Working Drawings- September 21
Attached to the e-mail Email with further plans.msg.
Original PDF page 23, section 1. The text section number identifies this passage in the reader.
100 LEGEND - INTERNAL
450 810 460 300 200 500 AP - APPLIANCE CUPBOARD
BC - BROOM CUPBOARD
450 810 560 1000 C'BD - CUPBOARD
DP - DOWNPIPE
DW - DISHWASHER PROV.
FW - FLOOR WASTE
GAS - GAS CONNECTION
HP - HOT PLATE
SHR HEAD
90
HWS - HOT WATER SYSTEM
L - LINEN
MIXER MH - MANHOLE
TR 815
700
2000 SCREEN/TILES
WC MW - MICROWAVE PROV.
SHR HEAD OHC - OVERHEAD CUPBOARD
PTY - PANTRY
1300
1300
TR600
400
R - ROBE
SMARTWASTE REF - REFRIDGERATOR SPACE
TRH TRH MIXER RH - RANGEHOOD
1100 MIXER
SH - SHELF
B 1000 TR - TOWEL RAIL
2440
1806AW.
905 VB
1000
TRH - TOILET ROLL HOLDER
A 23 C WC
900
UBO - UNDER-BENCH OVEN
800
1200 WO - WALL OVEN
D VB
400h x 1300w
SHAMPOO RECESS WC LEGEND - EXTERNAL
1100 FROM FLOOR BV - BRICK VENEER
820
CJ - CONTROL JOINT
100 1000 FC - FIBRE CEMENT SHEETING
RH - RENDERED HEBEL PANELS
DGPO RBB - RENDERED BLUEBOARD
RB - RENDERED BRICKWORK
70
DGPO
DGPO
UNIT 2 - BATH/LNDY ELEVATION A UNIT 2 - BATH/LNDY ELEVATION B RBL - RENDERED BLOCKWORK
SA - SCYON AXON
SL - SCYON LINEA
WM PROV
TUB 1 : 50 1 : 50 SM - SCYON MATRIX PANELING
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT
1780
WM TAPS IN
F CABINET 1300 1140 70 600 1180
23
820
820
E 70
400h x 1300w 820
SHAMPOO RECESS
2220 1100 FROM FLOOR
2000 SCREEN/TILES
700
RECESS
400
ISSUE
400
DGPO
820 # DATE DETAILS BY
UNIT 2 - LNDY/BATH GLASS PIVOT
SHOWER SCREEN
TUB
- 21-09-19 INCOMPLETE
- 26-09-18 PRELIM ISSUE
DC
DC
MIXER
1100
1100
- 23-10-18 WD ISSUE DC
1 : 50
900
E 18-06-19 SITE REV DC
F 09-06-21 PRE-CONTRACT
VB C'BD
- - - -
- - - -
- - - -
UNIT 2 - BATH/LNDY ELEVATION C
po box 6384 p (07) 5442 6413
1 : 50 maroochydore
qld 4558
f (07) 5450 6437
QBCC 1083000
1000 100 520 1200 800 1420 This plan remains copyright to
Ausmar Group and may not be
used in part or in whole without
the written consent of the author.
© 2017 Ausmar Group
LAUNDRY WRITTEN DIMENSIONS TO
TAKE PRECEDENCE OVER SCALE
MIRROR
200 895 MIRROR
500
UNIT 2 -
LNDY/BATH
2000 SCREEN/TILES
400
PROJECT DESCRIPTION:
400
SHR DGPO DGPO
TUB
Proposed Duplex For:
CLIENT:
1100
905 VB
WM MR K ANSCHAU
900
PROV
VB C'BD
SKIRT TILE
WM TAPS IN SITE ADDRESS:
CABINET LOT 1 WERIN ST
TEWANTIN
UNIT 2 - BATH/LNDY ELEVATION D UNIT 2 - BATH/LNDY ELEVATION E UNIT 2 - BATH/LNDY ELEVATION F DESIGNED BY REDDOOR
CUSTOM
1 : 50 1 : 50 1 : 50 DRAWN BY D CARTER
SCALE JOB CODE
1 : 50
DATE
09-06-21
D-KA
SHEET 23 OF 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.