Original source · versioned page text
124-003 Engineering Report
Very large file: it may take a few minutes
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
stormwater infrastructure in this location which will be utilised as a lawful point of discharge. This 225mm dia.
stormwater pipe collects runoff from the adjacent property to the east and enters the stormwater network in
Gumdale Court to the south. It is expected that the design of the building and surrounds will utilise the
stormwater system to collect minor storm events and roof water runoff while major events will be directed to
the Bartlett Road frontage. It is expected some earthworks will be needed to achieve these design levels and
for standard vehicle and pedestrian access to the proposed development.
Figure 2 – Stormwater Network and Contour Plan
Source: Noosa Council Mapping
Page 6 of 12
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.