Council archive · source document
APPROVED Plans · OPW11/0320
Plans and drawings: the text below has words only, no drawings.
Lae
‘i
| Tae
OPW
TRU
10 ° pp
4195309, °105ag7
10,
A
STN/Dpy ’
Ns Lot
NS + 4
1 <
05.239 + 105. sot eC + isting fog
552 Be By to be removed and re-
Su, NS/TB on-site as di
* 107.969
106. aot eg -
93 a 107/975 =
05.126 Turnaround : a se, PF
104.643. Ns area 07. 7 GRA oo
105.0 pd
103.412 af NS/TB . SS
+ is
b NS 08.078 ‘cy
106.534 Proposed new
driveway location
Driveway to be constructed
in accordance with SEQ R-050
NS
4
108.555
ALL LEVELS AHD DER om Sm <
wt 108.661
¥\B a
a
a
&
3 co
el5 >
Ole |— ©
=z |2 0
5 |g in
+ 5s |e So
EES
a Se |S
wn
al =
wy io
a
o| =
a| =a
=z} Oo
—_
2| 3
S|) abe
Ss) Sv
=
a| & 5
anv
n N
a
a i 5
Da
Foo 2
vl ar &
S| Oo oO
Ss} en. 0
= ar wU
COUNCIL
]
t
S TOOHEY
Existing
Driveway Crossover
(JOIN TO REAR OF
XISTING CROSSOVER)
RAL_AND_ CIVIL
STRUCTU
LINDSA Y CONSULTING rb
RPEQ 4928
PH 54 792 118
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
SOWNIVH)
SOL 1H WALVG
T3A31 13 AVMSAING
V3A37 3IVAYUNS TWYNLYN
ua3e
W130 UIA SSOUD AVMIARG
108.79 |108.79 | 0.00 BACK OF KERB
108.974 | 108.61 | 3.81
108.667 | 108.445 | 10.00
To wT
08.170 |108.170 | 20.000
107.677 | 107.897 | 30.000
107.260 | 107.798 | 33.590
sve
106.520 | 106.782 | 40.000
106.032 |105.820 | 46.060
‘0000Se
Buoy U1'6 9A
106.011 }106.095 | 50.000
106.273 }106.160 | 52.65
om wb
j
106.700 | 106.700 | 58.49
dd J9VYVO
IANiny
|
|
|
|
|
|
j
|
|
eT Re DSTO AOE ag
S TOOHEY PROPOSED SEWER REALIGNMENT
17 TOPAZ STREET a
110586-15
LINDSA Y CONSULTING tro
STRUCTURAL AND CIVIL ANGINEERS |
(A
OFF. 2/82 PARKER STREET/ MAROOCHYDORY
RPEQ 4928
PH 54 792 118
COOROY
Page 3
opw | AN
Item i
Performance ae Performance Indicator CONSTRUCTION MANAGEMENT PLAN DIARY
Indicators
1. Vegetation No disturbance of soil below retained vegetation due to construction activities. Weeki Vsual Inspection After: Rnfall Event
Operational Works — Sewer Re—Alignment
2. Hours of Work No work conducted outside specified hours without satisfactory evidence of measures Principal:-
taken to suppress noise and other emissions / dust. Contractor: S TOOHEY
Location:- 17 TOPAZ STREET, COOROY
3. Lighting No resident's complaints regarding construction security lighting. Job Ref. No:- 110586 Council File Ref. No.
1. Existing Roads No abutting public roads contain soil, gravel, clay or other such materials originating Dofe- Regular Monitoring Weekly
, 3 from onsite construction activities. Approx Time:~ TT am/pm ~—) Speciat Event Monitoring {briefly describe event)
5, Signage No observed or reported incidents due to inadequacy or absence of signage or other Hille Canibel Condition Corrective Action CAPPREHVE RERBRC THRE
control measures. em Monitored Measure Installes | Acceptable Required ieee tbe)
v
®
6. Waste Control No complaints from local residents and site is kept tidy at all time
Retained Vegetation
a, No occurrence of illegal dumping onsite and all materials where possible have been
7. Waste Minimisation .
appropriately recycled. Alp Enalaslatie
8. Dangerous Goods No spillage or seepage of dangerous goods stored onsite. ni
jolise
9. Erosion & Sedimentation No visible signs of sediment laden waters leaving the site. Security Lighting
10. Traffic Management No works are carried out without implementation of the approved Traffic Management Wikeatons
Plan.
sone isting Utiliti
11. Existing Infrastructure No unplanned damage to existing utilities and infrastructure. Existing Ubttas) Roges) BuDnalnage Infastructure
12. Non Conformances All non conformances have been reported and rectified Ganstruction Teeffle & fatking
The site foreman is to monitor the performance of all construction activities and any departure from the Construction Waste Minimisation 2 Recycling
Monitoring Management Plan control measures is to be immediately rectified.
Erosion & Sedimentation Control (Environmental Diary)
The site foreman is to be responsible for all inspections and maintenance of the Construction Management Plan.
Responsible Pefson
The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for sediment Item Monitored
control) on a weekly basis as a minimum, but also after every significant rainfall event (which causes site runoff) or
other special event affecting the site or any watercourses traversing the site. The Construction Management Plan Diary
Reporting (in conjunction with the Environmental Diary) shall be completed and delivered to the Superintendent for record and audit Any Specal Connents:
purposes with each progress claim for the construction works.
The site foreman is to arrange all corrective actions, controls and rectification activities, and report on all measures
Corrective Actipnstaken in the Construction Management Plan Diary.
glk <
a
&
S|
ele 9
© 1." |B
fie
3 BES
i Ss | —
n
nl &
wy
S| =
S| =
=|
—_l)
2| 4
S|) er
S| Sw
a] =e
sn”
a N
Alea,
Aus
tloo
Baers
s| 2.8
~
(= 4
eon Y
>-
lu
x=
3
°
—
wn
wo, oo
me
S
tin
a|e
lu
oO] +
aw)n
=
c:
LINDSAY CONSULTING £75 &&
OFF. 2C/82 PARKER STREET/ MAROOCHYDORG