Original source · versioned page text
6.0 Planning Report
Building Suncoast Green
P: 07 5448 8500 E: [email protected]
Town Planning – Building Design – Development Management
AND
O3 Finished surface levels ensure land is free Editor’s note:
draining. Council encourages building methods that avoid the
use of fill such as suspended floor construction and
stepping down slopes rather than cutting and
filling.
O4 Filling or excavation does not adversely affect S4.1 Fill material placed over services does not Not Applicable – No filling or excavation is
sewer, stormwater or water utility infrastructure. impose any additional surcharge loading on the proposed for the development.
service.
S4.2 Where excavation is carried out-
A. a minimum cover of 600mm is maintained
around all utility infrastructure (to top, sides
and base of services); or
B. a retaining wall is provided to support the soil
surrounding the service;
AND
S4.3 Compaction with a vibrating roller is not
carried out within 600mm of any utility
infrastructure.
O5 Development does not adversely impact on the S5.1 Buildings or other structures within the Lake Not Applicable
Lake Macdonald water supply. Macdonald catchment (indicated on Figure 14.7)
are located above the 98.5m AHD level.
Services and Utilities S6.1 Where located in an urban zone, or a water or Complies – Existing connections will service the
O6 The house is provided with infrastructure, sewerage service area, appropriate connection is proposal.
services and utilities appropriate to its setting.
Building Suncoast Green (07) 5448 8500 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original