Council archive · source document
07/2224 - MCU - Detached House [As Published] · 132007.2224
INTEGRATED PLANNING ACT 1997 Environmentally relevant activities Most applications for an ERA in a HPA will not be accepted. Applications which may be made Tequire referral to the EPA. The assessment of some ERAs is assessed by NRW, others have been devolved to DPIF, NRW. or delegated Jocal government (see. EPA website for more information on devolved ERAs) Ifyou answered NO to Q20 you do not need to complete Qs 21-24. Ifyou answered YES to.Q20.and the developments in a-PA, your application must be asséssed by the administering authority" against the wild Code and:must comply with the code,-untess the proposal i is for” -development where an application will not be accepted, or is exempt from wild river ‘requirements (see Q2). You willbe.able to determine if an application will not be accepted for the development by answering Q21 - 024, IFyou answered NO to.Q21, you do not need td coniplete Q22."‘if you answered YES to Oat sou are required to compléte:Q22." ~*~ “Hyou answeyed NO to Q22, the: “sndtbe accepted. If you answer the application must bi against the Wild’ ‘Rive with the-code, * “Af you answered NO:to.Q23 and ‘is ‘proposed in.the HPA ‘the api ‘accepted. if you answered YESto application must be assessed. by the EP/ “NRW (as prescribed i in schedule 8A:of the against the Wild Rivers ‘Code and.must comply ., , ‘with the code. \fyou answered YES:to.Q24 the application vil . not be accepted. If you-answered NO to Q24, your application must be assessed by NRW against the Wild Rivers.Code and must comply ‘withthe cade. Exempt ERAs in a designated urban area * Ifthe development is proposed in a designated | Urban area there may be no wild river requirements. See Section 2 Q2. Note; All applications that can be accepted must be assessed against and must comply with the Wild Rivers Code (otherthan exempt ERAs in a " designated urban area). 20. 21. 22. Doés the application involve an ERA? me) Is the application for an ERA 20 instream? Jno CJ yes th IDAS Assessment Checklist, Version 20, 2 April 2007 O YES (ensure you have completed Part G of Form1} Is a quarry allocation notice held for the proposed ERA 20 instream? LINo C) yes Does the application involve any of the following in a HPA? i) alevel 2 ERA 11, (and is for specified works or a residential complex) ii) an ERA 19 (dredging) iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in the Wild Rivers Act 2005, and Environmental Protection Act 1994) _iv) an ERA 22 (out of stream) LJ no LJyes Is the proposed development for ERA 20 (out of stream) and; + — inaFMA;and / — notlow impact; and — not for a residential complex in the’ area, or for specified works. Cno [1 Yes Documentation If you answered NQ-to 025, :your application may be subject to an information request and processing ‘of the application may be delayed. 25. Has documentation been included with the application describing how the applicant proposes t comply with the mandatory requirements, required outcomes, and/ or performance requiremen as set out in the relevant part/s of the Wild Rivers Code? LJ No LJ yes 2) The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW- Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2224 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.