Council archive · source document
Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 · OPW12/0054
bpj TO: SCRC ATT: Mark Lewis DATE: 1/3/2012 RE: Operational works application for 14 Park Rd, Noosa. Dear Mark, Please find the attached information to commence proceedings for the operational works permit for 14 Park Rd, Noosa. Please be advised that a traffic management plan will be provided within the next 7 - 10 working days to complete the process for the operational works. Can you please start the process for issuing the OP works permit pending the submission of the TMP? As per you discussions with my client Tim Biggs we are very keen for these works to commence ASAP. Can you please insure that all steps are taken to make this process as quick and seamless as possible? Please be advised of the following. • Warren Fraser was the contractor for walls to 10 & 12 Park Road • Engineers drawing is continuation of 12 Park Road • Warren Fraser is to construct the wall @ 14 Park Rd as per drawing/precedent. • An agreed fee of $785 only is to be paid to SCRC for Op Works. • Approx. time for construction is 10 working days. Kind Regards development Counter q 2AA^^ -1 MAR 2012 Wade Jenner Director Tewantin 0411470879 wade@a^bevienner.com.au Po box 173 Red hill, QLD 4059 Ph 3369 0500 Fax 3369 0700
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.