Original source · versioned page text
BBNE01676-0001-REP-001-0-Noosa Calile Overland Flow_Optimized
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
CONTENTS
1. Introduction 1
1.1 Site Characteristics 1
1.2 Regional Flooding 2
1.3 Project Data and Guidelines 2
1.4 Performance Criteria 3
2. Overland Flow Assessment 4
2.1 Local Hydrology Model 4
2.1.1 Catchments 4
2.1.1 Modelling Parameters 6
2.1.2 Summary of Peak Flows 6
2.2 Local Flood Model 6
2.2.1 Model Setup 6
2.2.1 Results 10
2.3 Lawful Point of Discharge 14
3. Conclusion 15
4. Qualifications 16
Appendices
Appendix A: Site Layout 17
Appendix B: Engineering Design Plans 18
Appendix C: Proposed Flood Maps 19
Tables
Table 2.1: Existing and Developed Catchment Parameters ................................................................................................................................. 4
Table 2.2: Key modelling parameters - HYDROLOGY ........................................................................................................................................... 6
Table 2.3: Peak Discharge .................................................................................................................................................................................... 6
Table 2.4: Adopted manning’s ‘n’ roughness....................................................................................................................................................... 7
Table 2.5: Summary of Finished Floor Levels and Flood Immunity.................................................................................................................... 11
Figures
Figure 1.1: Site Locality ........................................................................................................................................................................................ 1
Figure 1.2: NSC Flood Hazard Mapping ............................................................................................................................................................... 2
Figure 2.1: Catchment Plan .................................................................................................................................................................................. 5
Figure 2.2: TUFLOW Setup ................................................................................................................................................................................... 8
FIGURE 2.3: MANNING’S ‘N’ VALUE..................................................................................................................................................................... 9
Figure 2.4: Excerpt of Flood Depth and DV Map - 1% (2100) AEP ..................................................................................................................... 10
Figure 2.5: Freeboard Assessment..................................................................................................................................................................... 12
Figure 2.6: Excerpt of Severe Storm depth map - 1% (2100) AEP Fully Blocked ................................................................................................ 13
NOOSA CALILE I BBNE01676-0001-REP-001-0 iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.