Council archive · source document
Planning Assessment Report · MCU19/0008
Attached to the e-mail Detached House in Coastal Protection Area - MCU19/0008.
22 Arakoon Crescent, Sunshine Beach PLANNING ASSESSMENT REPORT O4 S4.1 Filling or excavation does not adversely affect sewer, Fill material placed over services does not impose any The proposal will not include or require significant stormwater or water utility infrastructure. additional surcharge loading on the service. filling or excavation. S4.2 Where excavation is carried out – The proposal will not include or require significant a) a minimum cover of 600mm is maintained around filling or excavation. all utility infrastructure (to top, sides and base of services); or b) a retaining wall is provided to support the soil surrounding the service. S4.3 Compaction with a vibrating roller is not carried out The proposal will not utilise a vibrating roller within within 600mm of any utility infrastructure. 600mm of any utility infrastructure. O5 S5 Development does not adversely impact on the Lake Buildings or other structures within the Lake The site is not located within the Lake Macdonald Macdonald water supply. Macdonald catchment (indicated on Figure 14.7) are catchment. located above the 98.5m AHD level. Services and utilities O6 S6 The house is provided with infrastructure, services Where located in an urban zone, or a water or The site is already connected to reticulated sewerage, and utilities appropriate to its setting. sewerage service area, appropriate connection is water supply and stormwater drainage. provided to reticulated sewerage, water supply and stormwater drainage. Electricity supply infrastructure O7 S7 Uses and works maintain an adequate safe distance Buildings and structures (including swimming pools, The site is not located under overhead electricity from electrical infrastructure including substations, sheds, tennis courts or outbuildings) are not transmission lines, nor is it located within an overhead powerlines, power poles and transformers. constructed under overhead electricity transmission electricity easement. lines, or within electricity easements. TP19/5080 © Bartley Burns Certifiers & Planners P a g e | 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.