Decision Date: 04/05/2017

1.	APPLICATION DETAILS

Application No:	OPW17/0050
Street Address:	3 Sunshine Beach Rd NOOSA HEADS  QLD  4567 5 Sunshine Beach Rd NOOSA HEADS  QLD  4567
Real Property Description:	Lot 197 RP 88772
Planning Scheme:	The Noosa Plan (28 October 2016)

2.	DECISION DETAILS

The following type of approval has been issued:
Development Permit for Operational Work (Adjustment to Existing Crossover and Driveway)

3.	RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval is 2 years starting the day that this development approval takes effect.

4.	ASSESSMENT MANAGER CONDITIONS

APPROVED PLANS
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
1073-01B	B	Proposed Driveway Resurfacing, prepared by AAA Design & Development Pty Ltd (certified by Jose Lesmes RPEQ 07198)	O9/03/2017
1073-02B	B	Section View AA, prepared by AAA Design & Development Pty Ltd (certified by Jose Lesmes RPEQ 07198)	O9/03/2017
1073-03B	B	Section View BB, prepared by AAA Design & Development Pty Ltd (certified by Jose Lesmes RPEQ 07198)	O9/03/2017
1073-04B	B	Section View CC, prepared by AAA Design & Development Pty Ltd (certified by Jose Lesmes RPEQ 07198)	O9/03/2017
1073-05B	B	Crossover Details, prepared by AAA Design & Development Pty Ltd (certified by Jose Lesmes RPEQ 07198)	O9/03/2017
SITE SPECIFIC CONDITIONS
Prior to arranging a prestart meeting, the applicant must provide for Council’s  endorsement plan/s of the longitudinal section/s of the proposed adjustment to the driveway to demonstrate that adequate ground clearances will be provided for B99 car and any other nonstandard delivery vehicle expected to use this driveway (refer to Appendix C AS/NZS 2890.1:2004). Where required, any necessary amendments to the approved plans must be identified and resubmitted to Council.
The proposed works must not result in changes to the existing width and levels of the existing public pathway within the road reserve or create any trip or safety hazard for the users of the pathway. As such the adjusted driveway must have grades that match the crossfall of the existing public pathway for the full width of the pathway.
The proposed reconstructed public pathway across the crossover must comply with the following requirements:
Must match the style and the texture of the finish surface of the existing pathway. Any alternative style, finish surface or colour must be given written approval by Council prior to commencement of works.
Must generally comply with Council’s Standard Drawing SEQ R-065 and/or the applicable engineering standards for the adopted and approved pathway surface.
Any expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred.
The required work must include any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services should be altered, so as not to create a pedestrian safety hazard
All pathways must:
Terminate in a manner that ensures smooth transition to existing surfaces for public safety.
All paths must have a slip resistant surface.
be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility
Any badly damaged existing channel, kerb or layback across the subject driveway must be replaced. Joins must be saw-cut to provide smooth and neat finish between the old and new sections.
Prior to arranging a Prestart meeting for the operational works, a security bond in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure the performance of all conditions of this approval.  The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit.  Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
Copies of the approved plans, duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer Construction at the “prestart” meeting
A condition report including photographs of the frontage of the site must be completed and submitted to council prior to the prestart meeting and to any works commencing.
Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council at the prestart meeting.
Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a prestart meeting is 5329 6291. The prestart meeting must include the relevant parties for the following aspects of the works:
Civil engineering works;
Traffic management;
Erosion and sediment control works;
Other relevant parties
A Construction Management Plan must be submitted to Council prior to the prestart meeting and must specifically address the following:
Traffic Management during all aspects of the construct phase including:
A site specific Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction.
Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased
Proposed arrangement to address access needs of the benefited users of the driveway during the construction phase.
Proposed fencing to the site during the construction phase of the development
Adequate parking arrangements for construction workers.
No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off.
Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures
Works programme identifying key components of the works and their respective durations
Establishment of a communication protocol with the adjoining owners, general public, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues
identification of complaint management procedures including:
Contact details for the on-site manager.
Dispute resolution procedures.
Any damage to the existing road system as a result of the operational works shall be fully repaired at the applicant’s expense.
Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring.
Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development.
All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers or as agreed to in the prestart meeting.
All works must be constructed and work procedure undertaken in accordance with:
The approved plans and conditions detailed in this Decision Notice.
The relevant conditions of any related higher order approval, permits or legal rights associated with the subject driveway.
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines.
Road Reinstalment and Pavement Design and Construction
Any required road widening or road pavement reconstruction must be provided generally in accordance with Drawing RS-170 and join neatly to the existing pavement so that there are no irregularities in line or level resulting at or adjacent to the join for the length of the construction. Where necessary the existing pavement must be brought to a satisfactory standard to allow for the above. Road surfacing must consist of a minimum depth of 40mm of an approved hot mixed asphaltic concrete.
The developer must notify Council’s Traffic Engineer for any works involving the removal or modification of existing council traffic signs and/or parking bays prior to such works commencing.
Where applicable root barriers are required to be installed behind the back of kerb for all new kerbs within 5m of a trunk of a tree.
Pavement design for privately owned works must be undertaken in accordance with the relevant standards.  Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ.
Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with.
Earthworks and Retaining Walls
All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development and certified by the supervising engineer.
Any retaining walls over 1.0 metre in height associated with the proposed works of this permit must be designed and certified by a suitably qualified RPEQ.
Appropriate fall protection must be provided where considered necessary (eg to mitigate fall or trip hazards) to ensure public and users safety in accordance with the recommendation of the design or supervising engineer.  Fall protection must be provided for all retaining walls over 1.0 metre in height.
Stormwater Drainage
Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (including public footpath).
Environment – Erosion and Sediment Control
Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the works site into existing stormwater system, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination.
Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the works site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice and standards.
Limit soil exposure on the site to a distance of no more than 2m beyond the extent of earthworks or disturbed areas shown on the approved plans except where the exposed soil is effectively stabilised without delay and prior to rainfall occurring.
Upon completion of the works all site surfaces must be fully stabilised.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
Where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
Where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Certification
Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit.
Final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6291 to arrange for the inspection.
On Maintenance
All municipal works (eg pathway) must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
Certification that all works have been undertaken and completed in accordance with the requirements of this Permit.
As Constructed details in accordance with Council’s Planning Scheme Policy.
Maintenance and operational manuals for all proprietary or site specific devices.
Off Maintenance
Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection.
A reinspection fee in accordance with Council’s Fees and Charge Register will be charged where:
A Council inspection reveals works do not comply with approval requirements.
Submitted certification falsely states works comply with approval requirements.
5.	REFERRAL AGENCIES
Not Applicable.
6.	REFERENCED DOCUMENTS
Not Applicable
7.	ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, an application for “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application.
Arranging Prestart Meeting
Contact Council on 5329 6291 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Right of Appeal Period of 20 business days should have been passed or the applicant has have confirmed by a letter or an email that he/she has accepted the conditions of Decision Notice and waived his/her appeal right.
On and Off Maintenance
A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise.
Environmental Advisory Note
The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that:  “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.”   It is an offence to fail to comply with the duty of care.  Substantial monetary penalties may apply to individuals or corporations breaching this duty of care.  Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act.
8.	PROPERTY NOTES

Not Applicable

9.	PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME
Not Applicable.
10.	FURTHER DEVELOPMENT PERMITS REQUIRED

Not Applicable.

11.	SELF ASSESSABLE CODES
Not Applicable.
12.	SUBMISSIONS
Not Applicable.
13.	REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.
14.	RIGHTS OF APPEAL
You are entitled to appeal against this decision.  A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval.  If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued.  Only one “negotiated decision notice” may be given.  Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”.
15.	OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices.

Yours faithfully

Monkeith Kadhum
Development Engineer

Enc:	Approved Plans/Documents
Appeal Rights

cc	Unitywater

Used in these records

About this file

File size
53 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

OpWorks Delegated Authority Report Appendix OPW17_0050.docx · 53 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.