Stormwater Drainage
13. All on site stormwater including roof water is to be disposed of on site via an infiltration pit and in a
manner that does not compromise the stability of the site.
Earthworks
14. If any excavation work are require at or near any of the boundaries for the purpose of footing and
foundation construction, car must be taken to ensure no earthworks/batters extend over the property
boundary.
15. The site is located in a Sand Dune Problem Area and will require appropriate soil testing by a
Geotechnical Engineer and design of a soil retaining system by a Structural Engineer. Clearance shall be
obtained from Council’s Manager of Building as part of the process of obtaining a Development Permit for
Building works.
Erosion & Sediment Control
16. To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with any
Development Permit for Building Works. Site control measures such as silt fencing, controlled gravel
access to the site and controlled disposal of waste, may be necessary. Prior to commencement of
building works, all physical site control measures shall be installed, and the plan adhered to.
General
17. The alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council
18. A Development Permit for Operational Works for access shall be obtained prior to commencement of
construction. Plans shall also indicate any proposed retaining structures associated with access.
Building Services
19. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
with Council at completion of the work confirming compliance with the maximum building height of 8
metres above natural surface, required by the provisions of the Planning Scheme.
20. The Geotechnical report submitted as part of your application has been appraised and approved subject
to the following conditions:-
20.1. There is to be no uncontrolled discharge of water onto the slope;
20.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is destroyed it
should be reinstated immediately after construction is completed;
20.3. Additional load due to fill, construction equipment or stockpiled materials should not be located on
the dune slope;
20.4. The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers,
the use of vibrating installation techniques for sheet piling and other construction vibrations caused
by excavating, earthmoving or demolition machinery or other similar construction techniques;
20.5. A RPEQ is to be engaged by the client to oversee the sheet piling works and copies of all
inspection reports are to be submitted to Council within 5 business days of the inspection taking
place.
H o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 35 KB (small file)
- File type
No other editions are linked here.