-14 and Barlow Shelley drawing 1856-R40. Insufficient information is provided for the bioretention devices proposed within the streetscape to demonstrate: i. Sufficient offsets to underground services in accordance with utility services provider's requirements ii. Safe movement of pedestrians and bicycles (where shared access paths) along the road verge iii. That batter slopes are stable and design to avoid the need for safety fencing or bollard, or incorporate grates iv. The plantings are setback from the road pavement a sufficient distance to not affect the road pavement during operation or re-setting v. That aconnection from the kerb to the filter media surface is provided which is sufficiently robust and not prone to blockage vi. That sufficient width exists to accommodate the devices In general, it appears that extended detention depths are too great and allowance for batter widths too narrow to make open bioretention function correctly. Covered/grated systems may need to be employed if the below issued cannot be sufficiently resolved. Stockwell Response Barlow Shelley have amended drawings 1856 SW0O1-SW30 in response to items 30 — 34 to demonstrate the following: - Extended Detention depths nominated to all bioretention cross sections - Spot levels for road pavements, kerb inverts and footpaths added to bioretention cross section or new surface section details included for street trees. - DN100 PVC-slotted underdrains shown on bioretention plans - Verge services (storm water, water, sewer, telecoms, electrical) - Bollards to the perimeter of swale and Bioretention basins in Road A have been removed. - Batter grades have been amended with proposed extended detention depths to ensure street tree and basin ponding depths remain below the kerb invert line. Street tree pits are not proposed to be grated and will functions effectively for the subdivision works. For the future development of Lots 3 and 7, street pits along Road C may be required — this will occur at the time when it is clear if this is needed at the time of the MCU for these sites. We note that Road C is a private road. rage
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request OPW20-0145. 19.10.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.