Original source · versioned page text
BBNE01676-0001-REP-001-0-Noosa Calile Overland Flow_Optimized
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
3. CONCLUSION Engeny Australia Pty Ltd (Engeny) have been engaged by Calile Malouf Investments Pty Ltd to prepare a Local Overland Flow Assessment for a proposed Operational Works (OPW) development for application resort complex and shop at 3 & 7 Serenity Close Noosa Heads QLD 4567. Detailed overland flow modelling has been completed at a level of detail appropriate for Operational Works approval to confirm Alta Project’s proposed realigned drainage and overland flow design through the site is appropriate in achieving the design requirements for the project. The assessment has found that flows can be appropriately managed through the site via an overland flow path which connect into the Serenity Close cul-de-sac footpath, without impacting adjoining properties or resulting in non-compliant flows with the road and footpath. The assessment found that the finished floor levels of each building achieve a minimum 0.5m freeboard and is able to contain the severe storm event (i.e. 1% (2100) AEP fully blocked stormwater network). Reinforced turf is recommended for the last 20m of channel upstream of Serenity Close (velocity up to 2.30 m/s) and rock protection be placed to manage the outlet velocities (rock size D50 = 200mm and extend 3.6m past the outlet). NOOSA CALILE I BBNE01676-0001-REP-001-0 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.