Council archive · source document
09/0982 - Concurrence Agency Response - Maritime Safety [As Published] · 142009.982
7. You must adequately light the structure. The contractor must position all lighting so it does not
cause a risk to the safe navigation of other vessels. Any freestanding piles must have retro-
reflective tape fitted.
8. You, or your agent, must remove any obstructions and debris encountered during construction,
and dispose of them, as the Harbour Master requires.
9. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.
10. The contractor must complete construction within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.
The above conditions must be included in your application to the assessment manager
Yours sincerely
4 Captain Richard C Johnson
Regional Harbour Master (Brisbane)
Maritime Safety Queensland Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0982 - Concurrence Agency Response - Maritime Safety [As Published]Related documentApplication case desk ↗
About this file
- File size
- 121 KB (small file)
- File type
No other editions are linked here.