INTEGRATED PLANNING ACT 1997

State-controlled road matters
For more information refer-to Guide 3.
Unless you answered “none of the above" to Q2, |
“the application triggers referral to the Department
of Main Roads (OMR) as a referral agency.
In certain circumstances DMR.
. agency, while in other circumst
be aconcurrence'agency.”
Schedule 2 ofthe IP Regulation.will assist you to
determine where DMR is an advice 'or
concurrence agency for the application.

 

   

 

 

 

WN

  

For more information Guide 42 12,

_ Unless you-answered “1 rione of the abo the'above" to Q3, 5
-the application requires assessment by the

genet of, Natural Resources and Wales
(NR ‘
‘fan agency, other than NRW is the assessment
-manager for the application, NRW: isa 0
‘concurrence agency 'for the application in relation
to-this matter.

‘you tickedQ3(i) or (ii), your application Tequires}
.feferral to NRW for assessment regardless of
_whether vegetation clearing is proposed or not.

  

 

   

"J2 The application involves: (tick applicable boxes)

 

- ]3. The application-involves: (tick applicable boxes)

IDAS Assessment Checklist, Version 20, 2 April 2007
\

(1 (i) * development on land contiguous? to a State controlled road and for -
Be) material change of use assessable against the planning scheme;
( (b) reconfiguring a fot unless - . . \.
« the total number of lots is not increased; and
« the total number of lots abutting the State- controlled road is not increased; 4
LD (©) operational work (not associated with a material change ‘of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)}-
+ associated with access to a State-controlled road: or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(1 (i) development on land not contiguous to a State-controlled road and -
{J (a) material change of use - /
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds-set by
that schedule;
O) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
“and exceeding the thresholds set by that schedule; 9
(1 (¢) operational work {not associated with a material change of use assessable against |
planning scheme or reconfiguring a lot mentioned in (b) above)— '
« assessable against the local government's planning scheme; and ,
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
“that schedule.

C1 (ill) none of the above

OW

material change of use -
(a) assessable against the planning scheme;
{b) on a lot containing -
¢ acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where’ the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Past J of Form 1
reconfiguring a lot ~
(a) ona lot containing’a category 1, 2 or 3 area shown on a property map of
“assessable vegetation or, if there is no property map of assessable vegetation io
the lot, remnant vegetation;
(b) -where the size of the lot before the reconfiguration is 2 hectares c or larger,
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 4

Oi)

operational work: -

{a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

(b) not associated with a material change of use assessable against the planning
scheme mentioned in {i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form1

mal (iv) none of the above.

D iii

 

‘Strategic port tand *

‘For more information referté Guide.14. 1.
‘you ticked (i) - the relevant Port Authority is the
sassessment manager forthe application. :

you ticked (il) Queensland Transport is.a
concurrence agency for the application.

 

The application involves:

Di. development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part | of Form 1

LC (ii) a material change of use that is inconsistent with the land use plan approved under the .
TI Act for the strategic port land - complete Part | of Form 1

Hii none of the above

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled toad; or that is pat of of a future State-

controlled road.

Page 2

 

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2062 - MCU - Multiple Housing Type 2 - Duplex [As Published].pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.