        May 2018 - Change to existing approval to partially enclose the subfloor area of unit 21 to provide
         a covered entry and storeroom area, an expanded bathroom/laundry and enclose under the
         existing upper level deck. An additional 18m2 approved.

        November , 2020 – Change to Lot 17 (i.e. the site) generally as follows:
            o Ground Level - new storage and new bathroom, and internal stairs;
            o Level 1 – extensions to provide for a new bathroom, kitchen and internal stairs;
            o Level 2 – extension to provide a new ensuite and bathroom and internal stairs;
            o Roof top terrace - family room, bathroom, outdoor terrace and spa

         New cement rendered wall cladding was approved along with additional privacy screens.
         Refer to approved plans in Attachment A.

The existing development approval is (TPC1632 / 51983.3225.12) was issued by Council on 25th
November, 2020 and approved the following plans (refer to approved plans in Attachment A)
subject to additional/amended conditions:

        Sheet 01, Issue D - Site Location, Site Plan & Floor Plans, prepared by Innovate Architects
         October 2020
        Sheet 02, Issue D - Elevations, Section & External Finishes Schedule, prepared by Innovate
         Architects October 2020
        Sheet 07 Issue C - Perspectives, prepared by Innovate Architects October 2020


3.       The Current Proposal to Change the Existing Development Approval

The works approved in the existing development approval have not yet commenced.

The landowners had commissioned Innovate Architects to compile working drawings based on the
existing development approval. As a result of detailed design considerations the landowners
identified the merit to further improve the utility of the existing building as approved to be altered by
the existing development approval by including the following alterations.

     o Ground Level – the proposed inclusion of a lift in the centre of the footprint and the
       rearrangement of all internal rooms with the exception of the northern most store approved
       in the existing development approval. The proposal plans in Attachment B indicated that
       footprint approved in the existing development approval in purple dashed line with the
       changes generally within the red balloon line work. The proposal is to extend the building
       footprint on the ground level about 1.2m to the south to allow for the proposed lift and in
       doing so the gross floor area for the ground level will increase from the approved 33.8m 2 to
       36.9m2 (i.e. by about 9%). The laundry is proposed to be relocated to the first floor.

     o First Level – the proposed inclusion of a lift in the centre of the footprint obviously needs to
       extend to the first level (and to second level). The proposal includes associated
       rearrangement of some storage in the kitchen and powder room and stairs and the inclusion
       of the laundry. The proposal plans in Attachment B indicated that footprint approved in the
       existing development approval in purple dashed line with the changes generally within the
       red balloon line work. Again the main purpose of the proposal is to extend the building
       footprint on the first level about 1.2m to the south to allow for the proposed lift. In doing so,
       the gross floor area for the first level will increase from the approved 34.33m2 to 53.8m2 (i.e.
       by about 57%)

     o Second Level – once again a lift is proposed in the centre of the footprint and the
       associated rearrangement of the approved rooms on this level is limited mainly to the
       bathroom and internal stairs. The proposal plans in Attachment B indicated that footprint
       approved in the existing development approval in purple dashed line with the changes
       generally within the red balloon line work. The proposed changes continue to relate to
       extend the building footprint on the ground level about 1.2m to the south to allow for the
       proposed lift. Again when doing so, the gross floor area for the ground level will increase
       from the approved 34.33m2 to 36.9m2 (i.e. by about 57%)



                                                  Page 4
Log in to download the original file

L04 To NSC -Lodge MCA.pdf · 882 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.