Original source · versioned page text
BBNE01676-0001-REP-001-0-Noosa Calile Overland Flow_Optimized
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 16, section 1. The text section number identifies this passage in the reader.
2.2.1.4 Severe Storm A severe storm assessment has been completed, which has assessed the 1% (2100) AEP, assuming stormwater network is 100% blocked. Figure 2.6 highlights the flood depths in this event, which highlights flow depth reach a maximum 0.7m (in upstream pit), with flow depths in channel being generally less than 0.5m. This mapping also highlights that flows are contained within the designated flow path and do not break out and impact the proposed development. Downstream of the site it is seen that flows are contained within the cul-de-sac of Serenity Plan and designated footpath, and do not impact the transformer pad or adjacent properties. FIGURE 2.6: EXCERPT OF SEVERE STORM DEPTH MAP - 1% (2100) AEP FULLY BLOCKED NOOSA CALILE I BBNE01676-0001-REP-001-0 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.