                                iii.   proposed fencing to the site during the construction phase of the
                                       development
                                iv.    approval of the Traffic Management Control Plan by the Department of
                                       Transport and Main Roads (DTMR) for any works on State controlled roads
                                v.     provision for worker car parking
                        b.      maintenance and protection of water quality and existing drainage lines through
                                the construction site, through the implementation of appropriate erosion and
                                sediment control measures
                        c.      works programme identifying key components of the works and their respective
                                durations
                        d.      establishment of a communication protocol with the general public, adjoining
                                owners, emergency services and local businesses to advise of agreed
                                construction times, impacts on traffic, services and other relevant issues.
                        e.      Include a post out to the local residents and businesses advising of the proposed
                                development, the expected time frames and the site contact details.
                        f.      Include signage in prominent locations on the boundaries of the site advising of
                                the proposed development, the expected time frames and the site contact details.
                        g.      identification of complaint management procedures including:
                                i.     contact details for the on-site manager
                                ii.    dispute resolution procedures
                        h.      details on the location of external fill/dump sites/sources, the haulage route, type
                                of vehicle to be utilised during filling operations and frequency of usage. NB any
                                damage to the existing road system as a result of haulage operations shall be fully
                                repaired at the applicant’s expense
                        i.      it is acknowledged that the preliminary Construction Management Plan will be a
                                draft document requiring finalisation upon appointment of the Principal Contractor
                                employed to construct the works and a final document will be required to be
                                submitted at the Pre-Start Meeting for the project.
                        Private Infrastructure
                 5.     All private infrastructure for the development must be designed to meet the planning
                        scheme requirements unless otherwise agreed by the relevant authority
                        Qualified Person
                 6.     For the purpose of preparing a Landscape Plan, a qualified person is considered to be
                        a landscape architect, landscape designer and/or horticulturist with a minimum of 3
                        years current experience in the field of landscape design.
                 7.     For the purpose of preparing an Arborist Report, a qualified person is considered to be
                        a person with either:
                        a.      ISA certification; or
                        b.      a Diploma of Arboriculture in addition to a minimum of 3 years current experience
                                in the field of arboriculture.
                 8.     For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to
                        be a landscape architect or ecologist with a minimum of 3 years current experience in
                        the field of landscape design.




                                                                                                         Page 16 of 39
Document Set ID: 23308496
Version: 6, Version Date: 24/10/2024
Log in to download the original file

SUPERSEDED Other Change Decision Notice - Council Meeting Decision 132008 176 05 [As Published].pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.