Original source · versioned page text
Referral Agency Response - Planning RAP21 0026
Officer: Wilhelm Koschade Direct Telephone: 07 53296540 Our Reference: RAP21/0026 Your Reference: 210182 22 December 2021 EarthCert Pty Ltd PO Box 432 POMONA QLD 4568 [email protected] Dear Sir/Madam Referral Agency Response Planning Act 2016 I refer to your application and advise that Council, as a concurrence agency for the application, completed its assessment of the application on 21 December 2021. You are advised that Council requires conditions to be attached to any development approval. The conditions are listed below. application details Application No: RAP21/0026 Street address: 38 Woongar St Boreen Point Qld 4565 Real property description: Lot 1 RP 76786 Planning Scheme: Noosa Plan 2020 (25 September 2020) type of development The applicant seeks the following type of referral agency response: Concurrence Agency Response for Dwelling House concurrence agency conditions PLANNING When Conditions must be complied with Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 1.0 B Site Plan, Majstorovic Architecture 16/11/2021 1.1 B Upper Floor Plan, Majstorovic Architecture 16/11/2021 1.2 B Lower Floor Plan, Majstorovic Architecture 16/11/2021 1.3 B Loft Plan & Roof Plan, Majstorovic Architecture 16/11/2021 2.0 B Elevations, Majstorovic Architecture 16/11/2021 2.1 B Elevations, Majstorovic Architecture 16/11/2021 Building Height The maximum height of the development must not exceed 8.0 metres above the finished ground level and the natural ground surface. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Landscaping A minimum of 20% of the site must be retained as soft landscaping. Existing trees on the site must be retained, except where required to be removed to accommodate the approved dwelling. Sunset Clause for Referral Agency Response This Concurrence Agency response is no longer valid if works have not commenced within 4 years of the date of this notice, unless otherwise extended in writing by Council. ENGINEERING Site Access and Driveway A sealed access driveway must be provided from Woongar Street to all parking areas of the development. These proposed works must be undertaken with written approval in accordance with Noosa Council driveway crossover approval conditions and adopted standard drawings for the crossover type as required by the planning scheme. Earthworks within the road reserve for the construction of the driveway must be kept to the minimum required to smoothly transition to the adjacent verge areas Stormwater Drainage Stormwater runoff from the development must be disposed of on-site without causing scour or damage to the subject site or any adjoining property. Easements Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Geotechnical Stability All works must be carried out in in accordance with the recommendations contained in The Report on Geotechnical Investigation, Preliminary Slope Stability, 38 Woongar Street, Boreen Pont – Project No: 210281, Revision 0 prepared by ARCOS dated 21 May 2021 with the following amendments: The report and recommendations must be amended to acknowledge that disposal of stormwater runoff will be on-site infiltration The amended report must be resubmitted to the private building certifier prior to the issue of any Development Permit for Building Works*. *(Refer to Advisory Note) At the completion of the works certification must be submitted to the building certifier and Council from a qualified person* which certifies that the development has been constructed in accordance with the recommendations contained in the amended Geotechnical Report for the development and that the development has a minimum factor of safety against landslip of 1.5 in the long term. *(Refer to advisory Note) Earthworks and Retaining Walls All earthworks and associated retaining structures/batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. reasons for inclusion of conditions The proposal is subject to specific built form parameters outlined in The Noosa Plan. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the referral agency conditions: Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Qualified Person For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability for the development, a qualified person is considered to be a person who: is a Registered Professional Engineer of Queensland (RPEQ); and has a degree in civil engineering or engineering geology; and has a minimum of 5 years experience in the field of geotechnical engineering or engineering geology. rEPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE The applicant may make representations to Council about this referral agency response at any time before the application is decided pursuant to section 30 of the Development Assessment Rules. Yours faithfully, Wilhelm Koschade Development Planner Enc: Approved Plans/Documents [word/footer2.xml] Page 4 of 4 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 4 [word/header1.xml] 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.