Council archive · source document
SUPERSEDED Decision Notice - 010.2007.00000012.001 [As Published] · 132007.12
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 13
Processing of bonds for security where specific Council approval has been given for the bonding of
contributions will incur an administration fee in accordance with Council’s Land Development Commercial
& Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the paid contributions and/or the trading bank guarantee will be returned
General
56. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be submitted in
conjunction with an application for a Development Permit for Operational Works. To avoid conflict with
underground pipes or services, all existing and proposed services required by the development shall be
shown on the plans.
57. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
58. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
Environmental Health
59. The developer must provide waste storage and disposal facilities in accordance with Planning Scheme
Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an
external imperviously paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties.
60. Refuse containers must be provided in accordance with the requirements of the Environmental Protection
(Interim Waste) Regulations 1996 and (Waste Management) Regulation 2000, for the storage and
collection of refuse.
61. All refrigeration plant including motors, shall be situated within the building or suitably provided with noise
reduction measures and located as to prevent a noise nuisance beyond the subject land in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply for
such offences.
62. Noise emission from air conditioning equipment shall comply with the following requirements:
62.1. The equipment shall be installed and located in a manner which prevents noise nuisance beyond
the subject land in accordance with the nuisance provisions of the Environmental Protection
Regulation 1998 and Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-
the-spot fines) may apply for offences.
62.2. Submission of written certification from a suitably qualified person confirming that the noise levels
comply when measured at the nearest residential boundary. This is required immediately after
installation of the equipment and prior to any occupation of the building, and in a format approved
by Council.
62.3. A person must not use equipment on any day if it makes or causes noise to be made –
62.3.1. Before 7am or after 10pm: More than the lower of either –
40 d(B)A
3 d(B)A above the background noise level
62.3.2. From 7am to 7pm: More than the lower of either –
50 d(B)A
5 d(B)A above the background noise level
62.3.3. From 7pm to 10pm: More than 3 d(B)A above the background noise level.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@b00795bc\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2007.00000012.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 61 KB (small file)
- File type
No other editions are linked here.