Council archive · source document
07/2062 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132007.2062
IN OOSA | Checklist - Applications Involving Land
Development & Land Use Sections
!DAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
Form 1PartA
1.1.1 Ensure that the form is fully completed.
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
4.1.2.4 If there are multiple owners, the consent of each owner is required.
1.1.2.2 ifthe owner of the land is a company, either ACN No. or Company Seal required.
“4.2 Form Part B-O Supporting Information
1.1.2. Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [7]
1.1.2.1 Ensure that each of Forms B-O which are attached are fully eee
3.1 Ensure that Part Gis completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
41 Ensure that items 5 1-28 have been checked and/or completed including information resending CT]
applicant details and owners consent.
eS } - es
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfi iguration and Operationat
Works) accompanies the application. in addition ensure that each set is complete.
8.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound. ‘
6.1. Ensure that at least 6 copies Sof any report accompanies the application (5 for Reconfiguration [-_|
and Operational Works). If the application is accompanied by a covering letter, ensure that itis
capable of reproduction. [-]
6.2 Inthe case of reports, ensure that 1 of the copies is in an VAS on A4 format ee ist unbound.
7A Ensure ‘that the application tee, as determined
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form.
Receiving Officer LS eee Sesame 7 ceceseseaeseeees Date co Lb Af Boo
Having completed this form and accepted the afpiication, please deliver both to the following IDAS Application Receiving
trays:-
«Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
* {Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.
« if the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
¢ {nall other circumstances — AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 30 pages
Page 2
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
\ Form 1 Development Application
Common details
i PART
The completion of all epplicable questions on Part A is mani datory for all applications. Part A must be accompanied by the completed IDAS Assesmient Checklist if
j
%% required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refér:to wwii:ina.qld.gov.au;
[Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guldé'1.,
[Description of land
All land the subject of the application, must be
identified. However, a description of the land is not
1.
Street address: fnotuding house number, street name, suburtViocality name & postcode) (if épplicabte)
Lor Z/UsNcoR S/R CLES . SUSE |
Advice for completing Q9 - Q9 applies if
development is on strategic port land or a strategic
Esra eter ed (ERA) 2. Name of water body or watefcourse, within which the developments proposed: (applicable) -
{ Advice for completing Q2 - Q2 apples tf [ |.
development is proposed within a water body or = - - -
+ Watecourse, 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates: ;
‘Aitvice for completing Q3 - Most land can be
oniind Hors on pen esotin, ol a 27. 277 2P (3536.4
|e goveent Ate documents or through the | 4 The above description is for: (tick applicable box) a
. However, ifthe land on which the development is the land ‘on which the development is proposed; or
proposed dos not ran Secon fe. oO ir the land adjoining the water body. or watercourse, within which the development is
watercourse) provide - proposed; or
0 sro ea ce ofon for he LD (iti) the water body or watercourse.
9 saunobhontins ‘oa in tceton Bay). 5. Shop / tenancy number: 6. Storey / level: : 7. Total area of land: (i? or ha):
lating QT - Q7 d if th za
development is wing water body o a ° [ _| L | | 657 nv
: | pies for completing eer Te 8. Local government area in which the land is situated: (eg. Esk, Henéy Bay, Woocoo et. (i applicable)
Noto: Areas below high water mark are nat within -
teal ‘governments aa oe aot under the LA G2
Local Government Act 1993, Port authority for the strategic port land or strategic port land tidal area on which the
development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
>
ie
- 118.
Dt land il area, For more des reo Gude 1 [ _ wen oe
' Proposal details 10; Existing use of the-land: (eg. vacant, single house, shopetc) «ey yy
[Hn recat mamaria teaicinrss | aaa Ly » 0X.
t 11. Proposed use of thie land: (eg. 6 unit epartment buikting, 20 fot re SURE rag gutin f
. ponds with a total area of 7 ha for which wastes are released into waterdetoy-] WAC” {
. LZx 2 AQ wwyTs i 98 eg!
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application o-Ps Dsg@A NG coury
{ Part A must stways be accompanied by other [. AS Abe
Feompleted parts of Form 1. For information about : -
When a part of Form 1 may apply refer to Guide 1, : : ° . SZ
Applicant details 13. Applicant's name:: 15. Contact person: ~~~ —-"-~
is making the application. The
Soe ee eee ates |ZES AIGIRD [ ]
[When signing and lodging this application 14. Contact number: ; _ 16. Facsimile number/e-mail address:
s ' ion th
Hain ote caret Te set f. [s44¢ L327 aoe _]
&
(eh ee wy Bs arn en 147. Postal address: CAOF //E O67
‘Bssessiny decidir
itemtaduasmny seriioon | (2, QRS 37., PEREGAN BCH, PETS |
rust be shown. Sighature: _ 19. Date:
(2 /2ce
Page 3
INTEGRATED PLANNING ACT 1997
Land owner's consent (if applicable)
; Section 3.2.1(3) of the IPA prescribes that an .
application must contain, of be supported by, the
-eritten consent of the tand owner!s, tthe application
involves:
Ei) i mateil change of use;
Oo of alot;
i) work on land below high-water mark & not within @
canal as defined under the Coastal Protection and
Management Act 1995;0r
‘[fv)_ work on rail corridor Land defined under the
s, Transport infrastructure Act 1994.
Section 3.8,1(2){a).of the IPA provides that
|Aandowner’s consent is a required for 2 mobile or
For more information refr to Gui 1
be
Name
Resource entitlement (if applicable)
‘Section 3.2.1(5) of the IPA requires evidence of
,fesourve entitement be given for applications that
involve a prescribed State resburce,
Section 3.2.1(10)(a)(li) of the IPA prescribes that an
gannot be taken to be properly made
bwithout evidence of the resource entitement
41 &
Refer to schedule 10 of the integrated Planning
Regulation 1998 that prescribes the nature of evidence
Tequired by the State in support of the lodging of this
1 development application,
‘Advice for completing Q23 :
The information in (i) — (v) is mandatory if evidence is
‘required under Q22 (i) or (il) above. :
The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where the
+ application involves any water or riverine quarry
material under the Water Act 2000.
| the time the evidence may be used. 23 (vi) must be
completed if the evidence is time limited.
ie
a
* Section 3.2.1(6A) allows the resource manager to limit
ENO -¢0 10 O24
22. This application’ és accompani
‘tes. ane
diby evidence: poate bo)
development is. consistent with. an: allocation of, or: entitlement to, ithe resource - =90
* tor 023 et
Vows
" development application, ‘may proceed in‘the absence of. an allocation
entitlement to, the resolifce - =g0t0Q23: °°
23. Evidence of the Fesource entitlement
(v) Date
Assessment triggers
This checklist does pot apply if the application requires;
‘the completion of Parts A and B of the Form only. It
must be completed for ail other apptications.
24.
Plans / drawings / reports
An apptication shoukd be accompanied by details to
‘Support the proposal & enable the assessment
:Manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the proposal
: and any potential impact.
2. Pians/drawings/repors accompanying this : appication
Plan ! Drawing / Report Number
- and any other relevant part
OFFICE USE ONLY (applicable to assessment manager's)
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement fails to provide all applicable information required by Part A
of Form 1.
Notification of Engagement of Private Centifi ier: -(Oplional formal)
To, Council. | have been engaged as the private certifier for the building work refefrad to in this colton
Date ofengagement / / Accreditation Number. __ Name: Signature: ~
Page 4
INTEGRATED. PLANNING ACT 1997 Part Version 2.4, 29 May.2006__
{Land owner's consent (if applicable) “| 20. «Land owner's consent to the making of this application: os |
| Section 3.2.4(3} of the IPA prescribes that an hae
¥ application must contain, or be supported by, the © Name 7 f Signature Date
| written consent of the land owner/s, if the application
| involves: +e
4) "a material change of use; 7
ill) reconfiguration of a fot;
{ (il): work on land below high-water mark & not within a
* canal as defined under the Coastal Protection and
= Management Act 19950r
i fiv} work on rail corridor land defined under the
Transport Infrastructure Act 1994,
Section 3.8.1{2)(a) of the IPA provides that ’,
landowner’s consent is pof required for a mobile or
temporary ERA .
! For more information refer to Guide 1,
LUY 04
Ke.
owe entitlement (if applicable) *, | 21. Does this application involve a State resource prescribed under-a regulation (other than, inching | ad,
Section 3.2.1(6) of the IPA requires evidence of quary ‘material on State coastal land under the Coastal Protection and Management Act.1995)?
{resource entitlement be given for applications that - : .
+ involve a prescribed State resource. (ono - -goto Q24 oe oO YES - go to Q22
{ Section 3.2.1(10)(a}fi) of the IPA prescribes that an . ee o. x" . }
{ application cannof en to be propery made 22. This application is accompanied by evidence: (tick applicable box}
je ence ne cement ~ [} (i) of the allocation of, or entitlement to, the resource - attach evidence and go fo Q23(v)
ice for comy in . - : . we _ . .
Refer to schedule 10 of the Integrated Planning C1 (ii) the chief executive of the department administering the resource is satisfied the
Regutation 1998 that prescribes the nature of evidence f,
required bythe Stee in support of the lodging ofthis development is consistent with an allocation of, or entitlement to, the resource ~ ~go
development application.
CO (itl) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23
Advice for completing Q23 23. Evidence of the resource entitlement:
ed i ONT aye feveree’s | (i) Resource entitlement / authority details (vi) Oficial stamp of the department
The official stamp of the Department of Natural administering the resource (if *
Resources, Mines and Water is mandatory where the i. applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
Scien 32) oe oa Eo
| Section 3,2.1(5A) allows the rcouce manage t limit
the time the evidence may be used. 023 (vi) must be Pm iti .
completed the Stine trio. {iii) - Position of — officer . we.
(iv) Signature of delegated officer
(v) Date -
"
: (vi) _ date of evidence a
oar an 5
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application? . *) os.
pe corpbton of Poe hed Bolteromanh te keyYEsS . (ZNO - the assessment manager may refuse fo accept this application on the *
| must be completed for aft other applications. “ ae grounds that the application has not been property made .
Plans / drawings / reports , 25. “Plansidrawingsireports a accompanying this application: :... :
' by detail S
{ fn apa stout be eccopani by el . e ~ Plan / Drawing / Report Number Title
.; manager, referral agencies and ‘any person viewing, yo. 7
{the application during public scritiny or puiblic “ai P|” oor 7 SACETS ¢ 7a
| notification to understand the scope of the Proposal
and any Potent impact . ig
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (enelcabe to to assessment manager's)
|
| RECEIVING OFFICER'S |
Page 5
INTEGRATED PLANNING ACT 1997. - : o "Part D, Version 2.0, 4 October 2004: Form 1 Development Application Material change of use assessable against a local government's planning scheme Completion of alt appficabfe questions on Part D is mandatory for all applications involving assessment of a taterial change of use (MCU) assessable against a focal governments planning scheme. Nature of the application 1. This application is for: (tick 1 or both # applicable). A development pemit authorises ~ [f}Freliminary approval for a material change of use of premises including conceptual poasaelnalbranenr wulte seplisely design for any associated works that require approval under the Planing scheme (le. and does not authorise development to occur. ___ Sensideration of the proposal concept) ~ ; AND LOR 7 @ : [A bevetopment permit for a material change of use of premises including conceptual ~ design for any associated works that require approval under the planning scheme. The subjectland : _|2. How the subject land is identified in the planning scheme (name the zone, precinct etc.) For the definition of "gross floor area” goto | | the planning scheme against which the - appication will be assessed. : . 3. _ Existing gross floor area: (if applicable) [ / | 4. Are there any existing easements on the land? ENO Oo YES ~ atfach plans of the location and details of the purpase of the easement Material change of use details 5: Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building, : vacant land to industry (lyre manufacturing) etc.) [ —_ 6. Number of employees: [ : 7. Operating days and hours: . | J : : Associated bullding works details (if te ¢ ' , @ applicable) 8. Site cover: do Jo / feat : area’ and “storey” go tothe planning 9. Gross floor area: . against which the appiication will be . : assessed. |10. Number of on-site car parking spaces: [ Z ; 11. Number of storeys / maximum height above natural ground: fez 12. Number of spe / 13. Hours and days the use will operate [ - : | Associated operational works details | 14. Details of associated operational works (eg. landscaping, cut and fil, drainage, road works ef.) ° (fepplicabie) : | "PLEASE NOTE This application cannot be accepted unless accompanied by Part A of Form 4. Ther assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable i information requested by Part A and any other relevant part of Form 1. OFFICE USE ONLY (eppiicabie to assessment manages} DATE RECEIVED REFERENCE NUMBERIS
Page 6
oc
* INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
" Form 1 Development Application
_IDAS Assessment —
Checklist —
(Formerly the “Referrals Checklist”)
“Unless you arigwered ‘none of thé above’ to.Q1,
‘the-application requires assessment by the
IMPORTANT NOTE FOR ALL APPLICANTS:
1.
2.
10,
1,
Environmentally relevant activity .~ |1. The application involves: (tick applicable box/es)
For moja information referto Guide 4,
This checklist was formerly referred to as the "Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
Under the IPA and IDAS framework, an application May require assessment by the local Council and/or certain Queenstand State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.). :
. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application. . 4
Therefore, the completion of alt questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
Itis the responsibility of the applicant to accurately complete this checklist.
Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
To assist you in answering the following questions a series of guides are available free from the IPA website. www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its selationship to the Form 1 development application.
Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au. 7
Section 3 provides advice about the referrals that can be Tequired for applications for building work assessable against the Building Regulation 2006.
ORIENT eee ee ee
MENT; (Completion:mandator
BSR Satta ary hs amie Raa
ding work assessable agairist the Building: ¢
Vie
tigers apy fo
u D(i) an environmentally relevant activity (ERA) for which a code for environmental compliance
has not been made - complete Part G of Form 1 .
administering authority? : C1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If-an entity, other than the administering Made - complete Part G of Form 1
Qe. is thé assessment manager for the ii none of the above .
application, the administering authority is a
concurrence agency for the application in relation
tothis matter. a ce
Note: An application involving ERA 19 and/or:20
“will.also require completion of Part Ky of Form &
for appraval-where an allocation under the Water
“Act'2000 is required. .
Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY (applicable to assessment manager)
‘The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 84 of the IPA.
For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’ . . . :
The ‘administering authority’ may he either the Environmentat Protection Agency, tha relevant locai government {for a davotved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).
Page 1
Page 7
INTEGRATED PLANNING ACT 1997
State-controlled road matters
For more information refer-to Guide 3.
Unless you answered “none of the above" to Q2, |
“the application triggers referral to the Department
of Main Roads (OMR) as a referral agency.
In certain circumstances DMR.
. agency, while in other circumst
be aconcurrence'agency.”
Schedule 2 ofthe IP Regulation.will assist you to
determine where DMR is an advice 'or
concurrence agency for the application.
WN
For more information Guide 42 12,
_ Unless you-answered “1 rione of the abo the'above" to Q3, 5
-the application requires assessment by the
genet of, Natural Resources and Wales
(NR ‘
‘fan agency, other than NRW is the assessment
-manager for the application, NRW: isa 0
‘concurrence agency 'for the application in relation
to-this matter.
‘you tickedQ3(i) or (ii), your application Tequires}
.feferral to NRW for assessment regardless of
_whether vegetation clearing is proposed or not.
"J2 The application involves: (tick applicable boxes)
- ]3. The application-involves: (tick applicable boxes)
IDAS Assessment Checklist, Version 20, 2 April 2007
\
(1 (i) * development on land contiguous? to a State controlled road and for -
Be) material change of use assessable against the planning scheme;
( (b) reconfiguring a fot unless - . . \.
« the total number of lots is not increased; and
« the total number of lots abutting the State- controlled road is not increased; 4
LD (©) operational work (not associated with a material change ‘of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)}-
+ associated with access to a State-controlled road: or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(1 (i) development on land not contiguous to a State-controlled road and -
{J (a) material change of use - /
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds-set by
that schedule;
O) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
“and exceeding the thresholds set by that schedule; 9
(1 (¢) operational work {not associated with a material change of use assessable against |
planning scheme or reconfiguring a lot mentioned in (b) above)— '
« assessable against the local government's planning scheme; and ,
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
“that schedule.
C1 (ill) none of the above
OW
material change of use -
(a) assessable against the planning scheme;
{b) on a lot containing -
¢ acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where’ the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Past J of Form 1
reconfiguring a lot ~
(a) ona lot containing’a category 1, 2 or 3 area shown on a property map of
“assessable vegetation or, if there is no property map of assessable vegetation io
the lot, remnant vegetation;
(b) -where the size of the lot before the reconfiguration is 2 hectares c or larger,
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 4
Oi)
operational work: -
{a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in {i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form1
mal (iv) none of the above.
D iii
‘Strategic port tand *
‘For more information referté Guide.14. 1.
‘you ticked (i) - the relevant Port Authority is the
sassessment manager forthe application. :
you ticked (il) Queensland Transport is.a
concurrence agency for the application.
The application involves:
Di. development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part | of Form 1
LC (ii) a material change of use that is inconsistent with the land use plan approved under the .
TI Act for the strategic port land - complete Part | of Form 1
Hii none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled toad; or that is pat of of a future State-
controlled road.
Page 2
Page 8
&
_____... Acid.sulfate.soils.
e@ if you answered "YES" to Q8, the application
* Environmentally Relevant Activity (ERA).
Can
INTEGRATED PLANNING ACT 1997
For more information refer to Guide 10.
Unless you answered "none of the above" to Q5,
the application requires assessment by
Department of Natural Resources and. Water
(NRW). .
{fan agency other than NRW is the assessment
manager for-the application, NRW is an advice
agency ‘for the application i in rélation to this
major hazard facilities,
For more.inform: ion refer to Guide:47.
IFyouansweréd "YES" to 0, the application
requires asseasment by the Department of
Emergency: Services (DES).
fan agency:other than DES is the assessment
fhanager for the application, DESis a
concurrence agency .for the application in
relation to:
IDAS Assessment Checklist, Version. 20, 2 April 2007
5: —The. ‘application- involves development omland'situated iran idenitified® tocal government area
and where the surface of the land is: (tick applicable box)
[1(i) below 20m AHDé and the development will involve the excavation of 4 000m? or more of
Soil or sediment at or below 5m AHD, or
(1 (ii) at or below 5m AHD and the development will involve filling the site with 1000m3 or more
of material
[Aiii) none af the above
Does the expicaion involve a material change of use for a major r hazard faclty or r possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
Erfio
O YES - complete Part L of Form 1
7.
The application involves:
watercourse
For more ififorination refer to Guide 16.
fequires assessment by the Department of
Natural Resources and Water (NRW).
lf an agency other than NRW is the assessment
manager for the appfication, NRW is a
concurrence agency for the application in
relation to this matter. °
Note: Part G of Form 1 is required to be .
completed as the activity of removing quarry
material from a watercourse is also an
“Wa
Wai [1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
For more information about items (a) ~ (f), refer (tick applicable box/es)
to. Guide-15, For'move inforitiation about itern . ‘ae Poe pe .
(gj fefer to Guide 14.Does my appfcation C1 {a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
e@ involve &8sessment of a referable dam? dam) - complete Part Ka, Ka, Ka, Ks, or Ke of Form 1 whichever is applicable;
Unless you answered ‘none of the: above" to Q7;
ihe-appleaton requires assessmentby the O (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
i Degartment of. Natural Resources and Water Ks of Form 1, .
* (NRW). : / (11 (©) fora subartesian bore, in declared subartesian area’, or in a certain area covered
Itai agency other than NRW is the aésessment by a water resource plan, for use for purposes other than stock and/or domestic
‘managet for the application, NRW is’ u Part Ks of Form 1;
~concurrerice'égency for the application in Se - complete Part Ki of Form , ;
relation to this matter. (1) (d) fora subartesian bore, in certain declared subartesian areas, for use for stock
‘ and/or domestic purposes - complete Part K; of Form 1;
(J (e) for taking overland flow water in certain areas covered by a water resource plan
. ~ complete Part Ke of Form 1;
Of for interfering with overtand flow water in a drainage and embankment area -
complete Part Kioof Form 1
(1 (g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
Xi none of the above.
Removal of.quarry material froma |8. Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?
fio
LU YES - complete Parts K7 and G of Form 1
5. The identified toca! government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloota, Doungias, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
Austatian Height Datum (AHD).
Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.
‘The declared ground water areas are listed in Guide 13 Development in a declared catchment area.
Page 3
Page 9
INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
locat goverment tidal areas refer to Guide 24.
Unless you answered “none of the above” to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).
If ‘an. ‘agency’ other than EPA i is the assessment
Manager for the application, EPA is a
concurrence j agency for the application in
is the assessment manager
forall presciit ad tidal-work.
\
IDAS Assessment Checklist, Version 20, 2 April 2007
9. The application involves operational work that is: (tick the applicable box/es) \
(1 ())_ tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
~ Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; of
tidal work that is prescribed tidal work" other than in a canal’2 -complete Part P of Form 1; Of
carried out within a coastal management district under the Coastal Act and for ~ complete
Part M of Form 1 if any box/es (a} to (i) below are ticked.
[J (a) constructing or installing works in a watercourse between MHWS and HAT (ie,
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal12 intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming fand under tidal water;
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
‘coastal land above high-water mark;
removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wall to establish a ponded pasture on land, og
than State coastal land, above high-water mark; or
iv) none of the above.
O ti)
D iii
C1 ()
Oe
Od)
CJ (e)
On:
C4 (9)
0 (h)
Di
“Operational work-below high water
«mark
For more information refer to Guide 18. For
more information about prescribed tidal work in
local governmenttidal areas refer to Guide.24,
Unless you answered “none of the above” to
Q10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Qld) as a concurrence agency.
Local government is the assessment manager
for al! prescribed:tidal work.
110, The application involves. operational work that is: (tick the applicable boxes)
(1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; of
( (ii) tidat work that is prescribed tidal work"4 - complete Part P of Form 1; OT
LJ (ili) carried out within a coastal management district'> under the Coastal Act and for -
(J (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of. Form 1;
C (b) reclaiming land under tidal water - complete Part M of Form 1; oF
Ole):
constructing a canalt2, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1;
Ai) none of the above.
Coastal management
For more information refer to Guide 18.
Unless you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
10 Tidal work is defined in sch 10 of the IPA.
‘111. The application involves: (tick the applicable box/es)
Ai)
D iii)
a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district! e@
a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is —
« the construction of a new premises with a GFA'6 of at least 1000m?
+ the enlargement of the GFA of existing premises by more than 1000m?
reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 - complete Part M of Form 1
none of the above
oii
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works complelely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works compietaly or partly within a local government tidal area. :
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and. Management ‘Act 1995, other than an area declared as a *
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, 90 to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an attificial waterway, must be
accompanied by the application for the operational works {o construct the artificial waterway.
Page 4
!
Page 10
INTEGRATED PLANNING ACT 1997 . __IDAS Assessment Checklist, Version 20, 2 Apri! 2007
Development-within-the-limits- ofa @——}42— Does the application involve development below high water mark’ and within the limits of a port
port under the Transport Infrastructure Act 1994?
For more information refer to Guide 18. For aN 0
information about prescribed tidal work refer to .
Guide 24. (1 YES - complete Part M of Form 1, or Part P of Form 1 ifthe work is prescribed tidal work
if you answered ‘yes’ to 12; the application
triggers referral to the Port
The Port Authority isa cohcu
developmentis —
4 =Wwithin-200m of. a ‘Shipping channél of “an ety
and exit Shipping corridor. for the port". *
© within 1000m of a swing | 0
shipping wharf, a mooring, anchorage of Spoil
agendy if the!
the Transport infrastructuré Act 1s
In alt other situation the Port Authority isan
advice agency. 4 _ oe eres epee Loe on 2 st
“Marinas we ee TG, Does the application involve operational work’ that i is tidal work for a marina’ with more ‘than 6
Fot more information refer to Guide 18. For | - vessel berths?
information about whether a marina is presciib dj aK
bial work referto Guide-24. The'local 0
' government i isthe
Dyes. complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
you answered "YES" to ar the application,
@ Jers referral to Queénslarid Fire and Resdize”
“Servi ice ag an advice agency.
mew WOK Ste “ ut
Tidal’ works in strategic, ort tand:tidal 14. Does the application involve tidal works within a strategic pot land tidal areaet?
areas ? 0
Fort thore information refer to Gui oO YES - compiete Part MofForm1:
Uriless you answered"NO" to 014; ie ralevant - .
Port Authority is the assessment manager for the
’ application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.
Heritage . 15. Does the application involve development ina heritage registered place as defined under the ~
For further information refer.to Guide 19. Queensland Heritage Act 1992?
"Ifyou answered "YES" to Q15, the application .
triggers referral to the Queénsland.Heritage LHV0
Couneil as concurrence agency for the O YES - complete Part C of Form 1
application.
“Uniess you answered “none of the above” to tye application involves: (bo applicable bees) theo h d the tot sh
Q15(b), the apptication involves referral to the (i) amaterial change of use assessable against the planning scheme and.the lot shares a
Environmental Protection Agency as an advice common boundary with a protected area or registered place under the Queensland
+ agency for the application . Heritage Act 1992:
@ . | Dii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queenstand Heritage Act 1992;
* EHiii) none of the above.
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including a list of the involves: {lick the applicable box/es) .
declared catchment areas within Queensland, r
feler to Guide 13. " oO {i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
Unless you answered “none of the above” to Li (ii) development assessable against the planning scheme involving the establishment or
O16, the application requires assessment by the expansion of a waste water disposal system, other than a disposal system for carrying
Department of Natural Resources and Water :
(NRW). out an environmentally relevant activity under the Environmental Protection Act 1994;
if an agency other than NRW is the assessmerit tii) none of the above
manager for the application, NRWis a
concurrence agency for the application i in
Telation to this matter.
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring fide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995,
20 Strategic port land tdal areas are the areas generally 50 metres seaward of igh water mark adjacent to strategic port land.
Page 5.
Page 11
INTEGRATED PLANNING ACT 1997
Contaminated land’
Applications involving material change of use
and/ or reconfiguring.a lot may trigger this
referral.
For more information referto Guide 5.
Unless you answered “none of the above" to
Q17, the application requires assessment by the
_Envitonmental Protection Agency (EPA). If jan
Pissed ne for
‘elation | to this matter:
IDAS Assessment Checklist, Version 20; 2 April 2007
17. The application involves: (tick the applicable box/es)
CJ (i) reconfiguring a lot for which all of part of the premises are — 4
{a} premises mentioned in the IPA, schedule 8, part 1, table 2- / 4
« item 5, including the exemption otherwise provided for by paragraph (d);
* item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
UO (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
{b} assessable against the planning scheme and if all or part of the premises is in an area
. for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 4 .
aii none of the above
.’ The application involves: (tick the applicable box/es)
(1 (i) reconfiguring a fot where any part of the lot is ~
« subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
+ situated within 100m of a substation site;.
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
. © any part of the premises is subject to an easement in favour of a distribution entity or
_ transmission entity under the Electricity Act 1994 and the easement i is fora transmission
grid or supply network under that Act; and
* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfi iguring a tot if any part of the premises is situated within 100m of a substation
site;
oO (iv) operational work that is fi ling or excavation assessable agains the planning scheme,
not associated with reconfi iguring a lot, if -
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
« the work'is located wholly or partly within 10m of a substation sie;
A) none of the above.
ii)
Dwi
Land designated: ‘for: ‘community
infrastructure
Applications involving, development ontand
designated for communily.infrastructure may
trigger this referral.
“For more information refer to'schedule 2 of the
“IP-Requlation, ”
Ifyou answered “YES” to Q19, the application
requires assessment by the.chief executive of '
the department administering the Act authorising
the development for the designated purpose.
‘Wan‘agehcy other than the designators the -
agency for the application in relation ‘to this
matter. ‘
Does the application involve development assessable against the planning. scheme and on ian®
designated for community infrastructure? .
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development ~
(a) for the designated purpose: or
(b) carried out by, or on behalf of, the designator.
NO ’
(YES
Page 6
Page 12
INTEGRATED PLANNING ACT 1997
>~-— SEQ. Regional-Plan— -—~
For more information refer to schedute 2 of the
Ip Requlatio n.
Refer to Chapter 2, part 5A and schedule 10 of -
the Integrated Pianning Act 1997, and schedule
2 of the Regulatory’ Provisions for relevant
Q20; the poleabais Tequires'asséssirierit y the |
Q Lf Urban vienanement H{OUM),
-20-—The-application- involves: (tick applicable bowes) =
IDAS Assessment Checklist, Version 20, 2 April 2007
C1 (i) a material change of use of premises —
(a) in a Major Development Area in the Urban Footprint for -
OD (i) anurban activity - .
(1 inan area incliided in a structure plan where the IPA, section 3.1.6
applies; .
[1 inan area not included in a structure plan ws where -
“es the IPA, séction 3.1.6 applies to the application for the material change
of use; or
e the premises exceeds 10,000m2; or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
+ impact assessment is required under the relevant Planning scheme’
CJ (ii) intensive animal husbandry, or
1 (iii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
LF) (i) an urban activity and not specified in: section 2.4(2); or
(1 (ii) residential development involving a rural residential purpose and not
, specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2)
. (d) in the Investigation Area for —
1 (i) an urban activity and not specified in section 2.10(2);
L (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or .
(1 (ii) intensive animal husbandry
C1 (ii) reconfiguring a tot-
Toa .
: On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3. 12).
os ie (iii) none of the above
Fisheries matters
For mate itformation refer to schedule 2of the IP
, Regulation.
Unless you answered “none of the above" to
~ Q21, the application requites assessment by the
“Department'of Primary industdes and Fisheries
(DPI&F).
If an-agency other than OPI8F is the assessment
Mmanager'tor the application, DPI&F is a
concurrerice agency for the application in
_ felation to items.{i) —(iv) and an advice agency
in ‘relation to item (v).
.21. The application involves: (tick the applicable box/es) -
oO (i) an assessable material change of use for aquaculture - compete Part O; of Form 1;
(1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;
Ciiii) assessable operational work completely or partly within a declared fish habitat area-
‘ complete Part O2 of Farm 1;
(1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(J (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a -
declared fish habitat area;
~ EYWi) none of the above.
Page7
Page 13
INTEGRATED PLANNING ACT 1997
integration of land use and public .
transport ©
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Requiation.
Unless you answered “none of the above’, the
application triggers réferrat to QT as a
concurrence agency.
Woy
t.
‘
‘ IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tick the applicable box/es)—
[1 (i) a.material change of use assessable against the planning scheme for a purpose
" mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
LO (ii) reconfiguring a lot—
(1 (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases; :
[1] (b) on tand that is completely or partly within a future public transport, corridor or
an airport's public safety area;
C1 (c). on land that is within 400m of a public passenger transport facility or a future
. public passenger transport facility, and the total site area is 5000m2 or greater,
(1(d) . for a residential purpose within the 25 ANEF contour for an airport;
(J (e) _ for aresidential purpose resulting in 100 or more allotments.
_ C1 (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a Jot mentioned in (i)
above, on land that—
(a) _ is completely or partly within a public transport corridor or a future public
. transport corridor;
. Ob)
will result in work that encroaches into an airport's operational airspace.
Yi Nv) none of the above.
Railway safety and efficiency, .
For more information: refer fo Guide'23, sehedyle
_ BA of the IPA'& '§chéthile 2.of the IP Re Regulation.
Unless you answered "none of-the above’, the
application tiggers referral to QT.as'a
concurrence agency.
- 3] 23. The application involves: tick the appicable boxes)
QO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
C1 (ii) reconfiguring a lot— :
- on land that is completely or partly within a a future public transport corridor,
Ota
future railway land or a railway tunnel easement;
[J (b) on tand that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
/ greater;
(Cc) _ ontand that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(1 (4) — on land that abuts rail corridor land, commercial corridor land or future railway
. land and an easement abutting the corridor or future railway land is created;
C1 (e) on land that is completely or partly within 100m of, and abutting an approach
. ’ to, a railway level crossing, and the total number of lots increases;
(1 () for a residential purpose resulting in 100 or more allotments.
C1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
C1 (a) _ is completely or partly within rail corridor and or commercial corridor land, and
‘the work is not for rail transport infrastructure or other rail infrastructure;
(J (b) _ is completely or partly within future railway land, or a railway tunnel easement;
O(c) — abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
' (iv) none of the above.
Moonie to Brisbane pipeline
For more information refer to schedule 2of the IP |
Regulation,
Unless you answered “none of the above", the”
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum}
Act 1923, currently Santos QNT Pty.Ltd, for
advice.
24, The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
C1 (ii) reconfiguring a lot
(1 (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the.
: work is located wholly or partly in the easement,
od {iv) none of the above.
Page 8
Page 14
INTEGRATED PLANNING ACT 1997
Koala habitat area
For more information, refer to Guide 26 and
schedule 2 of the IP Requiation.
Untess you answered “none of the above’, the ©
application requires referral to the Environmental
‘Protection Agency as'a concurrence agency.
IDAS Assessment Checkiist, Version 20, 2 Apri 2007
-25:—The- application-involves:- (tick the applicable bowes}=
oO 9 a ‘material change. of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in— -
[1 (a) clearing of native vegetation over an area greater than 2500m2;
Db) anew building and any reasonably associated structure with a total footprint
greater than 1000m?;
[1 (c) an extension to an existing building and any reasonably associated structure if
the extension has.a total footprint greater than 1000m2;
- (J @) extracting gravel, rock or sand from an area ‘greater than 5000m2;
Oe} excavating or filling an area greater than 5000m2,
(1 (f) additional traffic in a koala conservation area or koala sustainability area,
-, between 6p.m. on a day and 6a.m. on the following day.
Oi (ii) reconfi figuring a lot in a koala conservation area or koala sustainability area that will
resuitin~. ©
C1 (a) an increased number of lots; .
[1 (b) clearing of native vegetation over an area greater than 2500m?.
1 (ili) operational work in’a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the Clearing of native vegetation
over an area greater than 2500m?2. . ; oo
(C (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (if above) that is not for a domestic activity
and will result in —
C1 (a) clearing of native vegetation over an area greater than 2500m?;
L)(b) extracting gravel, rock or sand from an area greater than 5000m?,
‘C1 (e) excavating or filling an area greater than 5000m?,
a none of the above.
“Wild iver area
For more'information, refer to Guide 27
Ifyou answered YES to Q26, you must also
complete section 2 of. this’ checklist. This will
‘enable you to determine if your application. can
proceed ina wild tiver area and which referral
agency will assess your application against the
Wild Rivers Code, of ifthe proposed
development is “prohibited” in a wild river area,
Note: Development can ‘be ‘prohibited’ in a wild
river area because the application cannot be
accepted by ihe assessment manager.
26. Does the application involve development ina wild tiver area declared. under the Wild Rivers Act -
- 2005?
ENo
Clyes
@iivsiniey Approval
If you answered YES to,Q27, the application
triggers referral to the Department of Local
Government, Planning, Sport and Recreation as
‘an advice agency.
27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the Integrated Planning Act 1997?
io
_ Dyes:
Wetlands
Domestic activity means the construction or use
of a single residence on a lot and any reasonably’
‘associated building or Structure. Examples of a
. building or structure that could be reasonably
associated with a single residence include:
caretaker's residence, granny flat, building or
Structure used for a home business.
Note: Wetland is defined in the Integrated
Planning Regilation 1998.
Unless you answered ‘none of the abave™ to
Q28, the application ifivolves réferral fo the
Environmental ih ‘Agency as an advice
Jagency for the ape ication.
28. The application involves: {tick the applicable boxes) -
OW) — amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
Oi (ii) | reconfiguring a lot -
In or within 100m of a wetland that will result in
(2) (a) more than 10 lots being created; or
LJ (b) jots less than 5 hectares;
li) none of the above
Page 9
Page 15
INTEGRATED PLANNING ACT 1997 : * IDAS Assessment Checklist, Version 20, 2 April 2007
Conservation Estate 29. The application involves: (tick the applicable boxes) :
‘Uiban purposes is defined in the Integrated / (1 (i) a material change of use for urban purposes that is in or within 100m of any of the
Planning Act 1997 as ‘purposes for which larid is following -
ie ta sporty receaton Cod cornea D(a) a protected area, forest reserve, critical habitat or area of major interest under
purposes, but not including environmental, the Nature Conservation Act 1992;;, .
conservation, nuifal natural or wildemeéss area’ {1 (b) a State forest or timber reserve under the Forestry Act 1959;
purposes. oo “ ~ [1(©) amarine park under the Marine Parks Act 2004; L,
‘ { "hone of to." (1 (@) arecreation area under the Recreation Area Management Act 1988;
Ce) a world heritage area listed under the World Heritage Convention;
( (f Brisbane forest park under the Brisbane Forest Park Act 1977.
Oo (ii) reconfiguring a lot if -
(2) any part of the lot is situated in, or within 100m of, any of the following —
C1()) — aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
LI (ii) a State forest or timber reserve under the Forestry Act 1959; "
(J (ii) a-marine:park under the Marine Parks Act 2004; ot
Cl (iv) a recreation area under the Recreation Area Management Act 1988:
LI) . aworld heritage ared listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(2 (b) ‘the reconfiguration involves more than 10 lots being created, or any lot
"resulting from the reconfiguring is less than Sha; . e@
. iii none of the above. :
m
Page 10
Page 16
Wild River Area
It the responsibility of the applicarit to -
determine if the devefopment Is proposed in
awild-river area, :
Information about wild river areas. including the
geographical location and position of aon
mahageméant areas in relation to properties, can
be accessed by contacting the Department Gf
‘Naturat Resources and Water (NRW), accessing
‘the department's website:imww.titw.qld.qov'au or.
contacting the department By eniail on:
Wild [email protected]:qov.au
‘Note on Referrals
Referrals for devélopment in a wild river area
{other than for agricuitural activities-and animal”
husbandry activities) are not changed fromthe
existing referrat arrangements,
Notes on development assessable
against the Wild Rivers Code
:Forinformation regarding development in-a wild
tiver afea, see the relevant wild river declaration ‘|
“and;Guide 27. The.relevant wild river
declaration will provide information regarding
which types of development must be assessed
‘against the Wild Rivers Code, and in some
cases which'types. 6f development are exempt
Mfrortwild river requirements.
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this:
May vary between wild.river areas. The relevant
“declaration wilt provide the information applying
to each wild tiver area.
“Applications for some new developments will not |
be accepted if the proposéd development is in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.
1.
IDAS Assessment Checklist, Version 20, 2 April 2007
7
ina wild-ri
ithe mtr
Which wild river area is the development proposed in?
The proposed development is to.be'located in: (tick the applicable box/es)
(Ji) a high preservation area (HPA):
(J ii) a preservation area (PA); _
J iti) a wild river floodplain management area (FMA);
O iv) a wild river nominated waterway;
CJ v) a designated urban area (DUA).
Does the proposed development only involve any of the following environmentally relevant
Environmentally relevant activities 2.
(ERAs) in a designated urban area activities (ERAs) in a designated urban area (as-mapped in the relevant wild river declaration)?
Ifyou answered-YES, your application for an ; . .
ERA is exempt from any wild river requirements i) An ERA 28 or ERA 14; or
and provided there are no other aspects of this ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
development that require assessment against
wild rivers, you do not need to complete the KINO : O YES (ensure you have completed Part G of Form 1)
remaining questions in Section 2,
-If you answered NO to Q2, please complete the
remaining questions in Section 2. .
- Clearing native vegetation 3. _ Is the application operational work for clearing native vegetation in a HPA?
IFYES, there are a limited number of purposes
for which an application to clear native CYNo Oo YES (ensure you have completed Part J of Form 1)
vegetation may be accepted in a HPA. See. . .
Gulde 27 for a list of relevant purposes for | 4° |f YES, is the clearing?
which an application may be made In a HPA.
IEYES and you ticked Q4 box i) the application
May be made and is assessable against the Wild
Rivers Code. if YES and you ticked Q4 box ii)
the application will not be accepted.
Note: If clearing native vegetation is ina PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
Apply, do not complete the remaining questions
in Section 2.
O i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
- C1 ii) in a HPA outside a registered area of agriculture?
Page 11
Page 17
INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas : .
you answered YES to QS, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.
Ifyou answered YES to QS and licked box i) in *
Q6, your application is: required to be referred to
the EPA.
Note: If specified works are proposed i in:a local |
government area, it is prescribed. tidal work ~ the
“relevant tocal government will be the
assessment manager with the.EPA as a
concurrence agency
Ifyou answered YES to:Q5, and ticked box i) or
iii) in Q6, your application requires referral to.
OPIF.
If you answered NO to’Q5:and ticked box i} in
- Q6, thé application will not be accepted.
Ifyou answered NO:to Q5, ticked. box ii) in Q6
‘and the'developmentis hecessary to install
authorised works or-infrastructure where a
development permit is ‘not required, or if a
‘Tequired permit is held, the application must be
assessed against and must: comply with the Wild | °
Rivers Code. Applicatidns for,purposes other
than specified works or as described ‘above will “)
not be accepted. «
If you answered NO at QS and ticked bo)
Q6, the application may:be made if the works are:
in a PA, These applications must be. assessed .
against and must:comply with'the Wild Rivers.
Code, The.appiication will not be accepted if the
development is proposed to:be located in a HPA.
For more information about specified works refer
to Guide 27
Residential, commercial or industrial
development
If you answered YES to Q7, your application i is
Not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.
(f you answered NO-to Q7 and ticked either box
i) or ii) in Q8, the assessing agency is the
televant local goverment. The application must
be assessed against and must comply with the
Wild Rivers Code.
6.
IDAS Assessment Checklist, Version 20, 2 April 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27- :
Development in a wild river area)
wie Clves
The application is for one or more of the following:
O i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); oF ,
(J ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF
~ (ili) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
Is the application for residential, commercial or industrial development ina designated urban
area? -
[No Clves
IF NO, does the application for residential, commercial or industrial development involve: :
. (Ji) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or
LJ ii) operational works associated with reconfiguring a lot {ensure you have completed Part F
of Form 1). e
Animal husbandry activities
_ lfyou answered YES to Q9 your application
‘requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for anima! husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act -
2005 and refer to Guide 27.
Agricultural activities
If you answered YES to Q10, your application ,
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities wil .
not be accepted if proposed in a HPA. For more”
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
More information see Guide 27. .
10.
Does the application involve a material change of use for animal husbandry activities (as def ined
oh the Wild Rivers Act 2005) in a PA?
NO CT} YES (ensuré you have completed Part R of Form 1)
Does the application involve agricultural activities (as def ined under the Wild Rivers Act 2005) in
aPA?
NO [-] YES (ensure you have completed Part Q of Form 1)
IF YES is the application for:
(J i) a materiat change of use; or
[J ii) operational works.
Page 12
Page 18
INTEGRATED PLANNING ACT 1997
Works. that take. overland-flow-water—
The relevant wild river dectaration will state
works that take overland flow water are either
self assessable or assessable, of are exempt
from wild river requirements.
If you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q13 if) an ‘application i is not tequired
to be made however the works must comply With:
the relevant sel-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an appli
‘ls tequired and must be assessed:by NRW "°
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q13 ifi) your application is not
subject to wild river requirements,
Applications for developmerit that is‘dttier-than
that stated to.be assessable, self-adsessable or:
éxempt will not be accepted.
“Works that interfere with overland
flow water
The ‘relevant wild fiver declaration will state
“works that interfere with overland flow.water that’
are either sélf assessable, assessable or exempt
rom wild river requiréments.
Ifyou ticked Q15i), your application must be.
assessed by: NRW against the Wild Rivers Code
and must comply with the code. .
If you ticked Q15 ii) an application i is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
‘Rivers Code, otherwise the works become
assessable development for which an application
ts required and must be assessed by. NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
Myou ticked Q15 iii) your application is not
Subject to wild river requirements,
Applications for development that is other than
. that stated to be assessable, self-assessable or
-exempt will not be accepted. -
Waterway barrier works
Applications for building or raising waterway .
barter works in a HPA will not be accepted,
If you answered YES.to Q16, your application .
‘must be assessed by DPIF against the Wild
-Rivers Code and must comply with the'code.
=
13.
14,
5.
16.
IDAS Assessment Checklist, Version 20, 2 April 2007
}-+2—Boes-the application involve works that take overland flow water in a HPA or an FMA?
10 oO YES (ensure you have completed Part Ks of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
LJ i) assessable works ;
(J ii) self-assessable works .
(iii) exempt works
Does the application involve works that interfere with overland flow water i ina FMA?
mH NO O YES {ensure you have completed Part Kro of Form. 1)
If YES, is the application for works stated in the relevant wild tivers dectaration tobe?
(1) assessable works
(LJ ii) self-assessable works
Diy exempt works
Does the application involve building or raising waterway barrier works in a PA?
Ae O YES (ensure you have completed Part Os of Form 1)
Aquaculture (non ERA}
Applications for aquaculture in a HPA will not'’be
accepted.
if you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve aquaculture in a PA?
“TNO (yes (ensure you have completed Part O; of Form 1)
Works that interfere with water in a
watercourse
Note: tf the developments proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or.weirs,
stream reafignment or stream diversion) will not
be accepted.
tn a PA, applications for instream dams and .
weirs may be accepted in nominated waterways.
If you ticked box ii) in Q19, your application will
not be accepted.
-Note: Operational works outside a HPA or
nomlnated waterway are not subject to wild
tiver requirements,
More information and locations of noritinated
waterways is available by contact NRW,
‘accessing the department's website
www.nrw.ald.qov.au oF contacting the
-department by email on:
wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA? .
NO oO YES (ensure you have completed the relevant Part K of Form 1)
If YES, .
O i) The application is for an instream dam or weir; or
oO il) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir. .
Page 13
Page 19
_ INTEGRATED PLANNING ACT 1997
_ Environmentally relevant activities
Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
require Teferral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DRIF, NRW or delegated
- local govemment (see/EPA website for more
information on devolved ERAs) .
ifyou answered NO to Q20 you do not heed to
complete Qs 21-24.
Ifyou answered YES to. 20 and the. a 4
development is isin aPA, yo jon must be’
“ development where ‘an. spear nie
accepted, or is. ‘exempt from wild river ”
requirements (see'Q2): You willbe able to”. . -
determine if an“appli
‘for the'development
W you answered NO'to 021, you: donot need. to
complete Q22. fyou ‘answered YES to a2 you
-are required: to comptéte 022. .
cHyou answered N
_with the; ‘code.
“Ifyou answered Ni
‘is proposed in the
NRW (a8 prescribed in’schedule 8A of.the PA)”
* against the Wild Rivers Code and must comply’. J
‘with the code. =.”
if you answered YES to'Q24 the application wail
not be accepted. if you answered NO to Q24,
your application must be assessed by NRW .
against the Wild Rivers.Code and must comply
‘with the code,
Exempt ERAs in a: designated urban
varea
* Ifthe development is proposed in a designated .
‘urban aréa there may be no wild river
“requirements. See Section 2 Q2.
Note: All applications that can be decepted must
be assessed against and must comply.with the
Wild Rivers Code (ather-than exempt ERAs in a :
designated urban area).
20.
21.
22.
23.
‘Lino
: IDAS Assessment Checklist, Version 20, 2 April 2007
Doés the application involve an ERA?. .
Fr NO oO YES {ensure you have completed Part G of Form1)
Is the application for an ERA 20 instream? .
[+]NO Dyes
Is a quarry allocation notice held for the proposed ERA 20 instream?
IZ] No Clyes
Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
i) an ERA 22 {out of stream)
[No Clyes
Is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and
— not low impact; and
—- not for a residential complex in the area, or for specified works.
Llyes
‘Documentation
if you answered NO to-Q25, your application .
may be subject to an information request and
processing of the application may-be delayed. -
25.
Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requiremen
as set out in the relevant part/s of the Wild Rivers Code?
‘ “L]No C] yes
21 The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW. .
Page 14.
Page 20
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
era eae ak
tma
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and fodged with an
application for building work assessable against the Building Regulation 2006 only. .
to'schedute 2‘of the IP
Special-fite.services:- generally 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For mote informal ta schaidulé’ 2 table 4 and requires special fire services mentioned in schedule 2A part t of the Integrated Planning Regulation 1998
Schedule 2A cFthe [P Regulation. “ {IP Regulation) or includes an altemative solution assessed against the performance requirements of the
Assessment period 15 days. No response is a Building Code of Australia.
deemed refusal. oe te . 7 .
-Firé-saféty for budget accommodation {2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For ne information go.to-schedule 2'of the |P the subject of the application requires the installation of a fire safety system for a budget accommodation
Beaute building. oe
‘Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go.to schedule 2 of the IP if the application involves a workplace incorporating spray painting.
Regulation . . -
‘Retail. meat premises 4. An application may trigger referral to Safe Foad Qld as a concurrence agency if the application involves a
For more information go-to schedute-2 of.the IP retail meat premises.
Regulation : .
‘Private health facilities 5.. An application may trigger referral to the Department of Health as a concurrence agency if the application
For more-informnation go to Schedule,2 of the IP involves a private health facility.
Regulation .
\Workptace areatléss than 2.3m? 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
“For more infortn
application involves a work place area less that 2.3m2.
-Land céntiguous'to’a State-controlled
road .
For more information go to schedule 2 of the IP
Reguiation
An application may trigger referral to the Department of Main Roads as.a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.
An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the iP
Regulation
Pastorat workers accommodation —_| 8.
For more information go to schedule 2 of the IP if the application involves pastoral workers accommodation.
Regulation
Child care.centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
Far more information go to schedule 2 of the IP application involves a childcare centre.
Regutation .
Coastal development 10. An application may trigger referral to the Environmentat Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the {P if the application involves tand completely or partly seaward of a coastal building line?2.
| Regulation . .
Heritage 11. An application may trigger referral to the Heritage Council as a concurrence agency if the application
Fos more information go to schedule 2 of the IP involves a heritage registered place.
Reautation . :
Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries {DPI&F) as a
For more information go to schedule 2 of the P concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Regulation as an advice agency if the application involves assessable building work on land that adjoins a declared fish
. _ habitat area,
tntegration of land use and public 13. Ari application may trigger referral to Queensland Transport as a concurrence agency if the application
transport involves existing or future public transport corridors, or airport operational airspace?3,
For more Information go to schedule 2 of the IP.
Regulation © .
Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS : .
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.
Amenity and aesthetic impact of
particular building work for single
‘detached class 1 building or class 10
| building or structure
For more information go to schedule 2 table 1 of the
{1P Regulation.
Assessment period 15 days. No response is a
deemed approval.
15.
An application will trigger a referral to the local government if itis :
* fora single detached class 1 building or class 10 structure; and
* the local government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and .
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.
2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995,
Operational airspace is as defined in State Planning Policy 1/02 “Development in the Vicinity of Certain Airports and Aviation Facifities’,
Page 15
Page 21
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
designated rainwater tank area
For more information go to schedute 2 table 1 of the
{P Regulation and the QDC part 25.
Assessment period 15 days. No response is a
deemed refusal.
Whether pajticular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a-
occupied for residential purposes referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the ,
IP Requtation,
Assessment period 15 days. No response is 2
deemed refusal. . .
Design and: siting .[ 17. An application may trigger referral to the local government as the concurrence agéncy if the building work
For maré infomiation go to schedule 2 able Tf the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
‘IP Regulation, La | 18. An application may trigger referral to the local goverment as the concurrence agency if the building work
‘Assessment period § days. ‘No responsa isa does not comply with the qualitative statement for building clearance and site cover.
‘deeiried refusal. | 19. An application may trigger referral to the local government as the concurrence agency if the building work
: does net comply with the qualitative statement for performance criteria, 4, 5, 7, 8 or 9 of the Queensland
. Development Code, part 11 or 12. '
. | Fire safety in particular budget 120. An application may trigger referral to the locat government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more’information'go to schedule 2 table {.of the been completed.
IP Requ ion. .
‘Assessment period 15 days. ‘No Fesponseis a .
déemed refusal, .
21. An application may trigger referral to the local government as the concurrence agency to determine if the
Lo building work
‘For tore information’go.to- schedule 2.table 1 of the * — complies with the performance criteria of the Queensland Development code part 15; and
IP Requlation and the QOC part 15. ¢ the Work does not comply with an acceptable solution stated in the part,
ent period 15 days, No response is a @
refusall. . .
Building work for residential'service | 22. An application for building work for premises in which residential care service under the Residential
For more information go'to schedule 2 table toftha | Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
IP-Requlation and the QDC part 20. teferral to the-local government as the concurrence agency.
Assessment period 15 days. No response is a
deemed refusal. *
Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building, or rather structure, will trigger
rebuilding referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP. Regulati tion. 1
Assessment period § days. No response isa
| deemed refusal. : .
‘Building work for rainwater tank in 24. An application may trigger referrat to the loca! government as the concurrence agency to determine if the
building work or structure complies with the relevant performance criteria if -
¢ Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and
« Under the Queensland Development Code, part 25; the rainwater tank does not include an acceptable
solution for a relevant performance criteria.
Page 16
Page 22
Site Calculations site area 607.02m2 site cover 242.88m2 (40%) g-f.a. 273.00m2 (45%) |273m2 (45m2) allowed no. people 6.6 landscape area 335m2 (32%) Real Property Description Lots 106 & 107 Reg. Plan No. 94566 Parish of Weyba Drawing Legend Sheet No. Drawing Title Site Plan Floor Plan - Level 1 Floor Plan - Level 2 Floor Pian - Level 3 Dimension Plan - Level 1 Dimension Plan- Level 2 Dimenston Plan - Level 3 Elevations Elevations (OO Nigiag a win] =» a cians hel crewings shown PROPOSED 2x3 BEDROOM UNITS Drawing No. Drawing Title end remola the property of FOR STEVE & DIANNE SELBY PResidenthel Design Studia” inode aar-|—AT-LOT_219,CORSAIR-CRESENT—SUNRISE-GEACH| Date “Site Pian plans is prohibited. | | Eu j | Clients Signature of these plons) Do not scale plans, use written dimensions only. If any discrepancies are found, the following must be notified RESIDENTIAL DESIGN STUDIO-PHONE 5448 9000 Cut/fill indicated on plans may vary at construction stage, & builder to adjust as required . Any variation at construction stage is to comply with local building authority on earthworks/drainage All cut & fill embankments up to 1 m in height are to be no greater than 1 in 4 Retaining Walls All retaining walls and embankments are to comply with local building authority requirements Any retaining wall over 1 m in height must be engineer designed. Position of retaining walls & embankments may vary to suit site works. Contours & Levels Floor slabs to finish a minimum of 300mm above prepared platform level, 225mm above finished ground level. Timber floor framing to finish to heights above aS shown on drawings. All surfaces adjacent to buildings for a minimum width of 1m ,to be graded away from buildings to a minimum slope of 1 in 20 Level at alignments to be in accordance with local building authority requirements. Owner /builder is responsible for accuracy of cut/fill levels. ie Drainage All sewage & wastewater to be discharged to local building authority requirements. Licensed plumber & drainer or local building authority to prepare drainage plans. All‘ rainwater from roof discharge to be drained to street channel or as directed by local building authority. All boundary clearances shown are to verified by builder prior to set out & commencement of ony construction. It is recommended that a licensed surveyor be engaged to ensure minimum setbacks are not encroached on. Owner/Builder to confirm correct building allotment. Builder to confirm position of all services prior to commencement of construction. Phone 0408 718 069 Noosaville QUD 4566
Page 23
|
a | oOb:h e1eas “peuaucud
youd} sunjdl
___| 2987 2 eo | L_[SAS*-U2] dg 100] 4h coozicioz: | aiea | ova asanns— nasa tivsu0o— Ie OTL eee
690 B12 80FO auoug (suojd asaiy jo joxcuddo Buno2ipui) } z “ON 3004S AGT3S SNNVIG 9 FARIS YO e tito on foun! pu
eunjzeuBls syuel|5 i oni, Suweq | 2109 [on bulmerg SLINN NOONGIE €XZ GISOGOUd ow sunny» tay oy
§ ¢ “Apo sosodind aupodungt a0; $m weld oy cy reas TY | « SUOBBAA
, @30N v
; Vy
: a7ea
f
{ i 3
rm fe a a a a eA a 7
i \ \
' i uebies |
\ :
4 |
SHAN i
| \ @AOgD 7 JaAa| Soe z {
| | cana eee eta _--_____J __ ‘snd _
pee 3 |
| | \ CJC) LU in asaanat |
Fn Ld BR ea | |
| cr 4 SoododuT ‘hea CL {
; ; ‘ 20000020) c a | °
i ee ae aes x
! | |e pea Pa wos |g
a BEN [6 SpRUOpUN Oy Spied SOS 8] |s 4
\ \ aa LU @ 3 3!
| 4 \ 12 |
| ‘ | aqor ed = ore | 99BL19} il
| ‘ 1 T 2 o !
i \ Bg a Le s {
8 : \ \
I } | } n NS. ae
el yyeq B -
t 4 | a & |
! i lun a g| € "peq
| | t OzL = [} _ |
\ \ | ‘ eae
| q I _ a “” Cy [\e88 uaGueb
| 1: CUT III NTI UNIT NII I II ITI ARIAT IIIA IT TTT It & I !
I | } a . Se Lt _
‘ ! ~ eee
| ! aH SS est !
| | oe a |
| } & € *psq |
{ ‘ —
&
! 1 r e @
| : ! =I) ~s s | @
| 8 8
! 3 | - za d
i @9E1I9} | |
| 4 i H @ @ '
| ' Jat jo epissepun 0} saudd sso] 3 Ny ° i
2) Ia |
| i c z 2 I
| i hi * |
| f Wo yore 4 C—I ae c— |
I | ! _ |
| | Feo
! | I it |
| Cae tw |
! BAOGD Z fOAd} i
|
| |
i | ' uofueb
Page 24
FLOOR COVERING LEGEND
SELECTED FLOOR TILES
SELECTED CARPET
TIMBER FLOOR
TIMBER DECKING
EXPOSED AGGERATE CONCRETE
WINDOWS & DOORS
QO
xX
fixed panel
opening panel
obs obscure glass
fg
5g
dh
fixed glass
safety glass
double hung
pantry
refrigerator
hot plates
shower
single laundry tub
washing machine
ceiling manhole
100mm PVC downpipe
smoke detector alarm
wired to consumer
mains power
hot water system
!
I
i
I
'
t
i
!
i
t
i
|
i
{
1
i
|
|
|
|
l
I
t
|
l
|
|
|
|
|
|
|
|
c
Vy
ree
A
Elevations
The designs & drowings shown
on these plans are copyrighted
and remaln the property of
“Resitential Design Studle.”
thorized
‘Unau!
‘eopying/distrbution of these _|
plans Is prohibited.
ings shown on this floor
Ati’ ittings
PROPOSED 2x3 BEDROOM UNITS
FOR STEVE & DIANNE SELBY
or inclusions ore to
be
124-48 panel lift door
stacker stiding door
a
boi
for ilustroti oses onb
confirmed with builder. *
|
|
\
\
Drawing Title
zeae Floor Pian-Leve i 2
Clients Si
(nicating appro
Alignment
Alignment
tuming circle
1200mm high rendered
concrete block fence
exposed aggerate finish
to concrete driveway
ee]
1200mm high rendered
concrete block fence
nature
of these ® lens)
Alignment
Phone 0408 718 069
——--—P0-Box~1193-
Noosaville QLD 4566
Page 25
[cour | _ ies won. Sn at
99% GTO siKOSOON UL] d 100} sh jooziei0z |e | jn ya0-asianns—inasseo-uvsu0o—sietoT Ly} aaron
——— £6 F-X08- 8g ——— \ v “ON 3004S ASTSS SNNVIC 9? SARLS YO4 1 Ayedord oy wows po
J esayy yo jaasddo Buyooipuy) payybiXdoo esp suo}! asain uo:
880 B14 B0¥0 ONOld Gor gineuBls swell t epi Gumeg | z109 |-on Bumerg SIINN NOONOSE €XZ G3SOdOYd | umow stone 9 rss ou
‘yuo sesodind augosnye ae] Goo wot Bop cat te wos «=~ SUOBPADA
830N v
a aoa
2
ow eee ee eB eee eee eee eee ee ~
t
|
i
!
1
|
! Pap ee me nnn ! !
| | '
p—ap-—--—— fag ——t———~——-----—4
\ =z 90-2 | xO g1-Z} I Le LL jroo | |
| a { | |
| ! !
or !
JSS ®
\ so25e, Pp "paq zeas301 I
| Rezeee @ le | i ! |
S828 -—E 1 !
\ pod =] Ea ! ! i \
3 a | | |
a z . {
,_pso :
oe T—é 2 | Pama J !
| us omopte |
$ a 1
I
{ Oo ® ys ° 3 | |
sal ed |i pboorsr torr rr cr rrr rrr rect 2rsirra '
| me. y — 1
| I
O _ 3 unop | ‘ I t
1 f ® ays YY $ |
! i] $9 2 . poe 1
1 Wee = 7
6 \ 8 ! ! ! e
! bPpeq. | | !
i t gz g COOTTT OT I i |
{1 e
| ais yzeo1j01 d j 1 | |
| { gille 1 \ I \
{ Siz ® | \ | |
\ 2 i | i
| ! I i I |
| | ! Ld !
! SS a eee Loe |
| 1 | m2 aral-eh | r \
| ssoj6 ewe were SSO, sen see ne wane ee ee wen nee eee wee arr el
| Lop ————— nah ) |
CALL La LLL 4 |
! I
! |
l
I |
' |
{
Page 26
c
N,
aye
A
Elevations
The designs & drawings shown
fon these plans are copyrighted!
‘and remain the property of
"Residential Design Studio.
Unouthorized
copying/distrbutian al” thess
plans is prohibited.
level 2 above
PROPOSED 2x3 BEDROOM UNITS
FOR STEVE & DIANNE SELBY
|__AT_LOT_219,__CORSAIR-CRESENT,—SUNRISE-BEAGH+{1
Drawing Title
|Level 1
Dimension Plan
Clients Signature
(Indicating approval of
“Issued for Con:
these plons)
struction
Phone 0408 718 069
POQ-Box~1193-4
€\ Noosaville QLD 4566
Page 27
, | | Ce anne | | mR ee hens fre9 KO oO c ow aye e tee ee Note Elevations acius fitings o incusions are to be confirmed with bulder. [rice tts ov caged ROPOSED 2x35 BEDROOM UNITS (nde es aT ns) |g = aa Phone 0408 718 069 land remain the property of FOR STEVE & DIANNE SELBY : ; . ‘ a PO-Box4193- Uncut o-thea A I_LOT_219, _CORSAIR-CRESENT, SUNRISE-BEACH | Date : _— " = F idl No 2 Es Noosaville QLD 4566 plons is prohibited, Scale : D E = o 4
Page 28
c
Ny,
ayee
A
Elevations
The dasigns & drowings shown
Jon these plans are copyrighted!
and remcin the property of
‘Residential Design Studio.”
Unauthorized
copying/distribution of these
plans is prohibited.
‘Note
All furnishings shown on this fi lan are for ilustrati ses only.
Aaa BURRS SMe a ty Beare fo Pusat pu *
PROPOSED 2x3 BEDROOM UNITS
FOR STEVE & DIANNE SELBY
ATA-0T-219;—CORSAIR-GRESENT;—SUNRISE~BEACH 1
ap eotes
Drawing Title
7
{Dimension Plan
Clients Signature
(tadicating appro
of these plans)
Phone 0408 718 069
PO-Box-1193-]
Noosaville QLD 4566
Page 29
600mm WDE x 150mm DEEP
‘HEBEL’ EAVES
800mm WADE x 150mm DEEP
‘HEBEL’ EAVES
1200mm high rendered
concrete block fence
terrace
terrace Ra
natural ground _
Level 7
Wall Cladding Legend
RB DENOTES CEMENT RENDER TO CONCRETE BLOCKWORK
WITH SELECTED PAINT FINISH .
FCB DENOTES 6mm_ FIBROUS CEMENTSHEETING WITH 90x}2mm BATIENS
EQUALLY SPACED AT APPROX.300mm CRS.
SM DENOTES "HARDIES' SYCRON MATRIX CLADDING
VH DENOTES VERTICALLY FIXED T & G HARDWOOD
WITH NATURAL TIMBER GLOSS FINISH
Elevation B
|e designs & drawings shown! ~=PROPOSED 2x3 BEDROOM UNITS Drawing No. Drawing Title ‘ Clients Signature
on these plans are copyrighted)
- {Indicating approval of these plans) pepe ae 2 Phone 0408 718 069
Jord remain the property of FOR STEVE & DIANNE SELBY Sheet No. 5
Residentict Design Studio.
. 4 - ; FY, ———P0-Box-1193-
Unouthorized = ; av } d Noosaville QLD 4566
Page 30
600mm WDE x 150mm DEEP ‘HEBEL” EAVES 600mm WIDE x 150mm DEEP "HEBEL" EAVES 1200mm high rendered concrete block fence terrace Level RB terrace ~fatural ground ‘Elevation C woes Wall Cladding Legend RB DENOTES CEMENT RENDER TO CONCRETE BLOCKWORK WITH SELECTED PAINT FINISH . 500mm WIDE x 150mm DEEP FCB DENOTES 6mm FIBROUS CEMENTSHEETING WITH 90x12mm BATTENS “HEBEL EAVES EQUALLY SPACED AT APPROX.300mm CRS. ea SM DENOTES 'HARDIES’ SYCRON MATRIX CLADDING VH_ DENOTES VERTICALLY FIXED T & G HARDWOOD WITH NATURAL TIMBER GLOSS FINISH Level . side alignment side alignment Level od PROPOSED 2x3 BEDROOM UNITS Clients Signature FOR STEVE & DIANNE SELBY (Indicating approve! of these plans) Phone 0408 718 089 copying/distribution of these ATLOT-219; plons is prohibited. sigtesesusstasii ~ : PO Box 119 —__________——~— Issued for Construction —|-\-3 < ’ eae
Page 31
a a ys TAND USE SECTION FEES cag NOOSA | : RECEIPT TYPE SALE OF DOCUMENTS . Superseded Planning Scheme’ Documentation : 520 Copy of Permit/Approval Letter . 110 The Noosa Plan Documentation . 111 APPLICATION FEES: oe Material Change of Use - Codelimeact / Consistent 2900 521 Inconsistent §21 Assessment under Superseded Planning Scheme . 521 . Modification to a Development Permit “. 521 . Extension of a Currency Period . . 521 Operational Works - Landscaping , ‘ oo ‘621 e Bidg Work assessable against the Planning Scheme ° : 521 PRE LODGEMENT REVIEW. Half Hour | , §22 | One Hour , : 522 ADVERTISING ‘ Purchase Advertised Applications . §23 JETTIES © ‘ noe : Jetty Application Fee / . 524" * Jetty Bond ’ : : 8 . . : (Category 4) BONDS . Performance Bond “ . . $4 . : ‘ (Category 9) SIGNS . : . . 4 Registration Fee me, oO , 222 seA@u FEE . : a, Los Search of Land Use Section file 112 Liquor Licensing Request : 113 . ‘TOTAL. ¢ 28am NAME: Coe bis Ling bec ADDRESS: of — Qen Hora, fate ee 2 Coronet Ste ene go oe us77 FILENO: O77 / Zooe2r DATE: ti fis/o> ‘RECEIPTNO: _. ' ASS ea Signature of TP Officer: > Aire anen AUTHORITY NO: __ J [3/2201] 2Zob2/|
Used in these records
07/2062 - MCU - Multiple Housing Type 2 - Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.