Original source · versioned page text
SUPERSEDED Other Change Decision Notice - Council Meeting Decision 132008 176 05 [As Published]
55. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
56. Any redundant easements must be extinguished prior to the commencement of the use.
57. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
58. All works must be carried out in accordance with a site specific Geotechnical Report (or
part thereof) prepared by a qualified person* and endorsed through an Operational
Works approval.
*(Refer to Advisory Note)
59. Prior to the commencement of the use certification must be submitted to Council from a
qualified person* which certifies that the development has been constructed in
accordance with the recommendations contained in the site specific geotechnical report
and that the development has a minimum factor of safety against landslip of 1.5 in the
long term.
*(Refer to advisory Note)
Earthworks and Retaining Walls
60. All earthworks and associated retaining structures/batters, both above and below
ground, both temporary and permanent, must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
All earthworks must be undertaken in accordance with an Operational Works approval.
61. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
62. Where the development involves excavation or filling over, or adjacent to, drainage,
water supply or sewerage infrastructure, all access chamber surface levels must be
adjusted to provide a freeboard of 100mm above the finished ground surface level.
63. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Acid Sulfate Soils
64. An Acid Sulfate Soil Management Plan must be prepared and submitted with the
Operational Works Application for the site. The Acid Sulfate Soil Management Plan must
include testing, monitoring and treatment requirements for the works.
Damage to Services and Assets
65. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Page 10 of 39
Document Set ID: 23308496
Version: 6, Version Date: 24/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.