Skip to the record
For the highest quality transcripts.

Council archive · source document

08/0858 - Operational Works - Landscaping, Access and/or Carparking, Stormwater Drainage, Frontage Works & Excavation of Materials to Fill Another Site [As Published] · 142008.858

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

   

j DEVELOPMENT FEES & CONTRIBUTIONS
SUNS hine C O a st (Cashier: Wfase Retum to Admin Officer, Development) ®
q

|. |” APPLICATION AND GENERAL FEE

   
   
  
    
   
 

   
    
  
 

    

 

 

ond Refund Details .

   

  
    
 
 
 

“RECEIPT TYPE | BONDS -

 

 

540 Payee Name:
Address:

“Application Fees

Road / Drainage Plan Exam
Road / Drainage Field Inspection
Lega! Document Examination
Sealing Fee - Survey Plans, Legal Documents

Sale of Documents, Policy Lists, Misc

Bonding Admin Fee (Contributions, uncompleted works)
Closed Circuit TV Inspection
Pre-lodgement Meeting Fee
‘CONTRIBUTIONS
Developer Contribution Landscaping _
Developer Contribution - Road Other than PSP
Developer Contribution - Drainage Other than PSP
Developer Contribution - Pathway Other than PSP

Developer Contrib, — tn Lieu Off St Parking (PSP13 Car parking)
Developer Contribution - Other Parks and Community

ICS - Community Land (Not currently active)
ICS — Public Transport

ICS — Sewerage (PSP Rural)

ICS - Sewerage — South Peregian (PSP Maroochy)
ICS - Water Supply (PSP)

 

 

 
 

 

 
 
   
  
 

 

  
 
 
 
  
 
   
 

  
 
  

 

 

' CALCULATIONS.
Lot Calculation

 

 

 

  

 

    

  
 
 

Plan Examination Calculation

 

 
 

 

 

 
     
     
    
     
 

 

    
 
  

 

  
    
 

 

(CS — Sport and Recreation Land (PSP Parks)

ICS ~ Drainage (PSP Noosaville Master & Ward Street)
ICS — Road (CMRNICP) if BA not entered then use 594

ICS — Pathway (PSP)

 

     

 

   
   

   
 

   
  

Development Location:

Total of Fees Paid (Excluding Bonds) 972 Wack OX S

SG

   
 

 

CPE Date: _

eae sa
Security Deposits/Performance/Maintenance/Uncompleted Works Bond

 

 

 

 
 
   
 
 

 

 
 
 
 

   
  

   

  

 

Date application properly made: {6 /5/ 6

 
 

Total of Fees Paid (Including Bonds)

 
 
 

P-Land DevelopmentFEES & CONTRIBUTIONSIDEVELOPMENT FEES.doc

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0858 - Operational Works - Landscaping, Access and_or Carparking, Stormwater Drainage, Frontage Works & Excavation of Materials to Fill Another Site [As.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.