Original source · versioned page text
BBNE01676-0001-REP-001-0-Noosa Calile Overland Flow_Optimized
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 35, section 1. The text section number identifies this passage in the reader.
SUITES
OVER
FFL22.25
OVERLAND
FLOW PATH
VERTICLE CLEARANCE 5.25m
4.275m WIDE SHARED
VOLUMTERIC
SEWER & STW
EASEMENT
FFL19.0
INVERT LEVEL (TYP)
TRIM PILE TO PIPE
1.275m 1.5m 1.5m
RL17.8
RETAINING WALL TO
STRUCTURAL IL16.75
ENGINEER'S DETAILS
ROCK GABION
300min Ø600 STW PIPE RETAINING WALL
CLEARANCE IL15.084
Ø150 SEWER MAIN
IL15.084
PROPOSED Ø1800 RAPID
INFILTRATION PIT (RIP)
PROPOSED
BASEMENT
FFL12.0
PROPOSED SHEET PILE TO
SECTION
500 NOM
D3
MANUFACTURERS SPEC.
O N
SCALE 1:100 A1 D01
I
AT
R M
FO
IN
O R
F
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 DRAINAGE CROSS SECTIONS - SHEET 2
PRELIMINARY Date: AUG 2022 26 Memorial Avenue, Cotton Tree PROPOSED HOTEL
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No:
A6769-24-D04 4 of
Email: [email protected]
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CALILE MALOUF INVESTMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6769-24-D03-D06 DRAINAGE SECTIONS.dwg - DATE : 27/2/25 - 11:36am - XREF's: Council Ref:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.