Skip to the record
Search everything, all in one place.

Council archive · source document

Planning Assessment Report · MCU19/0008

Attached to the e-mail Detached House in Coastal Protection Area - MCU19/0008.

of 46

Text shows just the words. Original shows the document exactly as it was published.

22 Arakoon Crescent, Sunshine Beach
PLANNING ASSESSMENT REPORT


 Haulage routes separation area
 O8                                                        S8
 Development does not adversely affect the safe and        Development does not increase the number of           The site is not located within an extractive resource
 efficient operation of vehicles transporting extractive   properties with access points to the haulage routes   area.
 materials.                                                shown on Overlay Maps OM1.5–OM9.5.
                                                           OR
                                                           S8.2
                                                           Development access points are designed to ensure
                                                           the safe and efficient operation of vehicles
                                                           transporting extractive materials.
 Design and operation
 O9                                                        S9
 The design and operation of extractive resource uses      No solution provided.                                 The site is not located within an extractive resource
 minimises and mitigates the potential for adverse                                                               area.
 impacts on environmentally sensitive areas and
 amenity of existing uses.
 Extractive resources
 O10                                                       S10
 Industrial business Type 3 extractive are designed,       No solution provided.                                 The site is not located within an extractive resource
 located and operated to ensure –                                                                                area.
 a) haulage routes associated with extractive resources
 –
 i) are located on roads where the haulage route will
 minimise adverse impacts on residential and urban
 residential amenity;
 ii) are located on roads which are of adequate
 construction, or may be upgraded, to a standard
 commensurate with the volume, type and nature of
 the vehicular traffic utilising the haulage route; and
 iii) are adequately maintained as a part of the
 utilisation of the extractive resource;


                                                                                                                                                                 TP19/5080
 © Bartley Burns Certifiers & Planners                                                                                                                           P a g e | 38

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Planning Assessment Report.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.