Delegated Report - Code - Planning OPW26 0094 (As Published) · OPW26/0094

of 9

Text shows just the words. Original shows the document exactly as it was published.

               1.      APPLICATION DETAILS

                   Application No:                  OPW26/0094

                   Street address:                  30 Mossman Ct Noosa Heads Qld 4567

                   Real property description:       Lot 149 N 21859

                   Planning Scheme:                 Noosa Plan 2020 (20 March 2026)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Operational Works - Earthworks
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.


                          Plan No.              Rev.     Plan/Document Name                       Date


                          OW3.1                 .        Earthworks Plan                          October 2023
                                                         Prepared by SCG Consulting

               CURRENCY PERIOD
               2.      The Currency Period for this development approval lapses if the development has not
                       substantially started by 9 September 2028, unless an application to extend the currency
                       period is approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                       Engineering
               3.      All necessary approvals from external service providers (e.g., Unitywater) and external
                       parties on which the development works are proposed have been obtained and a copy
                       supplied to Council.
               4.      Any changes to the details associated with the supervising RPEQ or Principal Contractor
                       during construction, must be notified to council in writing within five business days of the
                       change occurring.
               5.      Any conflict between the development and an existing or proposed service must be referred
                       to the relevant service authority for determination prior to commencement of works.




                                                                                                      Page 4 of 9

Document Set ID: 25154969
Version: 3, Version Date: 10/09/2026

Used in these records

About this file

File size
577 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW26 0094 (As Published).pdf · 577 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.