Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

25-11-22 Operational Management and Maintenance Plan_Issue A

of 25

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 25 November 2022



Overflow pits require careful monitoring, as these are prone to scour and a build-up of sediment,
debris and gross pollutants. Debris can block outlets and can be unsightly. Inspection and removal
of debris should be undertaken regularly and debris should be removed whenever it is observed
on-site.

3.1.2 Maintenance Program

Maintenance of the bioretention basin would involve the following activities:

     •    Removal of sediment where it is smothering the bioretention basin vegetation;
     •    Manual removal and management of invasive seeds. Note herbicides should not be used as
          they would contaminate the downstream receiving waters;
     •    Debris removal in the bioretention basin and adjoining areas;
     •    Repair any damage to the profile as a result of scour, rill erosion or vehicle damage by
          replacement of appropriate fill (to match onsite soil) and revegetation;
     •    Till the bioretention basin surface, or remove the surface layer, if there is evidence of
          clogging;
     •    Regularly water the basin vegetation until plants are established and actively growing;
     •    Fertilising of plants with environmentally friendly products;
     •    Removal of plants that have died and replacement with plants of equivalent size and
          species as detailed in the Landscape Architect’s planting schedule;
     •    Pruning to remove dead or diseased vegetation material and to stimulate growth;
     •    Vegetation pest monitoring and control; and
     •    Inspection and repair of the subsoil drainage system.

Table 1 below sets out the recommended frequency for inspections and maintenance of
bioretention basins during the Operational Phase. Note the Schedule is a guideline only. Routine
clean out and maintenance should be scheduled based on the outcome of routine inspections.




 Excellence with Economy in Engineering                                                               4
 https://mpncnetau.sharepoint.com/sites/administration/shared documents/8000-8999/8600-
 8699/8662/reports/25-11-22 operational management and maintenance plan_issue a.docx`
Log in to download the original file

25-11-22 Operational Management and Maintenance Plan_Issue A.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.