08/0858 - Operational Works - Landscaping, Access and/or Carparking, Stormwater Drainage, Frontage Works & Excavation of Materials to Fill Another Site [As Published] · 142008.858
sunshine Coast Checklist - Applications Involving Land Regional Council Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. 1. APPLICATION FORMS 4.14. Form1PartA ea 4.1.1. Ensure that the form is fully completed and is a current version. 4 4.1.2 In the case of an MCU or Op Works below the high-water mark, owner's consent is required. 4.1.2.1 If there are multiple owners, the consent of each owner is required. 4.1.2.2 If the owner of the fand is a company, either ACN No, Company name clearly indicated by signatory) or Company Seal required. 1.2. Form’ Part B-R Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. 4.1.2.1 Ensure that each of Forms B-R which are attached are fully completed. @ IDAS ASSESSMENT CHECKLIST 2.1 Ensure that relevant sections have been checked and/or completed with regard to referrals 2.2. Ensure correct parts of Form 1 are provided where required (ie most common are Part J for Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works) 3. ENVIRONMENTALLY RELEVANT ACTIVITIES 3.1. Ensure that Part G is completed if EPA referral is required. 2 O8F ON 3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. (Refer Environmental Health for fees) x 4. FORM 2 - REQUEST TO CHANGE APPROVAL 4.1 Ensure that relevant items have been checked and/or completed including information regarding applicant details along with owners consent if not current owner of fand as shown on Council records. lf over multiple properties on one or more sites, consent of Body Corporate is required. 5. [email protected] Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational 3 Works) accompany the application. In addition ensure that each set is complete. 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is / unbound. 6. SUPPORTING INFORMATION 6.1 Ensure that generally at feast 6 copies of any report accompanies the application (5 for Reconfiguration and Operationa! Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. WA 6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping 7. FEE 7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees, accompanies the application or has been paid. u-T « Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty or if including Landscaping. « and Development Lot Reconfiguration applications and Operational Work not including Landscaping Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. NSC g:Manduse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 27 pages
Page 2
Sunshine Coast and use section Fees Regional Council RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Change of Use Goddiimpact Consistent 521 Inconsistent : §21 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit 521 Extension of a Currency Period. 521 Operational Works - Landscaping 521 @ Bldg Work assessable against the Planning Scheme. lors 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour 522 ADVERTISING . Purchase Advertised Applications §23 JETTIES . / : Jetty Application Fee - 524 ‘ Jetty Bond : _. 51 : : : (Category 4) BONDS ” Performance Bond 51 . (Category 9) SIGNS . . Registration Fee : 222 sficu FEE . . Search of Land Use Section file. 112 Liquor Licensing Request , : 413 TOTAL ‘$ [O77 name: Vaslerb, Pj ADDRESS: C/o Rarie bsicse COWIS5S ~— Noose Wen0s - ALO - IST FILENO: _)c03/85S —_ pate: 19/5/o% RECEIPTNO: 40/282 - Signature of TP Officer: AUTHORITY No: |+ 7008 - 0858 - |
Page 3
j DEVELOPMENT FEES & CONTRIBUTIONS
SUNS hine C O a st (Cashier: Wfase Retum to Admin Officer, Development) ®
q
|. |” APPLICATION AND GENERAL FEE
ond Refund Details .
“RECEIPT TYPE | BONDS -
540 Payee Name:
Address:
“Application Fees
Road / Drainage Plan Exam
Road / Drainage Field Inspection
Lega! Document Examination
Sealing Fee - Survey Plans, Legal Documents
Sale of Documents, Policy Lists, Misc
Bonding Admin Fee (Contributions, uncompleted works)
Closed Circuit TV Inspection
Pre-lodgement Meeting Fee
‘CONTRIBUTIONS
Developer Contribution Landscaping _
Developer Contribution - Road Other than PSP
Developer Contribution - Drainage Other than PSP
Developer Contribution - Pathway Other than PSP
Developer Contrib, — tn Lieu Off St Parking (PSP13 Car parking)
Developer Contribution - Other Parks and Community
ICS - Community Land (Not currently active)
ICS — Public Transport
ICS — Sewerage (PSP Rural)
ICS - Sewerage — South Peregian (PSP Maroochy)
ICS - Water Supply (PSP)
' CALCULATIONS.
Lot Calculation
Plan Examination Calculation
(CS — Sport and Recreation Land (PSP Parks)
ICS ~ Drainage (PSP Noosaville Master & Ward Street)
ICS — Road (CMRNICP) if BA not entered then use 594
ICS — Pathway (PSP)
Development Location:
Total of Fees Paid (Excluding Bonds) 972 Wack OX S
SG
CPE Date: _
eae sa
Security Deposits/Performance/Maintenance/Uncompleted Works Bond
Date application properly made: {6 /5/ 6
Total of Fees Paid (Including Bonds)
P-Land DevelopmentFEES & CONTRIBUTIONSIDEVELOPMENT FEES.doc
Page 4
Bark
16 May 2008
Tracey Arthur
Planning Department f
Sunshine Coast Regional Council
Tewantin Branch i Y 2008
PO Box 141 \ 16 MA
Tewantin QLD 4565 —\ ste - fewantin
Front Counter
Dear Tracey
Development Permit for Operational Works for a Duplex Dwelling situated at 22 Hill Street, Sunshine
Beach described as Lot No. 491 on RP 48112
Please find enclosed the following documents which form the Apptication for an Operational Works
Permit for the above address:
1 Development Permit for Operational Works Form 1 - Part A (5 pages);
2 Development Permit for Operational Works Form 1 - Part E (2 pages);
3 Development Permit for Operational Works - IDAS Assessment Checklist (4 pages).
Please also find enclosed three (3) copies of the following documents:
1 3.x Copies of Earl, Covington and Associates’ Civil Works drawings as listed on the attached
Drawing Issue Sheet.
2 3.x A3 Copies of Landform Landscape Architect's drawings as listed below:
- Cover Page
- Drawing No. 08-501/1
~ Drawing No. 08/-501/2
Should you require any additional information please do not hesitate to contact us.
Yours sincerely
7 C~
~
Lindy Atkin and Stephen Guthrie
Bark Design Architects
Encl.
Bark Design Architects
PO Box 1355 - Noosa Heads - Queensiand 4567 - Studio 185 Sunrise Road - Tinbeerwah 4563
107 5471 0340 F07 5471 0343 wwww.barkdesign.com.au_ & [email protected]
Bark Design Pty Ltd acn 101 764612 asn 30101 764 612
Page 5
INTEGRATED PLANNING ACT 1997
Form 1 Development Application
Part A
Common details
NOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice
"46 MAY 2088
SRG iewandn J)
Front Counter A™
‘Applicant details (The Appicant is he person responsible for making the appfcation and need not be the owner of the land. The Appiicant is responsible for ensuring the
jinformation provided on the IDAS Appication For is correct. This information is refed upon by the Assessment Manager and any referral agencies when assessing and
“decid ing this apptication. By lodging this application, the Applicant incurs the obligations and responsibi'ties prescribed by the IPA. Any development permit or preiminary
tapproval that may be issued as a consequence of this application wit be issued fo the Applicant.)
Company/organisation name (if applicable) [Bark Design Pty Ltd
Individual appticant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)
Postal address [Po Box 1355, Noosa Heads, QLD 4567
Contact telephone number (07) 5471 0340 Mobile phone number 0412127904
Facsimile number (07) 5471 0343 e-mail address [email protected]
Details of the premises (i¢, the Jand on which the development is proposed - refer to the advice af the end of the form) |
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A if the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
| Name of each local goverment area in which the mobile and temporary ERA is proposed fo operate
| 1
OR
Table B Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
() (&] Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF
(ii) [2] Street address /ot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government.)
‘Street Address " ~“{ Lot on plan description —y
Ta Ts Plan fype and Local government area (e.g. Logan, |
No. | No. Street Name and official suburbvlocality name —_| Post Code | Lot No. Plan Number Caims)
1 22 Hill Street, Sunshine Beach 4567 491 RP 48112 Sunshine Coast Regional Council
AND/OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
PTE EE EPR ERT STS SOO Cr ET
(Note: place each set of coordinates in a separate row) Zone Datum Local government area
| Easting Northing Latitude | Longitude | Reference (if applicable)
[1 | (J ocpae4
(7 wesea
CD Other -
2. — Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
Name of water body, watercourse or aquifer (if known)
[1 [NA
Tabte E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on plan description for Strategic portland =f Port Authority for the lot
[1 NIA
Table F Complete if the premises are in tidal water
Name of local government for the tidal area (f applicable) _ ; Name of port authority for the tidal area (applicable)
[1 [wa
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
Total area of premises
540.00 {X]m? [Jhectares (Tick applicable unit)
‘Existing use of the premises ]
4, Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
[1 | Single Dwelling ®
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?
No a Yes - Ensure the type. location and dimensions of each easement are included in plans, submitted with the application
[Proposat details ]
6. Brief description of the proposal (0.9. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)
Duplex Dwelling
7. Does the poposal include new buildings or operational work {including any services) on the premises?
Oo No & Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
(Resource entitlement (if applicable) - futher information is provided in the advice section al the end of the fom |
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land {leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
&) No - Goto 09 O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application, You do nat need to answer Q9 - go to the next section. @
lOwner’ '$ consent (if applicable) _- further information is provided in the advice section at the end of the fam J
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment fo this form if applicable.
Date consent |
was obtained
Premises Owner's name/s Details of the premises owned
and postal address (street address or fot on plan description)
Ross & Dorothy Marlow 22 Hill Street
1 C/- Bark Design Architects | Sunshine Beach VE a. von, 15 May 2008
PO Box 1355 Queensland 4567
Noosa Heads
Queensland 4567
Table H Owner's signature”
“ Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .
Page 7
“¢
Part A, Version 3.1, 3 March 2008
INTEGRATED PLANNING ACT 1997
‘Attachments and supporting information (Complete Table I - Use a separate row for each type of attachment or informabon, including information required
"under this Pari) Please ensure afl documentation submitted with this form, including other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form.
Description of attachment or information = | Tite (fanplcable ~~ T Method of detivery to |
Table | (9. Pat C of Form 1, oner’s consent, evidence of resource (i applicable) Date y
| plans, dea (e.g General Authority, James StreetTrafiic Report) assessment manager;
Part E of Form 1 over the counter
2 Civil Works Drawings as listed in the over the counter
Drawing Issue Sheet
Landscape Plans over the counter
4 IDAS Assessment Checklist over the counter
‘Portable Long Service Leave (PLSL) levy (Applicable for certain buitting and construction work valued over $80,000 only) ]
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if applicable)
(J the application seeks a preliminary approval only;
{X] the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
@ regrowth, thinning vegetation or controlling weeds or pests);
) all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(2 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated), The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
BX] No - End of Pat
[1 Yes - Answer 012 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
- . Receiving officer's CG Reference i,
Fee ($)| 2C4o Date received | [¢ fs 68 name T OLO numbers | C#/O3 2"
e L NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER |
To: Council. | have been engaged as the private certifier for the building work referred to in this application.
_ Dateof / Name - / a BSA Certification number / Bag castatins
engagement . en cee
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment nt manager or private certifier if applicable)
eee oO Date receipted |
cot . . form sighted by | Name of officer who sighted the
Description of the work QLeave Project Number |Amount paid ($)| Date paid assessment form |
j see manager | sane ae!
1
Privacy Statement
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of Information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
Page 8
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 General advice Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger may refuse to receive an application that is not properly made. The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only, Applicant details \* If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided under the IPA. Details of the premises The term premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land. Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete Table A. The premises may be identified in a number of ways — « Street address and lot on plan are most common and will apply to most applications. « Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as Zone Reference or GS84 may be provided. The definition of ‘water body’ and ‘watercourse’ can vary fram Act to Act. StrategicPortLandis within a local government area but a local govemment's planning scheme does not apply onStrategicPortLand. StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on strategic port land) and the Queensland Transport (Ports) website. “Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local govemment's area unless provided for under the Local Govemment Act 1993. Unless otherwise provided for by legislation, a local goverment has no jurisdiction below high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmentat Protection Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work), Resource entitlement Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State- owned land, where evidence is required to be given, and the evidence required to support the application. Link to lntegrated Planning Regulation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence. For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made. For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads. Evidence may be required from more than one Department responsible for a State-owned resource, @.g. from the Environmental Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark, @ Owner's consent Section 3,2,1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the processes of the application or in the event of an appeal about the outcome of the application, “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a Teni). Templates are available from the [PA website for the provision of owner’s consent as an attachment to this form. However other documentation may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises. Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not fequired for a mobile and temporary ERA.
Page 9
*f ;
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Portable Long Service Leave {PLSL) Levy
The Building and Construction Industry Portable Long Service Leave Scheme provides long service teave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland.
The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndusiryTrainingLevy.
The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.
The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy, Building and
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.gleave.qld.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:
www. qleave.qid.gov.au )
Page 10
INTEGRATED PLANNING ACT 1997 Part €, Version 3.1, 3 March 2008 Form 1 Development Application Part E 16 MAY 2008 i 2am Building &/or operational works assessable against a planning scheme \Nature of the works —] 1. Nature of work that requires assessment against a planning scheme: (2) Building work - Complete Table A XI Operational work - Complete Table B Table B (i) What is the nature of the operational work? LD Roadworks (7) Stormwater (_] Water infrastructure (-] Sewerage infrastructure ([] Landscaping ([) Earthworks (_] Drainage Works LJ Signage (1) Clearing vegetation under the planning scheme Other - Specify below Access and/or carparking, stormwater drainage, frontage works, excavation of materials to fill another site and landscaping (ii), What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form) [X] Development Permit ([] Preliminary approval (J Both (Specify below) (iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)? (X] No [1 Yes - Specify the number of lots being created (iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring alot) (-] No Yes - Complete Table B(a) Table B(a) ; List of approval references: Date approved | Date approval lapses (if known) 1 Development Approval for MCU 19 May 2006 19 May 2008 2. What is the dollar value of this operational work? (i. the total value including GST, materials and labour) + $ ‘Mandatory Information | 3. Confirm that the following mandatory information accompanies this application * Confirmation of smart lodgement Method of lodgement i eens ae pe eatons if applicable, showing the nature and location of the proposed works (including the oO Confirmed lover the counter OFFICE USE ONLY Date Received Reference Numbers [ |
Page 11
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008 Advice for completing Part E General advice ¢ Part A must also be completed for all IDAS development applications. * The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. Qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
Form 1 Development Application
~ ae
y RECEIED ©
4{ 46 MAY 2008
Assessment Checklist, 2" 4)
arp %
hoas Development Application Form 1 is the approved form for all development applications under the integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.
Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application.
Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.
Section 1 and ail other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be
completed for all development applications except those proposed on land in an urban development area, or for building work
requiring assessment against the Building Act 1975 only.
For more information about development applications on land in an urban development area, refer to www,ulda.qld,gov.au.
For more advice about building applications refer to Part B of the IDAS Application Form.
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.
For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist
Does the application seek approval to materially change use of the premises?
ifyes - complete Section 2 of this checklist DYes |KjNo
Does the application seek approval to reconfigure a lot? CYes |BaNo
yes - complete Section 3 of this checklist and Part F of DAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist balYes jLINo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Yes |B2No
if yes - complete Section 5 of this checklist
Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?
if yes - complete Section 6 of this checklist. Yes |KJNo
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? CYes |fJNo
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. [1Yes |X}No
[Assessment is by a building certifier
SECTION 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
‘HERITAGE ]
14 Answer both A and B below.
A |s any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act
1992?
DX] No-Goto8 C] Yes
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
{development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered
in a Local Heritage Register under Part 7B of the Queensland Heritage Act 1992?
4] No - Goto Q1.2 O Yes - (Complete Form 1, Part C;) This application requires assessment by the relevant local government against the IDAS
Code in the Queensland Heritage Regulation 2003. if the development involves building work and the focal
government is not the Assessment Manager for the application, the local government has jurisdiction as Concurrence
Agency.
IPA scnedule 4, port 1 table 5. tem 24 schedule 9 fabies | 2 5.4 & 5, {P Reguiaton schedule 2 table {tem 194 vPL cechor 134 (Oetntons OF
Queensland Heriage Regulasion 2003, schedure 2 {'DAS Code!
SuSed " ZeverUNDE
[REMOVING QUARRY MATERIAL; WILD RIVER AREA |
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
KX} No-Gowoor3 (Yes
IPA, schedule 8. part 1. table 5. item 1, IP Regulation, schedule 2, table 2. tam 11: IP Regulation, schedule 1 table 5, tem 2 (wild river area). Water Act 2000.
section 966C; Wild Rivers Act 2005, section 434
/ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA 7]
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
BX] No-Gotoor4 ([] Yes
IPA schedule 8. part 1 table 2 neni 1 IPA, schedule 8 part 1 tanle 5. tems 3 and 4: iP Regulavor schedule 2 fable 2 tems 1 and 23 Environmental Protection Act 1994 section @
73A4 ‘mid river area! Wid Rwers Act 2005 section 49A relevant wild nver declaration: Wild Rivers Core
WITHIN THE LIMITS OF A PORT ]
1.4 \s any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
No - Goto Q1.5
(1 Yes
{P Regulation. schedule 2 table 2 items 15 and 16
[DECLARED FISH HABITAT AREA B|
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
BX] No - Goto 04.6
oO Yes - if answers to quastions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPIGF). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation schedule 2, table 2, item 26
{COMMUNITY INFRASTRUCTURE |
1.6 is any part of the premises designated for community infrastructure? e@
DX} No - Goto 01.7
LJ Yes
IP Regulation schedule 2, table 3. item 7
[waste WATER MANAGEMENT ]
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
EX] No - End of Section! [[] Yes
IP Regulation, schedule 2, table 3. tem 5
IS ECTION 4 - Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME
— J
41 ts any of the proposed operational work assessable under a planning scheme?
EX] No - Go to Q4.2 LD Yes - (Complete Form 1, Part E) Answer Os4.1.1 - 4.1.7 below.
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER “y
AREA :
4.2 ls any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
EX] No -Gotoas3 [_] Yes
Page 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
IPA scheduie 8 part 1. table 4 tem 2: iP Regulation schedute 1. part 2. tab'e 5 iter fie)
Wild Rivers code (Note. the code does not curently contain appkcable provisions for residential, indusirial or commerciat development msigg a designated urban
area}
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA
43 (s any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[XJ No -Gotooss [_] Yes
IPA schedule 8 part 1 table 4, 1ams 1A-1G (P Reguiation, schediile 2 table 2 tem 5 (vegetaton cleanng) IP Regulation schedule 2 table 2 tem 34 (koala
conservation) iP Reguiation schedule i part 3 table 4 iten (vegetation clearing’mid nver areas. Vegeiahon Management Act 1999 section 22A {vegetation
ClearingAwild ver areal Wid Rivers Act 2005 sections 31F and 43A
‘TAKING OR INTERFERING WITH WATER; WILD RIVER AREA ]
44 {s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
BX] No -Gotoo45 [_} Yes - Answer (a) and (b) betow
IPA schedule 8 part 1 table 4 dems 3ta). !P Regulaton schedule 2 table 2. tam & iP Reguianon schedule 1 part 3 table ¢ .tems 3 and 34 Woter Art 2006 section 966A jwad uver
area, Wid Rivers Act 2005 sector 434 'efavant wild nver declaration Wid Rivers Code
45 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
& No Go to 04.6 oO Yes - (Complete Form 1. Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1. table 4. item 3(b): IP Regulation, schedule 2. table 2. item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Wild Rivers code (Nole: the code does not currently contain applicable provisions for taking or interfering with artesian water)
46 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
BX} No -Gotoas7 [} Yes - Answer (a) and (b) below
IPA, schedule & part 1. table 4, stem 3icy{i), IP Regulation. schedule 2, table 2. tem 8. IP Regulation, schedule * pat 2 tabled tem 2 Water Act 2000 sector 966A (wit river area),
Wild Rivers Act 2005 section 43A relevant wid nver declaration, Wild Rivers Code
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
DX] No -Gotoass [_] Yes
IPA, schedule 8, part 1. table 4. item 3(c)(ii); 1P Regulation, schedule 2. lable 2. item 8, IP Regulation, schedule 1, part 3. table 4, itemn 3
Water Act 2000, section 966A (wild river area)(Note: no current Wild River declaration identifies taking or mterfenng with subarlesian water as assessable}
Wild River code (Note. he cade does not currently contain applicable provisions for Sub artesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
XJ No -Gotoo49 [7] Yes - Answer both (a) and (b) below
IPA, schedule 8 part cable ¢ tems 3c,i1, arc Jd! (P Reguiation schedwie 2. tab 2. tem 9 'F Rega!
ner area) relevant wid nver declaration, Wud kivers Cove
‘> schedue ‘ pat 3 fabte 4 tem 3A water Act 2000, section 9668 (wild
4.9 1s the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [x] No DD Yes
(i) To increase the storage capacity of a referable dam by more than 10% —) No 0 Yes
{f yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA schedule & part 1, table 4 item 4 IP Regulation, scheduie 2. table 2. item 10
(TIDAL WORK; WILD RIVER AREA }
4.10 ts any of the proposed operational work tidal work, other than excluded work defined under the IPA?
DX] No -Gotoa4.t1 [_] Yes - Answer (a) and (b) below
IPA. schedule 8 part 1 fable 4 lem 5. IP Regisation, schedule 2, table 2. tems 12 14 and 17, P Requiation schedule 1 part 3 table 4, ttemis 44 and 5
Coastat Projection and Management Act 1995 section 104A (mid nver areal
Page 15
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.2, 31 March 2008
[COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.41 Is any of the operational work proposed to be carried out within a coastal management district?
Dx] No -Gotoas72 [_] Yes
IPA schedule 8 part 1 table 4 item 5. 1 Regulation schedule 2. table 2 tems 12 and 14 IP Regulation schedule 1 part 3 labia 4, tems 4A and §
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild aver area); Wild Rivers Act 2005. section 434
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
[XI No -Gotoa413 ([] Yes
IPA, schedule 8, part 7 table 4, tem 6, (PA scheduie 8 part 2 table 4 ter 2. Fishenes Regulation 1995 91134 :.el-assessable codes) IP Reguator schedule 2 table 2 iter 76 1P
Raguiaton schedule} part 3 table 4 .tem 6 Fisheries Act 1994 section 76D {wild rver area) Wild Rivers Act 2005, section 434
ey
—
‘DECLARED FISH HABITAT AREA; WILD RIVER AREA
4.13 ts any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
BX] No - Goto a4.14
(Yes
IPA. schedulg 8 part 1 fable 4 nem > IPA scnedine 8 pert 2 table 4 stem 3, Fisheries Regulation 1995 51134 (self-assessable codes). IP Regulation schedule 2, table 2, ter 25 1?
Regulation, schedule *. part 3, table 4. tem ?, Wild Rivers Act 2005 sechons 43A Fisheries Act, section 76DC (wid aver ares)
‘REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA |
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
BX] No -Gotoa4.15 [] Yes
IPA scheduia 8, part t table 4 dem 8, IPA, schedute & part 2. table 4. iter 4, Fisheries Regulation 1995 113A (self-assessable codes) !P Regulation schedule 2 table 2 tem 29: 1P
Regulabon, schedule 1. part 3, table 4 tem 8, Fishenes Act 1994, section 76DB {wild river area), Wild Rivers Act 2005, section 43A relevant wild nver declaration, Wid Rwers Code
WILD RIVER AREA ]
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No -Gotoa416 [7] Yes
IPA. schedule 8, part 1, table 4, item 10: IP Regulation, schedule 2, table 2 item 37, Wild Rivers Act 2005. sections 42, 434
[STATE-CONTROLLED ROAD |
4.16 's any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX} No - End ofsection4 (_] Yes
IP Regulation. schedule 2. table 2. dem 3
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.
Page 16
~
7 a
Earl Covington & Associates
CONSULTING om S MANAGERS A aon ue 307 1
“eg eo
INEERS ANO
TRANSMITTAL REGISTER
Project: Duplex Development at Hill Street, Sunshine Beach
Job No. Day 16
0511 Month 05
Year 08
Dwg No. Description Revision
0511-01 Locality Plan and Index A
0511-02 Allotment Layout Plan @
0511-03 Layout Plan and Driveway Detail Cc
0511-04 Earthworks Plan @
0511-05 Stormwater Layout Plan c
0511-06 Driveway Longitudinal and Cross B
Sections
0511-07 Stormwater Caiculation Tables @
0511-08 Stormwater Drainage Longitudinal
Sections
0511-09 Erosion and Sedimentation Control @
Plan
Distribution Copies Issued
Bark Design 1
P Preliminary © Construction CA Council Approval X Information T Tender RE Revision O Other
Reason For Issue [ca | | | | I | | |
M Mailed P Pick up C Courier D Delivered E Email
Delivery Tey | ~— JT TT { J] J
\WDatalprojects\Job Files'051 |‘Correspondence\Transnuttals\05 11 08 05 16 TAW doc
Page 17
DUPLEX DEVELOPMENT. HILL STREET, SUNSHINE BEACH. FOR | VASTERBY Pty. Ltd. IN DEX. DWG No. DESCRIPTION @ 0511 -— 1 —- 01 LOCALITY PLAN & INDEX 0511 -— 1 — 02 ALLOTMENT LAYOUT PLAN 0511 - 1 = 03 LAYOUT AND ALIGNMENT PLAN 0511 — 1 — 04 EARTHWORKS PLAN 0511 -— 1 -— 05 STORMWATER DRAINAGE LAYOUT PLAN 0511 — 1 -— 06 DRIVEWAY-LONGITUDINAL AND CROSS SECTIONS 0511 - 1 - 07 STORMWATER DRAINAGE CALCULATION TABLES 0511 — 1 = 08 STORMWATER DRAINAGE LONGITUDINAL SECTIONS 0511 — 1 - 09] EROSION AND SEDIMENTATION CONTROL PLAN LOCALITY PLAN (EVEL DATUM. TEMP BENCH MARK [>S@=D 82 Schoa LEX SEWER MANHOLE UD a9 ———] Oe ato, 4558 DUP Vv. DEVELOPMENT RL-40.158 peers] far” (or Sea3 Fos ¢ HILL STREET — SUNSHINE” BEACH "ax a2 _ UE Email: [email protected] Earl Covington & Associates LOCALITY PLAN AND INDEX. a GhaL bRAWNGS | = — es GT CONSULTING WAORERS: No. ae RO er © J-L C0f-GSS OTIS [AES o511 ER cameo a Secon Or Up ewe wr nr all ‘ACA. 112 607 187 GRAWING WUMBER 0511-01-01 | A W:\ob Files\0511\Drawings\0511_rev0_080514.dwg
Page 18
a’ AIR. VALVE
BENCH MARK
CONTROL POINT
ELECTRICTY POLE
TELSTRA PIT
WATER METER
Cr FIRE HYDRANT
GULLY TRAP
seins" EXIST RISING MAIN AND. MANHOLE
z. oi eyisT SEWER LINE AND SEWERAGE MANHOLE
sve piommeem EXIST WATER MAIN AND HYDRANT
\ seSecse tt. EXIST KERB & CHANNEL
\N. care es EXIST O/H ELECTRICITY
a“
5 2 3 4 LEVEL DATUM: TEMP BENCH MARK JM 82 Primary School Court DUPLEX DEVELOPMENT
toring eRe ow | eee e GPE DEVeLOPMEN
ax 7 ose . -
_ ERE Z7 | Cima’ [email protected]. | Earl Covington & Associates HILL STREET SUNSHINE, BEACH
IGINAL ISSU. aa
So or lor{ oon” © LLC ax LFF [Se SOS. Pe ee os 4 canes AGM. 112 667 187 DRAWNG NUMBER 0511 — 02. az
W:\Job Files\05 1 1\Drawings\051 1_rev0_080514.dwg
Page 19
CURVE SETOUT DATA
“4
a a a in
“PAT, MULLINS PARK.” »
a ¥ “os
ay 2
“Ud AND S
EWA Yas
REMOVE E ING DRIVEWAY CROSS
OVER ADH) RECONSTRUCT AS PER 1
° COUNILS STANDARD DRAWINGS FOR rd
RESIDENTIAL ORIVEWAYS. \
angie
1/2 ANGLE | 1/4 ANGLE | 1/8 ANGLE | 1/16 ANGLE|
CETL) RADIUS ANGLE
a b J i h
7.75| 62° 18°
135,00] 3° _57
46"! 4.66 0.08] 9.32] 4.66] 0.08] 2.33/ 0.02] 1.16] 0.00] 0.58} 0.00
4.50| 77" 21°
28"'| 3.60 1.26] 6.07] 2.81} 0.98] 1.49] 0.25| 0.75] 0.06| 0.38} 0.01
10.75] 85° 30°
43"|_ 9.94] 3.89] 16.04] 7.30] 2.85] 3.92] 0.74] 1.99] 0.18! 1.00] 0.04 —O—-O— _NEw STORMWATER PIPE
2.25) 62° 16°
55”| 1.36 0.38) 2.44] 1.16] 0.32] 0.60} 0.08} 0.30! 0.02/ 0.15| 0.00
fan [en |e fos [hs fae
18.00] 42° 40°
13"| 2.00 0.11 3.98; _ 1.98] 0.11] 0.99} 0.02} 0.49} 0.00) 0.25! 0.00
~~ +
SEWER WAQHOME 78 Bm Al
TANGENT] SECANT| ARC CHORD! OFFSET CHORD OFFSET CHORD OFFSET cHoRD OFFSET wrengt ese
3"] 4,68 1.30 8.42] 4.01] 1.11] 2.08] 0.28] 1.05] 0.07} 0.52} 0.02 A*
BASEMENT
CARPARK
\
EXIST POWER LINE AND POLE
EXIST redstrA LINE ANO PIT
EXIST SEWER, LINE AND SEWERAGE MANHOLE
EXIST WATER MAN ANO HYDRANT 4
EXIST KERB & orev 4
SURVEY CONTROL STATON a
SL
| worn vanee-| so
3.6m-5,5m we
N.T.S.
CONCRETE NOTES
1.THE SUSGRADE BENEATH THE CONCRETE PAVEMENT
SHALL BE WELL COMPACTED SO AS TO PROVIDE NO
VISIBLE MOVEMENT WHEN PROOF ROLLED WITH A FULLY
LOADED WATER TRUCK.
2,.CONCRETE PAVEMENTS TO BE N32 GRADE WITH F72
MESH.
S.MINIMUM COVER TO BE SOmm.
4,TRANSVERSE CONTRACTION JOINTS SHALL BE PROVIDED AT
A MAXIMUM SPACING OF 12.0m AND ON ONE = SIDE OF
ORAINAGE PITS.
5.TRANSVERSE CONTROL JOINTS SHALL BE PROVIDED AT A
MAXIMUM SPACING OF 6.0m,
6.THE METHOD OF CONCRETE CURING SHALL GENERALLY BE
IN ACCORDANCE WITH THE REQUIREMENTS OF MRS 11.70
ANO SHALL BE APPROVED GY THE SUPERINTENDANT PRIOR
TO CONSTRUCTION COMMENCING.
7.CONCRETE TESTING REQUIREMENTS SHALL GENERALLY BE
IN ACCORDANCE WITH THE REQUIREMENTS OF MRS11.70.
B.LAPS SHALL BE SUCH THAT THE TWO OUTERMOST WIRES
OF ONE SHEET OF FABRIC OVERLAP WITH THE
OUTERMOST WIRE OF THE SHEET BEING OVERLAPPED.
9,LAPPED PORTIONS SHALL BE TIED WITH WIRE AT A
MAXIMUM SPACING OF 500mm.
{O.REINFORCEMENT MESH SHALL BE SUPPORTEO ON CHAIRS
IN A REGULAR GRID NOT EXCEEDING 1.0m.
CONCRETE THICKNESS TABLE
USE THICKNESS
Residential Access 125
unit Residential
(i.e. >3 lots) 150
Add 15mm to the sbove
if CBR < 5
75 75
415 “TT Re - Saw ene
pound
Dowe's to be 24mm dio.
grade 280R steal bors
450 long ond placed
at 300mm centres.
INT—(CJ
Secle 1:5
Saw cut depth O.3t
4t_ f|_____
induced crack
TRA TR’ INT—(TCJ
Scale 1:5
t 34 LEVEL DATUM: TEMP BENCH MARKLOR OR hag 82 Primary Schoo! Court DUPLEX DEVELOPMENT
SRE SEWER MANHOLE LID PR cu _ | Prone (07) Bias 200 C or VASTEREY Ey. Lid.
; oe / ane _
MYATER. os ERED 77 | Email: [email protected] Earl Covington & Associates Hee Fo SHINE BENCH
Bbbh
ah “ Hae ae? LPS. CEE _GTBE
TS DOCAEDT TS COPTUGHT & THE PROPDUY OF Sy,
osit BR OSES, £ SSOGUES TY ED. a MOST nor "case ue ACH. 112 SO? TET
CRIMI RUMEER 0511-01-03. | ¢
W:lJob Files\0511\Drawings\0511_rev0_080514.dwg
Page 20
AREA OF EXCAVATION
(APPROXIMATELY 560m3)
zor
¢ «¢ ¢ ¢ ¢
«€ «€ « ¢ ¢
* PA “MUSLIN
ely .
¢ ¢ + «€ ¢
¢ ¢ ¢ ¢ ¢
¢
¢
¢
st
¢
NOT TO
SCALE
LEVEL DATUM: TEMP BENCH MARK
SEWER MANHOLE LID
RL.40.158
Email: [email protected]
ORIGINAL iSSUE
REVISON
LOND LL tbat BIS EN EIB
TiS CocMENT 1S Capron & te PRopoayY OF
DRL OOVMGION & ASSCOKTES #Ty. “sr
Be ictanth Coren OF USED OTR ABORT
Earl Covington S &
1d
Associates
DUPLEX DEVELOPMENT
for VASTERBY Pty. Ltd.
HILL STREET — SUNSHINE BEACH
EARTHWORKS PLAN
ORAMNG NUMBER
ACM 112 607 167
0511-01-04
|_0
—
W:\ob Files\051 1\Drawings\0511_rev0_080514.dwg
Page 21
BM SEWER MANHOLE
iD. RL.40.158
2x3000 LITRE WATER TANKS
INSTALLED IN ACCORDANCE WITH
COUNCIL'S PLANNING SCHEME
POLICY 22—WATER TANKS. 150 9
OVERFLOW. 1L.40.1. ALL ROOF
SURFACES FOR EACH UNIT TO BE
ORAINED INTO THEIR RESPECTIVE
TANKS.
°
ENGINEERING DRAWINGS
TANK OVERFLOW CONNECTION
REFER TO HYDRAULIC << |
STORMWATER SETOUT TABLE
Pit No. Easting Northing
Setout Point
fA 1023.707 3010.070
2/A 1009.134 2998.048 Kerb &
3/A 1009.142 2993.464 = Channel ti
4/A |1032.872 2992.437 =
$/A |1033.465 2984.206
6/A |1034,592 2968.475 Chamber Chamber
T/A 1035,308 2958.361
8/A 1044,684 2958.106 GRATED PIT. CATCHPIT & MH SETOUT
A= Al+A2= 155m?
B= 81+B82= 155m!
ALL PIPE WORK TO
BE ATTACHED TO
INTERNAL WALL IN
BASEMENT CARPARK
2x45" BENDS
THROUGH WALL
#150 uPVC PIPE
TOP OF PIT TO BE SET
TO FLOOR LEVELS IN
ARCHITECT DRAWINGS
&
nN
2.7m x 2.7m x 0.5m DEEP LAYER
OF 75mm ROCK SPALLS TO CAPTURE
AND INFILTRATE STORMWATER RUNOFF
FROM DRIVEWAY. ROCK SPALLS TO 8E
WRAPPED IN A14 GEOFABRIC. PROVIDE
PRECAST CONCRETE MANHOLE SECTION
(1050 #6) AND CAST IRON LID IN
BASEMENT FLOOR FOR ACCESS. “
TELLAM 300x300 CONCRETE CHANNEI
DRAIN WITH MEDIUM DUTY BOX
GRATE. IL, 37.45
#150 uPVC |PIPE
Lepr
uP!
a
SSS
xs
-
a
a
34 LEVEL DATUM: TEMP BENCH MARK|O>OR™ sm 82 Primary School Court
tary SEWER MANHOLE LID ae ——— WAROOGHVOORE . 4558
SCALE (m RL.40.158 iM fa f B44 Jose
E ea? PRERED 747| Email: [email protected]
2 ro
A. STORMWATER FL ae z = FE No. .., | wa OcueM & Grrean @ Te PerodT oF
ie ae oe [Om AO +e heys 68IF | EL8 osit | Bremen sone mo ane
MNUOERS
a AGM 112 507 567
DUPLEX DEVELOPMENT
for VASTERBY Pty. Ltd.
HILL STREET - SUNSHINE BEACH
STORMWATER LAYOUT PLAN
ORAWING NUMBER
0511-01-05 lc
W:\ob Files\051 1\Drawings\0511_rev0_080514.dwg
Page 22
+ ‘ $ y RL39.56 RL39.25 ex . 34.9 3.36 4 8 o N v 33 C F ; RL39.56 hE er RL37.63 ha qa RL39.04 siis CROSS SECTIONS. “a Not rf l potas! Sufose E q x B s° RL37.75 a, j RL3S.15, . es 50.00 $5 ap ba RL39.22 RL39.06 aux z 2d.00 41.24 2 A 2 “ Oealgn Surface a Fg RL39.36 RL39.23 i Natural Surface 10.00 4d.oo CHAINAGE Alignment Details : . Ba152°41°51* B=90°23'58" B=175°54741" Seats Horizontal 1:200 Vertlcot 1:20 ONG ON. Oo 0.2 04 06 C8 1.0 " DESONeD 52 School DUPLEX DEVELOPMENT EEL DATE TEM BENCH MARK | | tansocnbone ata ets for VASTERBY Pty. Ltd. oo “ERT, SCALE (mm), RL40.158 ku] Fhone (07) S443 2409 HILL STREET - SUNSHINE BEACH WORD “SCALE im) ERED 7777 | Email: [email protected] ORIVEWAY-LONGITUDINAL AND CROSS SECTIONS 5 RENUMEEREO PLAN SET HORIZ, SCALE (m = — te Te Daa © GT we PTT DRAWING NUNGER —01-08 B Z See —— eee oe | LHS BSE Pees li™ = | ee = J W:\Vob Files\051 1\Drawings\051 1_rev0_080514.dwg
Page 23
LOCATION TIME SUB-CATCHMENT RUNOFF INLET OESIGN DRAIN DESIGN HEAOLOSSES PART FULL DESIGN LEVELS
tc CA | HCA Qg | Qb tc | +CA | & Qs | Op] bt $s v T V2g | Ky | hy | KI | ol bw] St fot Vp.
alae
j g gj g 5 é : : qe S 8 8 4 & d g
@ ; = on ; a! a : z
g| # é g 5 [88 £8 z|guggiy lag z\§ s| 3 z/zié | 8 § Bale gy 8 8 lgele \aele = \6 [as gle |: si]
ale] 2 | SE NER o/s eeeclcles| | el alae isle [(S/2 g5lgi [2 | sleeesieace 25 |e eeeSgeleg ele eye’) = |B le (eel? | al
z [3/8 ies & ag l8ei2? 5 23/2 |8$2/8)8| 81s legecisee’ gee gle E Blga/ 6/2) 9 |EE
B/E] 8 3 | 2 [Bal 3 |S a| 3 (sce seles| 2 [S/E|Ee es (E (2s F/ElRlEESSEREEs € 8 3 |e |etlsdsdsai2s) ERE B || 8 [é2| § || 2 [2
yes. % {min ha [ha [vs | vs % | Ve Vs_|Us min_|mmh} ha [vs [Us [¥s [vs | m | % | mm | avs | min m m™ m mi] % | mi[im [ows | m | mim | mimi m
a | ™ fA $00 ‘oon | oot 8 | 25 PP . | o sm | wm | con Tw s [om | 2m | tout oz | o16 {09 €.005 Oo 0.905 Do 180 coor | 100 | 0n7e aare | tor | oe | ones | t2t | eo.ans | eomne | soos em | oats] BA
TIA 500 01s | 015 4m | a | ois e to (122) HRT 32: Vo2tago 0.02 HD Uperearh HOL 40978 below pet ate | 28853
Xi ade ow 10.4 and tow 7.19 pipe ob A113
Peet hildonnatean pe SHOT
A a 42 ae gout gant £ PP 5 ° si 12 gaz n hoa tov Suvi esto 1SQU] a or ae Gow | 100 | oom pita oa oo | 028 | ones | 092 | oa7 seare sae Wis 0833 | 40190] TA
SDs 100g 080% 181 memes
§f00 1.21 cor 0.75 Kus 2.25 Kw 2.26 Sark t
an A iF we ax | wt | of 10 | so 084 | soul os | a2 oom | 486 | 008 oes | o28 | ooo ‘sass | 30.006 | 30.280 25 | sone | mA
ia say | ais | ome Pie tow Sum ued sta foo) am sasha | 0188
5A SA a a sso | ise | om 0 | asco | ceo | scout os | om Qo o.010 00 150 oore | oss | oes on | 028 | 07 sass | 3916s | 90.168 wi | 350] 6x
oan 66a | 310 | oan Pre: ato ows) (nas} CHART 60 O.#Do!.00 alpha. 0 mtg | 39.10
Kw 0.05 Wu 0.58 WSE 001
Ky 0.31 Kw O37
an a 12 et sa | 188 | a0 1 | est aso | ssou] oss | 000 20 0.010 D0 150 ons | 1.70 | 0.028 aon | 026 | 0681 sages | 39.106 | 39.130 satss | ons] 4A
sm ms 0.082 Poe: aBian flows) am) CHART 60 Dui0c!,00 aipne 88 Sar | 38.009
iw OS0VU0.60 WSE 003
Kut 70Kw 2.12
uA on ta WH ors | 13 | onzz to | 460 | oss | tsouy os | oo Qo 0.010 Do 160 oom | 170 | 0m 00% | aa | oz sare | 30010 | 39.009 30.048 | anga9 | MA
ans m 00% hal L 0.76) ‘CHART 60 OuDo!.00 siphe 88 ‘38.104 | 39.006
Kw 0.30 Vu 0.66 WE 0.05
Ka 1.79 Kw 2.12
zh on 12 WH ax [ wz | oon 10 | aso] oss | toy os | 03! (G5 0.510 Do 189 oom | 124 | omT oo | 028 | on 38.704 | 3903 | 39006 yeorr | tte] mA
on ~~ ac Pre 75) CHART 69 Ou'D01,00 sipha 50 6 | MO
suet
Te y vet Tans
Pret 0 0D “ CALCULATIONS TABLE
LEVEL. DATUM: TEMP BENCH MARK DESIGNED 82 Schost Court DUPLEX DEVELOPMENT
MAN [OREN ss for VASTERBY Pty. Ltd.
RL.40.158 ione (07) 5443 2400
Fox 5443 7045 ( “= . HILL STREET — SUNSHINE BEACH
CREED oc] 5
C7 2q| Email: [email protected] Earl Covington & Associates STORMWATER CALCULATION TABLES
o ORIGINAL ISSUE % TORENT & GPTEGN « ne PROPOR Cones TING wns eR
fo, REVISION DATE APPRENED LLL LE LISF [AE POE We BRS See ooh eer or one wo ACH 111 007 187 ORANG WU 0511-01-07 | oO
W:\Job Files\051 1\Drawings\05 1 1_rev0_080514.dwg
Page 24
Sas URE A << < < < <x =< < <x 3 S = SS 3 $ gd & & < La Lt e e » aw are = ou a aj aj STRUCTURE ais es 82 als ol g as ES 3 DESCRIPTION go WS GS gs 216 as qe gg & so ge . 25 do glo dla glo g o\_ a3 42 ke] 32 42 az a2 Sg Bie ci fFLoor | See J SS Pe PIPE ATITACHED} TO BASEMENT INTERNAL WALU + _s BASEMENT CARPARK PIPE S!ZEmm (Class) 150(U) 150(U) 150(u) 150(U) 150(U) s50(v) 150(U) PIPE GRADE % 2.44% 9.62% 0.54% 0.60% 0.50% 0.54 0.53% PIPE SLOPE 1 In X 1.53 161.29 183.52 166.00 198.34 TH3.95 189.00 FULL PIPE FLOW VELOCITY (m/s) 0.27 0.53 0.53 0.53 0.55 0.53 0.53 PART FULL FLOW VELOCITY (m/s) 1.21 6.87 DATUM RL 35.0 WATER LEVEL § 2 g B 8 #6 z IN: STRUCTURE ¢ g 3 g g 3} 8 8 HYDRAULIC 5|8 ais a8 3/5 3/5 a5 88 3 GRADE LEVEL gig as als als aa aja sis 8 PIPE FLOW 0.008 0.010 0.010 0.010 0.910 0.010 0.010 (Cumecs) PIPE CAPACITY AT GRADE (Cumecs) 0.030 0.015 0.014 0.015 0.014 0.014 0.014 w wim ~ti\+ ae 2 DEPTH TO INVERT | Og ce 33 0 «ag ae 8s § INVERT LEVEL g a8 18 az 2/8 Bis BIB g OF ORAIN 3 a|s 3/8 a8 3% SB a8 8 DESIGN SURFACE 3 B 2 g 3 8 8 8 LEVEL g g 3 a 3 a g g ROAD CHAINAGE (Offset) g 8 2 Bas & 8) ak 3 RUNNING CHAINAGE s 9.700 © 10.000 15.600 a 300 4 23.800 e| #608 18,900 3 WATE PIGS COSTT\ Orainagey he Uroin\0S11 LONG V20RF Seale: Hors TW 180 Vert 1 in ES LINE — Project Fie: 0811.hoo A veil «= OS 19 5, : DESIGNED iy 82 Pri Schost Court DUPLEX DEVELOPMENT ' ¢ i SEWER MANHOLE LIO oR A h : ram ce eacun | RL40.158 su} pee" GR Saas 3600 . ¢ ° HILL STREET SUNSHINE” BEACH fore Reduction HERRED 27-7 | Emall: [email protected] Earl Covington & Associates STORMWATER DRAINAGE LONGITUDINAL SECTIONS 4 ~ pe, FILE Ro. DOCUMENT © COPYROORT PROPERTY COMBATING a, MANAGERS. wz ORIGINAL TSSUE ate ese] ro LL RLS DEY | ME 5 LAGS 0811 Set cere 6 SE wee or "Oana oe ACH 112 007 167 BRAKING HUNGER 0511-01-08 | 9 W:\Wob Files\0511\Drawings\051 1_rev0_080514.dwg
Page 25
Oo IMENT CONTR S
1,EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED GENERALLY IN
ACCORDANCE WITH THESE ORAWINGS PRIOR TO THE COMMENCEMENT OF EARTHWORKS,
UNLESS THE SUPERINTENDENT APPROVES AN ALTERNATIVE PROPOSAL IN WRITING.
Z.ADDITIONAL EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED AS NECESSARY
DURING CONSTRUCTION.
S.ALL_ EROSION AND SEDIMENT CONTROL DEVICES SHALL BE MAINTAINED UNTIL THE SITE
IS STABILISED,
4.PERMANENT COVERAGE OF DISTURBED AREAS WITH TOPSOIL AND TURF, HYOROMULCH
OR MULCH (AND JUTE MATTING IF REQUIRED)
IS TO BE UNDERTAKEN AT THE EARLIEST PRACTICAL TIME. (NOTE: TOPSOIL THICKNESS
TO BE A MINIMUM OF 100mm),
S.IN OROER TO PREVENT EROSION FROM CONCENTRATED FLOW PATHS THE
CONTRACTOR SHALL FOLLOW THE FOLLOWING SITE PROTECTION PRINCIPLES
§ SANDBAGS ARE TO GE PLACED AT 20m CENTRES IN CONCENTRATED DRAINAGE
PATHS ANO ALONG SEDIMENT FENCES.
6.THE UNDERGROUND DRAINAGE SYSTEM INCLUDING ALL PITS AND PIPES SHALL BE
CLEANED OF SEDIMENT PRIOR TO ON~MAINTENANCE
7.UNLESS OTHERWISE APPROVED BY THE SUPERINTENDENT ALL TEMPORARY EROISION
AND SEDIMENT CONTROL MEASURES SHALL 8E REMOVED AT THE COMPLETION OF
CONSTRUCTION.
LEGEND,
SEDIMENT CONTROL FENCING.
oe
OISTURBED AREA
ra
c:
|
|
2
«| USE A24 BIDUM GEOFABRIC
“ANG WITHIN PIT TO ACT AS
SILT SCREEN UNTIL SITE IS
-
So
nn
DIRECT_RUNOFE. INTO PIT
DURING CONSTRUCTION
|
|
WITHIN, PD
SILT SCRE!
- -—STASIOS!
USE A246 ri GEOFABRIC
0 ACT AS
UNTIL SITE IS
USE A24 BIDUM GEOFABRIC
WITHIN PIT JO ACT AS
SILT SCREEN UNTIL SITE [Ss
STABILISED
STABILISED
Sonn, INTO
FO
GEOTEXTILE FILTER 7
4
\
1
1
4
@ SEDIMENT FENCES ‘
\
1
q
eit ends overlapped,
ON GRADE KERB INLET SEDIMENT TRAP
¢
SEDIMENT CONTROL DEVICE DETAILS. eal
‘ ¢ ‘
LEVEL DATUM: TEMP BENCH MARKTO=O™™ oy DUPLEX DEVELOPMENT
NOT TO SEWER MANHOLE LID i for VASTERBY Pty. Lid.
SCALE RL.40.158 wu HILL STREET ~ SUNSHINE BEACH
ERED Ay EROSION AND SEDIMENTATION CONTROL PLAN
2 SRIGINAL TSSUE atoms} oo APPROVED: Littles OPOF [Mes AS PILE We 0515 DRAWING NUMBER 0511 -01- 09 | oO
W:\Job Files\051 1\Drawings\051 1_rev0_080514.dwg
Page 26
Landform Design Consultants LANDSCAPE PLAN for HILL STREET DUPLEX Sunshine Beach PO Box 1452 Noosa Heads Q 4567 (07) 5448 1480 Landyorm Email: [email protected] ——
Page 27
° LEGEND
a :
1oomm deep Chunky ageFsGl Pavers to match Terrace pavers 2 SYZ bus
5 Pine Bark. mulch CFU surrounded by 1oOmm deep
— 20-40mm River Pebbles DH ore
Pe Peco 26% 100mm deep 20-490 mm
28 5%50,008 River Pebbles vies 4 Mo oenly
t BRA gée
der Pebble
(8 ViOhed J sean :
Ppaced events 1 ELAret i ‘ & fea "3
rear ‘
planting areas 4 DIA bre POE Pa! | VO
1 EUC sum 4 SNZ reef Pump ‘ \ \ ) Deiveway
5 DIAb = : . | \ PAT MULLINS
re \ PARK,
pene 3a'SYZ dus ,
"
‘ \
jae ees
APARTMENT 2 % ve bo i6) hed
30 poced evenly
oj Le . Z
{ SZ : Terrace | om on \ . errace.
ELA Hl 7 ‘=~ VlOhed
4 EL 7 KI-7 DIA bre | wee 7 : ~ spaced evenly
\ Corymnb.io
4 DIA . N\ re rmadia
ore \e- ~
> ? Bi
4 DIA orate BN le: - | q
1 ELA ret 7 wae yest —
. 6. t “o
}
2 BRA ace.
APARTMENT 1
: 2.6 DiAbre
‘ Wray Bx sting
e ors +
24 M0 hed nen Be] Cory mbia.
Spaced evenly 4 SYZcas MO Hs tn tarmadia
through rear ot =
Planting areas o fe
4 DiAbre 4 DlAbre OPS Existing
{ Eltsum ey
1 ret XO con ymbio.
BN interacts
caa Ray 8 River Pebble.
Gardan Edging
Rev.| Oate Description SAE 1: 100 . CUENT Vasterby Pty Ltd File No. 104/08
(Sor) a Landform Landform Design Consultants — Fopasutam Bork Design Architects SH
Lo = gee PO Box 1452. NOOSA HEADS Qld 4567 [™E LANDSCAPE PLAN for 08-501/1
- _ Phone (07) 5448.1480 ill Street Duplex - Sunshine Seac
Nowtotope manta = te. ros E-mail: [email protected] Sheet 1 of 2 sheets REV.
OE
Page 28
NOTES The following notes are to be read in conjunction with Noosa Council's Landscaping Guidelines, Planning Scheme Policy PSP. EXISTING SERVICES The contractor shall determine the location of all services on site. Positions of those services shown on the drawings are indicative only. PLANT SCHEDULE - Hill Street Duplex, Sunshine Beach EXISTING VEGETATION A firmly erected protection barrier shall be placed below the canopy drip line of existing trees and vegetation in the road reserve and Pat Mullins Park where they are adjacent to the construction site. Clearly visible signage shall denote that these are ‘Tree & Vegetation Preservation Areas’. All reasonable precaution shall be taken to protect retained vegetation from damage throughout the construction and landscape works. There shall be no : Mature . . ing, excavation or trenching within the Tree & Vegetation Preservation Areas. Concrete slurry and waste Code Botanical Name Common Name Ht-Wdth = Spacing Pot Size Qty disposal, stockpiling, vehicle parking and machine manoeuvring shail be in approved locations away from (m) (ces) existing vegetation. PREPARATION OF PLANTING AREAS Trees 4. Eradicate ail weeds and grass from planting area. 2. Strip and stockpile any useable topsoil. / BRAace Brachychiton acerifolius Flame Tree 10x3 - 100L 3 3. Box out to minimum 300mm to accommodate topsoil and much. i CORcit Corymbia citriodora Lemon Scented Gum 10x3 - 100L 1 4. Cultivate planting area subgrade to minimum mm depth to maximize soil drainage. . 5 - . . _ @ 5. To prevent waterlogging, install sub-surface drainage system where subsoils are impervious. ELAret Elgeocarpus reticulatus ay Flowering h 5-6 x2 100L 4 6. Supply and spread 200mm depth of humus-enriched sandy loam topsoil, incorporating any stockpiled c rima orina , ue Berry As topsoil. Finish 100mm below paved areas to allow for depth of mulch. EUCsum Eucalyptus ‘Summer Red 4x3 - 100L 3 7. Mulch planting areas with 100mm minimum depth of Chunky Pine Bark mulch or 20-40mm River Pebbles where indicated on drawing. Shrubs MATERIALS ; BANspi Banksia spinulosa Hairpin Banksia 2x15 4.2m 25L 3 Imported topsoil shall comply with AS4419 and shall not contain chemicals that will result in contamination of SYZbus Syzygium australe Scrub Cherry 3x 1.5 45L 42 land (e.g. heavy metal, hydrocarbons, pesticides etc.) Soils must not contain fire ants or nesting materials. ‘Bush Christmas’ Mulch shall be free from soil, clay, dust, weeds, roots, sticks, rubbish, vermin, insects, pests, fungus, disease ‘ af ' , at.d other deleterious material. It shall be free from matter toxic to plant growth. eyaeas Syyaiumn ou ware ade ca cade took ie 1.2m tek oe PLANTING ‘Narrow Leaf , Plants shall be container grown, well formed, pest and disease free, hardened nursery stock true to species or cultivar required. Root balls shall fill containers without binding and plants shall show active healthy growth. Groundcover Pruning, budding or grafting scars shall be clean and well calloused. Plants to be thoroughly watersd in tieir containers prior to planting. DlAbre Dianella caerulea ‘Breeze’ —_— Flax Lily 0.6 x 0.6 600mm 140mm 66 Plants to be installed in locations and at spacings indicated on the drawings. Plants located on slopes or VjOhed Viola hederacea Native Violet 0.2 x - 140mm 61 embankments shall be installed at an angle of 90° to the slope. Planting holes shall be excavated to a width of suckering twice the diameter of the root ball of the plant anc to a minimum depth of 100mm deeper than the height of the . @ plant container. Holes to be filled with water and allowed to drain prior to installing plants. Total: 492 Water crystals shall be incorporated in wet planting soil. Refer to manufacturer's recommendations for cot size of plants in sandy soil. Slow release fertilizer with low Phosphorous formulation (‘Osmocote’ or similar) shall be placed in the planting hole at half the hole depth around the root ball in accordance with the manufacturer's recommended rate of Note: All trees to be minimum 2m high with well developed straight trunks application. Staking or guying shall only be provided where necessary to protect plant from strong wind or accidental damage. IRRIGATION Micro-irrigation system to be installed in all planting areas in accordance with manufacturers recommendations. Rev.| _Dote Description SCALE . CUENT Vosterby Pty Ltd File No. 104/08 a) maa FIK 1 and form Landform Design Consultants | covsutan Bore beslon Architects mi i> —“ PO Box 1452 NOOSA HEADS Qld 4567 | MME LANDSCAPE PLAN for 08-501/2 os - puande/- GDLA Phone (07) 5448.1480 Hill Street Duplex — Sunshine Beach tindseope Nalecls OE (S. 5.08 E-mail: [email protected] Sheet 2 of 2 sheets REV. ————
Used in these records
08/0858 - Operational Works - Landscaping, Access and/or Carparking, Stormwater Drainage, Frontage Works & Excavation of Materials to Fill Another Site [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.