Other Change Decision Notice - Council Meeting Decision 131998 981211 5

of 21

Page text shows just the words. Original shows the document exactly as it was published.

                        Building and Construction Industry (Portable Long Service Leave) Levy
                1.      The QLeave levy must be paid prior to the issue of a development permit where it is
                        required. Council will not be able to issue a Decision Notice without receipt of details
                        that the Levy has been paid.
                        Co-ordination of Operational Works Assessment
                2.      Additional application fees apply to Operational Work applications where the different
                        aspects of the works are lodged separately. Significant savings in application fees will
                        result if all works are lodged in a single application.
                        Preparation of a Preliminary Construction Management Plan
                3.      A preliminary Construction Management Plan must be submitted with the Operational
                        Works application and must address the following:
                        a.      traffic management during all aspects of the construction phase including:
                                i.      a Traffic Management Control Plan in accordance with the Manual of
                                        Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                                        and traffic control measures prior to construction;
                                ii.     maintenance of safe vehicle and pedestrian access for the areas affected by
                                        the works during and after daily construction has ceased;
                                iii.    proposed fencing to the site during the construction phase of the
                                        development;
                                iv.     approval of the Traffic Management Control Plan by the Department of
                                        Transport and Main Roads (DTMR) for any works on State controlled roads;
                                        and
                                v.      provision for worker car parking.
                        b.      maintenance and protection of water quality and existing drainage lines through
                                the construction site, through the implementation of appropriate erosion and
                                sediment control measures;
                        c.      works programme identifying key components of the works and their respective
                                durations;
                        d.      establishment of a communication protocol with the general public, adjoining
                                owners, emergency services and local businesses to advise of agreed
                                construction times, impacts on traffic, services and other relevant issues;
                        e.      Include a post out to the local residents and businesses advising of the proposed
                                development, the expected time frames and the site contact details;
                        f.      Include signage in prominent locations on the boundaries of the site advising of
                                the proposed development, the expected time frames and the site contact details;
                        g.      identification of complaint management procedures including:
                                i.      contact details for the on-site manager; and
                                ii.     dispute resolution procedures.
                        h.      it is acknowledged that the preliminary Construction Management Plan will be a
                                draft document requiring finalisation upon appointment of the Principal Contractor
                                employed to construct the works and a final document will be required to be
                                submitted at the Pre-Start Meeting for the project.




                                                                                                        Page 17 of 21
Document Set ID: 23418211
Version: 10, Version Date: 02/01/2025
Log in to download the original file

Other Change Decision Notice - Council Meeting Decision 131998 981211 5.pdf · 214 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.