Council archive · source document
APPROVED Plans · OPW11/0320
Plans and drawings: the text below has words only, no drawings.
opw | AN Item i Performance ae Performance Indicator CONSTRUCTION MANAGEMENT PLAN DIARY Indicators 1. Vegetation No disturbance of soil below retained vegetation due to construction activities. Weeki Vsual Inspection After: Rnfall Event Operational Works — Sewer Re—Alignment 2. Hours of Work No work conducted outside specified hours without satisfactory evidence of measures Principal:- taken to suppress noise and other emissions / dust. Contractor: S TOOHEY Location:- 17 TOPAZ STREET, COOROY 3. Lighting No resident's complaints regarding construction security lighting. Job Ref. No:- 110586 Council File Ref. No. 1. Existing Roads No abutting public roads contain soil, gravel, clay or other such materials originating Dofe- Regular Monitoring Weekly , 3 from onsite construction activities. Approx Time:~ TT am/pm ~—) Speciat Event Monitoring {briefly describe event) 5, Signage No observed or reported incidents due to inadequacy or absence of signage or other Hille Canibel Condition Corrective Action CAPPREHVE RERBRC THRE control measures. em Monitored Measure Installes | Acceptable Required ieee tbe) v ® 6. Waste Control No complaints from local residents and site is kept tidy at all time Retained Vegetation a, No occurrence of illegal dumping onsite and all materials where possible have been 7. Waste Minimisation . appropriately recycled. Alp Enalaslatie 8. Dangerous Goods No spillage or seepage of dangerous goods stored onsite. ni jolise 9. Erosion & Sedimentation No visible signs of sediment laden waters leaving the site. Security Lighting 10. Traffic Management No works are carried out without implementation of the approved Traffic Management Wikeatons Plan. sone isting Utiliti 11. Existing Infrastructure No unplanned damage to existing utilities and infrastructure. Existing Ubttas) Roges) BuDnalnage Infastructure 12. Non Conformances All non conformances have been reported and rectified Ganstruction Teeffle & fatking The site foreman is to monitor the performance of all construction activities and any departure from the Construction Waste Minimisation 2 Recycling Monitoring Management Plan control measures is to be immediately rectified. Erosion & Sedimentation Control (Environmental Diary) The site foreman is to be responsible for all inspections and maintenance of the Construction Management Plan. Responsible Pefson The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for sediment Item Monitored control) on a weekly basis as a minimum, but also after every significant rainfall event (which causes site runoff) or other special event affecting the site or any watercourses traversing the site. The Construction Management Plan Diary Reporting (in conjunction with the Environmental Diary) shall be completed and delivered to the Superintendent for record and audit Any Specal Connents: purposes with each progress claim for the construction works. The site foreman is to arrange all corrective actions, controls and rectification activities, and report on all measures Corrective Actipnstaken in the Construction Management Plan Diary. glk < a & S| ele 9 © 1." |B fie 3 BES i Ss | — n nl & wy S| = S| = =| —_l) 2| 4 S|) er S| Sw a] =e sn” a N Alea, Aus tloo Baers s| 2.8 ~ (= 4 eon Y >- lu x= 3 ° — wn wo, oo me S tin a|e lu oO] + aw)n = c: LINDSAY CONSULTING £75 && OFF. 2C/82 PARKER STREET/ MAROOCHYDORG
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED PlansRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.