planning statement - Bulk Earthworks · OPW19/0239
Attached to the e-mail Application for Operational works OPW19/0239 - bulk Earthworks 217 & 219 Gympie Terrace Noosavillle.
Council reference: MCU19/0030 & OPW19/0205 Our Reference: 02518 L09 NG Our Contact: Nadine Gorton 25th October 2019 Chief Executive Officer Noosa Council PO BOX 141 TEWANTIN Q 4565 ATTENTION: DEVELOPMENT ASSESSMENT Dear Sir/Madam, RE: LODGEMENT OF APPLICATION Development Application – Operational Works for Bulk Earthworks associated with Multiple Housing Type 4 Conventional (3 units) located at 217 & 219 Gympie Terrace, Noosaville described as Lot 1 on RP 66483 and Lot 1 on RP70165 Please find enclosed a development application for Operational Works which has been prepared in accordance with the Planning Act 2016 and lodged with your Council as the Assessment Manager of this application. This application for operational works is to be considered in association with MCU19/0030 for a Multiple Housing Type 4 Conventional (3 Units) and Operational Works 19/0205. On behalf of the applicant, Martoo Consulting have lodged an application for Operational Works (19/0205) for drainage works, earthworks, landscaping, roadworks and stormwater. Council has issued an information request for the Operational works application (dated 1 st October 2019) and the applicant is currently attending to the items raised in that request. Whilst these matters are being reviewed, the applicant wishes to proceed with the project and seeks approval to undertake bulk earthworks on the site and commence excavation of the basement and piling of the site. The applicant advises that: Works will commence as soon as possible following issue of the operational works for bulk earthworks. The estimated time frame for the earthworks and associated piling is 4 weeks. Hours of operation to be in accordance with relevant Earthworks Code. A comprehensive traffic management plan will be provided prior to the pre-start meeting. (Please note that contracts for the works have not been awarded so final details relating to management of the site are not able to provided at this stage). Haulage routes will be designed to minimise impacts on residential areas. Possible haulage routes may include Thomas Street and Gibson Road. The enclosed development application includes: Completed DA Form 1; Operational works plans prepared by SCG; Geotechnical and Acid Sulfate Soils Investigation and Acid Sulfate Soils Management Plan prepared by Core Consultants. Council fees will be paid electronically upon confirmation of Councils application number and payment link.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
Page 2 Please contact our Sunshine Coast office if you require any further information and/or clarification. Yours faithfully, Nadine Gorton Senior Planner martoo consulting pty. ltd
Used in these records
planning statement - Bulk Earthworks.pdfRelated documentApplication case desk ↗
About this file
- File size
- 269 KB (small file)
- File type
No other editions are linked here.