ORDINARY MEETING MINUTES 26 JUNE 2014
2869 DA-12 B Sections with Sight Lines, prepared by Leffler 23/05/14
Simes
2869 DA- G Site Plan - Stage 1, prepared by Leffler Simes 04/06/14
020 Architects
2869 DA-21 B Tenancy Floor Plan and Elevations, prepared 23/05/14
by Leffler Simes Architects
Nature and Extent of Approved Use
3. The ancillary café must not exceed 150m2 of gross floor area.
4. Deleted.
Sunset Clause for Completion of Approved Development
5. The stage 2 Retail Business Type 4 - Showroom development lapses if the use has
not happened by 28 March 2019.
Land Amalgamation
6. All properties the subject of the development must be amalgamated, prior to the
commencement of the use.
Building Height
7. The maximum height of the main part of the Masters Home Improvement building
(comprising the retail, timber and receiving areas) must not exceed 10 metres above
finished ground level.
8. The mechanical plant shall be screened in accordance with the Approved Plans.
9. The maximum height of the garden centre area shall not exceed 9m above finished
floor levels, and shall include a 5 degree pitch as generally indicated on the Approved
Plans.
10. Certification must be submitted to Council from a Licensed Surveyor which certifies
that the Masters Home Improvement Store building does not exceed the maximum
height requirement of this Decision Notice.
Performance Bond
11. Security in the form of a cash bond or trading bank guarantee to the sum of $35,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works. The
cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Built Form
12. The exterior finishes indicated on the approved plans shall be maintained in the
finished building, and include at minimum the modwood screen panels to the south
elevation, PIR panels with exposed joints, FC sheet cladding, paint finish, groove
lines to concrete wall panels in selected paint finish to those walls on the north.
13. The canopy proposed to the front entrance of the Masters building shall be in
accordance with the Approved Plans, and remain exposed and open as a roof on
columns.
14. The electrical transformer shall be located to the rear of the building, as indicated on
the approved plans as ‘Transformer Option 1’.
This is not an official copy of Council’s Minutes
Page 17 of 33