Council archive · source document
07/2062 - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132007.2062
INTEGRATED PLANNING ACT 1997
State-controlled road matters
For more information refer-to Guide 3.
Unless you answered “none of the above" to Q2, |
“the application triggers referral to the Department
of Main Roads (OMR) as a referral agency.
In certain circumstances DMR.
. agency, while in other circumst
be aconcurrence'agency.”
Schedule 2 ofthe IP Regulation.will assist you to
determine where DMR is an advice 'or
concurrence agency for the application.
WN
For more information Guide 42 12,
_ Unless you-answered “1 rione of the abo the'above" to Q3, 5
-the application requires assessment by the
genet of, Natural Resources and Wales
(NR ‘
‘fan agency, other than NRW is the assessment
-manager for the application, NRW: isa 0
‘concurrence agency 'for the application in relation
to-this matter.
‘you tickedQ3(i) or (ii), your application Tequires}
.feferral to NRW for assessment regardless of
_whether vegetation clearing is proposed or not.
"J2 The application involves: (tick applicable boxes)
- ]3. The application-involves: (tick applicable boxes)
IDAS Assessment Checklist, Version 20, 2 April 2007
\
(1 (i) * development on land contiguous? to a State controlled road and for -
Be) material change of use assessable against the planning scheme;
( (b) reconfiguring a fot unless - . . \.
« the total number of lots is not increased; and
« the total number of lots abutting the State- controlled road is not increased; 4
LD (©) operational work (not associated with a material change ‘of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)}-
+ associated with access to a State-controlled road: or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(1 (i) development on land not contiguous to a State-controlled road and -
{J (a) material change of use - /
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds-set by
that schedule;
O) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
“and exceeding the thresholds set by that schedule; 9
(1 (¢) operational work {not associated with a material change of use assessable against |
planning scheme or reconfiguring a lot mentioned in (b) above)— '
« assessable against the local government's planning scheme; and ,
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
“that schedule.
C1 (ill) none of the above
OW
material change of use -
(a) assessable against the planning scheme;
{b) on a lot containing -
¢ acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where’ the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Past J of Form 1
reconfiguring a lot ~
(a) ona lot containing’a category 1, 2 or 3 area shown on a property map of
“assessable vegetation or, if there is no property map of assessable vegetation io
the lot, remnant vegetation;
(b) -where the size of the lot before the reconfiguration is 2 hectares c or larger,
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 4
Oi)
operational work: -
{a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in {i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form1
mal (iv) none of the above.
D iii
‘Strategic port tand *
‘For more information referté Guide.14. 1.
‘you ticked (i) - the relevant Port Authority is the
sassessment manager forthe application. :
you ticked (il) Queensland Transport is.a
concurrence agency for the application.
The application involves:
Di. development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part | of Form 1
LC (ii) a material change of use that is inconsistent with the land use plan approved under the .
TI Act for the strategic port land - complete Part | of Form 1
Hii none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled toad; or that is pat of of a future State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2062 - MCU - Multiple Housing Type 2 - Duplex [As Published]Related documentApplication case desk ↗