Skip to the record
The only place to find full transcripts.

Council archive · source document

Decision Notice - 010.2006.00002378.001 [As Published] · 152006.2378

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                             Officer:          Mark Lewis
                                             Direct Telephone: (07) 5449 5176
                                             Response Address: PO Box 141, Tewantin QLD 4565
                                             Email:            [email protected]
                                             Our Reference:    2006/2378
                                             Your Reference:
22 April 2008

John Jones & Jill P Jones
CARE PMM Sunshine Coast Pty Ltd
PO Box 149
WURTULLA QLD 4575




Dear Sir/Madam,

                                      Decision Notice
                                 Integrated Planning Act 1997

I refer to your application and advise that on 22 April 2008 Council decided to approve the
application, subject to conditions.
Details of the decision are as follows:

1     APPLICATION DETAILS

 Application No:                     2006/2378
 Street address:                     2 Goldburg Court NOOSAVILLE
 Real property description:          LOT: 2 RP: 223289
 Planning Scheme:                    The Noosa Plan/Superseded Planing Scheme (Schedule to the
                                     Planning Scheme & Strategic Plan 1997)

2     DECISION DETAILS
The following type of approval has been issued:
    Development Permit for Reconfiguring a Lot - 06/2378 Lot Reconfiguration (2 Lots)
3     RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Permit is 4 years (22 April 2012) from the date that this
development approval takes effect.

4     ASSESSMENT MANAGER CONDITIONS

1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plan is numbered 7396-02 by PMM Sunshine
      Coast Pty Ltd and dated 25 July 2006 and as may be amended by these conditions.
2.    Pursuant to Section 3.5.21(2)(b) of the Integrated Planning Act 1997, the relevant period is
      four (4) years from the day this permit takes effect during which time all conditions must have
      been complied with, operational works completed, and the Plan of Survey lodged with the
      Council for endorsement.


                                                                                                Page 1 of 20
Full text of the other 19 pages

Page 2

                                                 -2-



3.    In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
      documentation shall be presented to Council and shall be submitted in the correct form with
      the fees prescribed in Council's adopted fee schedule.
4.    Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and
      charges due and payable to Noosa Council in respect of the lots being reconfigured shall be
      paid prior to endorsement of the Plan of Survey.
Access
5.    Access to each lot shall be constructed to the standards and requirements of the Manager -
      Land Development.
6.    All vehicle access to proposed Lots 1 and 2 shall be via the Hollett Road frontage of the site.
      The vehicle access shall be designed and constructed in accordance with AS/NZS
      2890.1:2004.
      The vehicular access shall be constructed from edge of the bitumen in Hollett Road to the
      property boundary. The access shall be designed and constructed in accordance with
      Council’s Planning Scheme Policy PSP 5 Engineering Design Standards – Roads, Drainage
      and Earthworks and generally in accordance Council’s Standard drawing No 9014. A
      Development Permit for Operational Works shall be obtained prior to the commencement of
      any works.
7.    A 3.0 metre wide concrete or 4.0 metres bitumen sealed driveway shall be constructed for the
      full length of the battleaxe handle of Lot 2. The driveway shall be designed and constructed
      generally in accordance with Council’s Planning Scheme Policy PSP 5 Engineering Design
      Standards – Roads, Drainage and Earthworks and Council’s Standard drawing No 9013. A
      Development Permit for Operational Works shall be obtained prior to the commencement of
      any works.
      All service conduits shall be installed for the full length of the access strip prior to pavement
      construction.
8.    That part of the access driveway that will utilised by both proposed Lots 1 and 2 shall be
      constructed with a concrete or sealed surface with a minimum width of 5.5 metres or widened
      as required to allow vehicles to pass on the driveway.
9.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works, which shall be submitted in conjunction with an
      application for a Development Permit for Operational Works.
10.   Prior to commencement of work relating to a Development Permit for Operational Works, the
      Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
      pavement, footpath, or other Council property damaged as a result of construction of the
      proposed development.
      In all cases, Council reserves the right to carry out rectification works in an emergency and
      where no reasonable attempt has been made to complete the rectification works as part of the
      development.
      All costs incurred by Council in any rectification works shall be repaid to Council prior to the
      endorsement of the Plan of Survey.
11.   Prior to undertaking any excavation, the person acting on this permit shall contact public utility
      service providers to ascertain the location of their underground services.
12.   The person acting on this permit shall apply and obtain for all other necessary permits
      including crane permits, road opening permits, hoarding permits, footpath occupation permits
      and/or any other approvals required under any other Act.



                                                                                             Page 2 of 20

Page 3

                                                 -3-



13.   All redundant vehicular crossings to the site shall be removed and the areas reinstated in
      accordance with Council’s standard specifications prior to Council’s endorsement of the Plan
      of Survey.
Engineering Issues
14.   All designs for engineering works involving the construction of pavements, vehicular access,
      footpaths etc shall be prepared in accordance with Council’s Planning Scheme Policy PSP 5
      Engineering Design Standards – Roads, Drainage and Earthworks and shall reference where
      applicable to Council’s Standard Drawings and shall incorporate best engineering practice.
15.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works, which shall be submitted in conjunction with an
      application for a Development Permit for Operational Works.
16.   Prior to Council endorsing the Plan of Survey, a certificate from a registered Professional Civil
      Engineer shall be submitted to Council for each Development Permit for Operational Works
      issued pursuant to this permit. The engineer shall certify that he has supervised those works
      and that they have been completed in a workman like manner in accordance with good
      engineering practice and in accordance with that permit.
Easements
17.   The access easement to proposed Lot 1 shall be a minimum of 10.0 metres wide with the
      width being increased where necessary to accommodate passing lanes and services or to
      provide the specified clearances from cut/fill batters.
18.   Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required
      Grant of Easement shall be submitted to Council for perusal.
      Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of
      Survey.
      Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to
      the endorsing of the Plan of Survey.
19.   Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's
      Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the Plan of
      Survey at the Land Titles Office, the Title Deed and the easement documents will also be
      lodged and any additional Titles Office forms or requisitions requiring the consent of Council
      being attended to forthwith.
Effluent Disposal
20.   All septic and sullage wastes shall be disposed of on site to the reasonable satisfaction of the
      Manager - Building Services. Plans prepared by a registered Consulting Civil Engineer are to
      be submitted to and approved by Council's Manager - Building Services, prior to the issue of a
      Development Permit for Building Works.
21.   The applicant shall submit an Effluent Disposal report for proposed Lot 1 for approval prior to
      Council’s endorsement of the Plan of Survey. The report shall be prepared by a suitably
      qualified geotechnical engineer and shall make recommendations on the treatment system
      and application areas required to dispose of effluent for a typical residential use. The design of
      the on-site effluent disposal system and disposal area (land application area) shall be in
      accordance with Council’s Planning Scheme Policy PSP24 - Effluent Disposal.
      Please note the land application area shall be positioned to achieve the greatest possible
      setback to any permanent or intermittent watercourse and at least 15m from any underground
      rainwater tanks.




                                                                                             Page 3 of 20

Page 4

                                                 -4-



Vegetation Protection and Weed Removal
22.   Existing trees on site and within the road reserve are to be retained, except where required to
      be removed due to a building approval or the conduct of an approved use. Driveways and
      buildings sites should be designed to avoid the removal of native vegetation.
23.   All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
      Stock Route Management) Act 2002 and including all Camphor Laurel trees on the property
      are to be controlled on the site prior to Council endorsement of the Plan of Survey. In this
      context “controlled” shall mean, for class 1 and 2 pests, completely eradicated. For class 3
      pests it shall mean removal of the plants where they threaten environmentally significant areas
      of the site such as riparian zones and areas of natural vegetation.
      Where class 3 plants are removed as a result of this condition and there is not sufficient
      natural regeneration of native species, the areas shall be replanted with endemic native
      species so that a sustainable natural ecosystem is restored.
      Council’s Conservation Management Supervisor will not inspect the site until 30 days after the
      weed treatment and replanting is complete.
24.   If there is any cleared vegetation it shall be suitably processed by one of the following
      methods and removed from the site:-
      24.1.    Processing through a wood chipper or shredder. The resulting mulch is to be
               stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
               with a minimum of 10 metres between edges of heaps.
      24.2.    Disposal for firewood.
      24.3.    Disposal for landscaping purposes.
      24.4.    Transport to alternative site for breaking down materials provided that all necessary
               permits have been obtained to allow the alternate site to be used for this purpose.
      The disposal method for clearing works is to be submitted in conjunction with an application
      for a Development Permit for Operational Work. The Applicant is advised that other methods
      may be considered provided full details of the method are submitted.
      The Applicant is also advised that burning off is an unacceptable method of disposal.
Services
25.   Any alteration of a public utility or other facility necessitated by the development of the land or
      associated construction works either internal or external to the site shall be at no cost to
      Council.
Power Supply
26.   An electricity service shall be provided to both lots unless already provided. The service shall
      be provided overhead within Hollett Road to a property pole located adjacent to Hollett Road
      within the relevant lot. The service shall then be provided underground within the property to
      the house site.
      In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
      with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
      The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
      approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
      Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
      prior to Council endorsing the Plan of Survey.
      Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
      be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
      purchasers of the proposed lots.


                                                                                              Page 4 of 20

Page 5

                                                 -5-



Telecommunication
27.   The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
      provision of new telephone services to the proposed lots. In this regard written confirmation
      from an approved telecommunication agency shall be submitted to the Council prior to Council
      endorsing the Plan of Survey.
Stormwater
28.   Stormwater is to be disposed of on site so as to cause no scour or damage to subject site or
      adjoining properties to the reasonable satisfaction of the Manager - Land Development.
Contributions Towards Council Infrastructure
29.   Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
      only of the contribution amounts under the current Council policies and requirements is
      outlined in the table below:

         Contribution Required For:                                                   Amount:
         PSP12 – Public Open Space Contributions (Park)                               $1,350
         TOTAL Contribution Amount =                                                  $1,350
         Please note, that these amounts are all subject to variations in the Consumer Price Index, All
         Groups Brisbane from December 2007 until the date of payment.

      All contributions must be paid prior to the issue of a Development Permit for Operational
      Works.
      In the event that this Development Permit lapses or is cancelled, the paid contributions will be
      refunded.
Survey
30.   Prior to endorsement of the Plan of Survey, a State Survey Mark shall be provided within or
      adjacent to the site. It shall be levelled and located to the requirements of the Manager - Land
      Development. A ‘Form 6’ shall be submitted for Council's records.
      Each State or other Permanent Survey Mark shall be installed clear of overhead vegetation,
      making it suitable for Global Positioning Equipment, and accurately connected to at least one
      real property corner by a registered Surveyor.
General
31.   For the following classes of work associated with development, a Development Permit for
      Operational Works must be obtained prior to commencement of works relating to that class of
      work. The application may combine any or all of these classes of work: -
      31.1.    Access
      31.2.    Erosion and Sediment Control
32.   The person acting on this permit shall apply and obtain for all other necessary permits
      including crane permits, road opening permits, hoarding permits, footpath occupation permits
      and/or any other approvals required under any other Act.
33.   The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
34.   The requirements of this development approval are to be effected, prior to the transfer of
      ownership of any of the new lots. Council reserves the right to call upon the bond or
      guaranteed sum referred to in this approval to effect compliance with conditions.
                                                                                             Page 5 of 20

Page 6

                                                    -6-



35.     The Assessment Manager for building work shall ensure that all other permits required by this
        permit have been obtained and outcomes from imposed conditions incorporated into the
        building plans prior to issue of a Development Permit for Building Works.
Security
36.     Prior to commencement of any operational works arising out of this permit, security in the sum
        of $4,000 must be lodged with Noosa Council, to secure performance of all conditions of this
        permit. The security shall be in the form of cash or unconditional trading bank guarantee
        acceptable to the Manager - Land Development.
        The security will be returned upon satisfactory performance of all the conditions of this permit
        and any other related development permits for operational works, less any costs incurred by
        Council in ensuring compliance with these conditions or for any additional inspections incurred
        for substandard work or work undertaken not in accordance with this permit.

5       REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger        Referral Status        Referral Agency            Referral Address

                         Concurrence            Environmental Protection   PO Box 15155
                                                Agency                     CITY EAST QLD 4002

                         Concurrence            Department of Natural      PO Box 573
                                                Resources, Mines &
                                                                           NAMBOUR QLD 4560
                                                Water
A copy of any referral agency conditions is attached.

6       APPROVED PLANS
The approved plans for this development approval are listed in the following table:
 Plan No.                   Rev.     Plan Name                                  Date

 7396                       02       Proposed Reconfiguration                   25 July 2006
                                     PMM Sunshine Coast Pty Ltd

7       ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.      The applicant is advised that development contributions and infrastructure charges applicable
        to this development approval have been based on the following Uses Class/ Uses and
        applicable quantities:-

                    Existing Development                            Approved Development
           Existing Use Class                               Approved Use Class          Approved
                                    Existing Quantity
                  / Use                                           / Use                 Quantity
         Detached House            1 Dwelling               Detached House         2 Dwellings




                                                                                               Page 6 of 20

Page 7

                                                  -7-



2.    The applicant is informed that approval of this development application will trigger an
      Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
      Charges Plan for the estimated amount of $2,818 and is subject to variations in the Consumer
      Price Index, All Groups Brisbane from December 2007 until the date of payment. An
      Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
      Planning Act 1997.
3.    A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
      Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
4.    A Registered Professional Civil Engineer means an engineer who is registered with the
      Board of Professional Engineers of Queensland.
5.    The person acting on this permit means any person or company who undertakes
      development pursuant to this permit.
6.    AS/NZS 2890.1 – 2004 means Australian Standard for Off Street Carparking – AS/NZS
      2890.1-2004.
7.    Principal Contractor means the person nominated by the Applicant and approved by the
      Manager - Land Development at a pre-start meeting as being responsible for the major
      component of works associated with a Development Permit for Operational Works of any
      works on the site.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES
The following property notes will be placed against the subject property in Council’s property record
system:
“The property is in an unsewered area. Effluent shall be disposed of on-site in accordance with
Council’s policy for on-site wastewater disposal current at the time of Building Works. A detailed site
assessment and effluent land application design will be required to be submitted to Council at the
time of an application for a Development Permit for Building Works or modifications to the effluent
disposal system.”

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not Applicable.




                                                                                                Page 7 of 20

Page 8

                                                -8-



10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required         Subject of the required Development Permit
 Operational Works                           Access; Erosion and Sediment Control

11     SELF ASSESSABLE CODES

The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not Applicable.
12     SUBMISSIONS

Not Applicable.

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.

14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS

Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully,




Mark Lewis
SENIOR DEVELOPMENT ASSESSMENT OFFICER




                                                                                          Page 8 of 20

Page 9

       -9-




Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                                 Page 9 of 20


[OCR of page images]
 

 

Sunshine Coast | Referral Agency Conditions

INTEGRATED PLANNING ACT 1997 & 1998 REGULATION

 

 

+ Concurrence Agency Response
This notice is issued by the Environmental Protection Agency
Planning Act 1997 to advise of a decision OF action,

pursuant to Sections 3.3.16 and 3.3.18 of the Integrated

Noosa Shire Council

 

ci dane Davissen ~ ce: Mr airs vohn and Jill Jones
PO Box 141 ~ erine Carter
TEWANTIN PMM Group Pty Ltd
QLD 4665 : PO Box 149
2 corsa. _WURTULLA QLD 4575

3
Our reference: 307635

Dear Ms Davissen
Re: Referral for Concurrence Agency Response

The Environmental Protection Agency (EPA) wishes to advise that the referral for a concurrence agency
response relating to the Nature Conservation (Koala) Conservation Plan 2006 and Management Program
2006-2016, received on 13-NOV-2006, has been assessed and decided on 6-FEB-2008.

1. Property/Location:

Street Address - Goldburg Court NOOSAVILLE QLD 4566
Lot/Plan - Lot 2 on Plan RP223289

2. Details of the Recommendation

Aspect of Development

Concurrence Response for Development in a Koala Habitat Area
Reconfiguring a lot in a Koala Conservation Area that will result in an increased number of lots

Recommendation

Approve in full with Conditions

 

Page 1 of 5 AFO80109
Queenstand Government
: ‘Environmental Protection Agency
Environmental Protection Agency Queensland Parks and Wildlife Service
www.epa.qid.gov.au ABN 87 221 158 786

Page 9 of 20

Page 10

- 10 -




         Page 10 of 20


[OCR of page images]
-10-

 

 

-ecoaccess

environmental licences and permits Notice ©
Concurrence Agency Response

3. The Approved Plans

The approved plans and/or documents for this approval are:
Plan/Document Name Date
25-JUL-2006

 

Plan/Document No.
7396-02

 

   
 

‘Proposed Reconfiguration

 
 

 

Proposed Lots 1&2

 

 

 

 

4. EPA Concurrence Conditions of Approval

sion notice which pertain to fulfilling the
The following conditions are to be placed on the final decision Meee ondervaton Area.
nnn nisiramante of the Koala Pian for committed development in et '

Retention of Koala Habitat Trees

 

1. Koala habitat trees of 4 meters in height or greater, or with a trunk diameter of 10 centimetres or greater *
at 1.3 meters above the ground are to be retained within the proposed Lot 1 and Lot 2 (currently
described as Lot 2 on Plan RP223289). .

Building Envelope
2. All future dwellings and associated housing amenities constructed within the proposed Lot 1 are to be

contained within the designated building envelope as shown within the Proposed Reconfiguration
Drawing Plan No. 7396-02.

Fencing

3. Any new boundary fencing to be erected on the proposed Lot 7 and Lot 2 are to be koala friendly to
allow for koala movement across the site,

4. Domestic dogs which are housed on the proposed Lot 4 or Lot 2 are to be secured to an area around
the dwelling, or contained within the building envelope by way of koala exclusion fencing.

t , co
Please refer to the definition of koala friendly fencing and koala exclusion fencing attached to this
approval.

Fire Management

5. Any bushfire management activities undertaken within the proposed Lot 4 or Lot 2, including clearing
for asset protection zones, fire breaks and controlled burning must be undertaken in a manner which
minimises degradation to koala habitat.

 

Page 2of5+AFO80109 Environmental Protection Agency

Page 10 of 20

Page 11

- 11 -




         Page 11 of 20


[OCR of page images]
-11-

 

 

Landscaping

6.

Rehabilitation of Koala Sustainability Area

oaccess

environmental licences and permits

Notice:
Concurrence Agency Response

At least 70% of any future landscaping within the , i i
; ; Proposed lots are to consist of Australian native:
50% of which are to be native to the local area and include koala habitat trees species derived from

local seed stock. Thi i isi es - Ges
condition 8. is requirement is in addition to that specified for rehabilitation of the site in

Any landscaping to be placed either side of the drivewa’ t
ys are to be setback at least 1 met
edge of the pavement to ensure greater visibility of koalas attempting to cross the road. re from the

 

 

8. ‘ehabilitation of koala habitat must be undertaken in accordance with the following requirements:

a.’ rehabilitation will be i 2 ani :

enhante thé ort be im, lemented v Nf inthe oroposed Lot 2 to__

b. _re-planting is to be conducted within an area located on the eastern side of the proposed Lot
2 and within the Riparian Buffer Area as shown within the Proposed Reconfiguration Plan
Drawing No. 7396-02; .

c. 150 canopy stems and 300 understorey and groundcover species are to be planted across
the 600m’ area in a way that is consistent with the density, composition, and distribution of
the surrounding regional ecosystems 12.3.5 and 12.3.13; ’

d. all koala habitat tree species planted are to be derived from local seed stock;

@. in addition to the re-planting within the Riparian Buffer Area, the existing riparian vegetation
within proposed Lot 2 is to be actively managed to limit weeds and soil erosion.

f. the land holder shall ensure that natural regeneration of the riparian vegetation is allowed to
occur by restricting access to domestic grazing animals; and

g. suitable protective measures (e.g. fencing) are required to be installed around the
rehabilitation area (s) at the time of planting and remain in place until the maintenance
period has finished. Please refer to condition 9 for maintenance requirements.

9. Rehabilitation is to be completed within one (1) year of the date the reconfiguration approval is issued

. by Noosa Shire Council. : .

40. Maintenance of the completed rehabilitation is to be undertaken over a period of two (2) years,
commencing from the date revegetation is completed. Maintenance actions are to address the
following:

i. soil erosion; stabilisation of soil structure;
replacement of dead tree plantings;
tegular watering, taking into consideration current water restrictions; and
weed incursion; removal and management of noxious plant and environmental weed
species.
o Page 3 of 5 * AF080109 : . Environmental Protection Agency

Page 11 of 20

Page 12

- 12 -




         Page 12 of 20


[OCR of page images]
-12-

 

 

ecoaccess

environmental licences and permits

Notice
Concurrence Agency Response

Construction in a Koala Habitat Area

Gonstruction in a hoala haa

41. Building and construction activities on the proposed Lot 1 and Lot 2 must be limited to the hours
between 6am and 6pm.

i i i identified and the driving and parking of
truction, koala habitat trees must be clearly identifie n
2 votes 28 well as stockpiling of soil and other materials, must be carried out away from the root zone

of those trees.

ite i thi i future clearing of koala
opment site is located within a Koala Conservation Area, any ;
® pit tees must be undertaken in accordance with sections 15 and 16 of the Nature Conservation

(Koala) Conservation Plan 2006.
5 . ts or any other person
it t all employees, contractors, subcontractors, agen’ f
“ Fee eet cer ioved w cay out building works under this Development ven mt comply at al times
i it anc is not approvi
_--~with.the requirements of this Development Permit ard do not ea ony ee aie

45. The applicant‘shall notify the Project Officer, Koala Conservation Unit via email at
[email protected] or telephone EPA Customer Service Centre (07) 3227 8185, at teast 2
business days prior to the commencement of any native vegetation clearing on the site, of the date
clearing is to commence and the koala spotter to be used.

16. Dogs are prohibited from the site at all times during construction, other than domestic dogs that reside
within the existing residence on Lot 2. The applicant shall ensure that all employees, contractors,

subcontractors, agents or any other person engaged or employed on the site are aware of this
requirement.

Definitions

“Koala habitat trees” are defined in the Nature Conservation (Koala) Conservation Plan 2006. They
include tree species of the Angophora, Corymbia, Eucalyptus, Lophostemon and Melaleuca genera.

“Koala exclusion fencing” means a fence that is made of materials that a koala cannot easily grip,
including, for example tin panels and has a gap of less than 10cm between the ground and appropriate
fencing material. Nearby trees and shrubs should be at least 3m away from the exclusion fencing.

“Koala friendly fencing” is defined as a fence that: .

a. allows koalas to easily climb through or over the fence by choosing materials such as post and rail and
leaving at least a 30cm gap between ground level and the first rail or strand; or

6. provide a means for koalas to get over a fence that cannot be easily climbed by:

i. installing a timber post leaning against the fence at a 45 degree angle on either side;

planting vegetation within close proximity on either side of the fence to provide a natural ladder;

iii. instalting planks or panels horizontally along the top of the fence to provide a walkway; and

iv. _ building the fence around existing trees and vegetation.

 

Advice to Council

Koalas that are identified on the site during construction are not to be captured and relocated. Translocation
is prohibited under the Nature Conservation Act 1992. A tree in which a koala is present and any adjacent
trees are not to be cleared until the koala has moved from the site of its own volition. A koala spotter must

be present during any clearing of koala habitat trees on the site and present along side each machine
clearing native vegetation.

 

Page 4 of 5 » AFO80109 Environmental Protection Agency

Page 12 of 20

Page 13

- 13 -




         Page 13 of 20


[OCR of page images]
-13-

 

wat

~ecoaccess ~~ —

 

 

environmental ficences and permits
Notice
Concurrence Agency Response

Should a koala be found sick or injured the fauna spotter must either take it to the nearest treatment facility
or contact QPWS hotline on 1300 130 372.

’

EPA recommends that a Notation on the proposed allotments should be made which alerts potential
landowners when conducting a property search to the development conditions on the property, in particular,

relating to designated building envelopes, bushfire management requirements, dog restrictions, koala
habitat values and vegetation retention.

Itis also recommended Noosa Shire Council place a Vegetation Protection Order (VPO) over the areas
rehabilitated as a result of this approval to ensure that the improved koala habitat is protected from
inappropriate clearing activities which may occur in the future.

5. Assessment Manager Responsibilities

Please note that itis a requirement under Sections 3.5.15 and 3.5.17 of the Intanrated PI lapning. Act.to07
that a copy of the final Decision Notice (which includes the EPA’s concurrence response) for this application
issued by the Noosa Shire Council, be forwarded to each referral agency. Therefore could you please send
a signed hardcopy to the EPA's Ecoaccess Customer Service Unit, PO Box 15155 CiTY EAST 4002 and an
electronic copy to [email protected] addition, the State’s Native Title Work Procedures indicate that responsibility for assessment of native title
issues for an IDAS application rest with the Assessment Manager. Therefore in this instance, the EPA has
not provided a notification to native title parties.

If you require more information, please contact Melissa Prosper, via email or the telephone number listed
below.

Yours sincerely

Mark Gough Enquiries:
A/Manager Wildlife Conservation Branch
Sustainable Communities Division Level 8, 160 Ann Street
Environmental Protection Agency CITY EAST QLD 4002
sow ft . . Phone: (07) 3234 0101 :
6-FEB-2008 Fax: (07) 3227 6386 -

Email:[email protected]

 

Page 5 of 5 « AF080109 Environmental Protection Agency

Page 13 of 20

Page 14

- 14 -




         Page 14 of 20


[OCR of page images]
-14-

 

Author Caroline Plank

Council Reference 2006/2378

Client Reference 7396 .
NRW Reference —1C1106NAM0008_NOO7643
Directorate / Unit Planning & Development
Phone 07 6451 2408

20 February 2008
Chief Executive Officer
Noosa Shire Council
PO Box 141

Tewantin QLD 4565

Attention Jane Davissen

Dear Sir/Madam

Queensland
YS Government

Department of

Natural Resources and Water

 

APPLICATION FOR RECONFIGURING A LOT ON LOT 2 RP223289 (GOLDBURG

COURT, NOOSAVILLE) - REFERRAL AGENCY RESPONSE

The Chief Executive of the Department of Natural Resources and Water (NRW) advises
that the Referral Agency Response for the application—prepared pursuant to section 3.3.16
of the Integrated Planning Act 1997—is enclosed. A copy of the Referral Agency

Response has been sent to the applicant.

NRW looks forward to receiving a copy of the Decision Notice for the application in due

course.

Should you have any questions about this matter please contact Ms Caroline Plank on

(07) 5451 2408, quoting the reference number IC1106NAMO0008.

Yours sincerely
KF
Jeff Guinea

Senior Officer (Planning & Environment)
South East Region

Att: Referral Agency Response

Department of Natural
Resources & Water

Centenary Square Building,
Currie Street, Nambour. Q 4560
PO Box 573, Nambour. Q 4560
Telephone + 61 7 5451 2222
Facsimile + 61 7 5451 2260
Website www.nrw.qid.gov.au
ABN 83 705 539 586

Page 14 of 20

Page 15

- 15 -




         Page 15 of 20


[OCR of page images]
-15-

 

Jt

 

Referral Agency Response
8 3.3.16 Integrated Planning Act 1997

1. Application information

1.2 Applicant’s name John & Jill Jones C/- PMM
1.3. Property description Lot 2 RP223289
1.4 Assessment Manager/Reference Noosa Council 2006/2378

1.5 Departmental Reference eLVAS Case No: 2006/012873
File Ref. No: NOO7643
Trackjob No: IC1106NAM0008

16 Type of development sought by the application Reconfiguring a Lot

. Concurrence Agency Matters

Vegetation Management Act 1999

The chief executive of NRW directs the assessment manager to include the following
conditions in any development approval given for the application—

2.1 No clearing as a result of reconfiguring Lot 2 on RP223289 is to occur within
the area shown as Area A (A1) on the attached Referral Agency Response
(Vegetation) Plan that has the reference “RARP2006/012873", unless the
clearing is specified in Schedule 8 of the /ntegrated Planning Act 1997 (Qld).

2.2 No infrastructure—including, but not limited to buildings, roads and fences—is

: to be established or located within the area shown as Area A (A1) on the
attached Referral Agency Response (Vegetation) Plan that has the reference
“RARP2006/012873".

2.3. No allotment boundaries are to be located or established within the area show
as Area A (A1) on the attached Referral Agency Response (Vegetation) Plan
that has the reference “RARP2006/012873”.

2.4 No infrastructure—except for fences, roads and underground services—is to
be established or located within the area shown as Area B (B1) on the
attached Referral Agency Response (Vegetation) Plan that has the reference
“RARP2006/012873".

Definitions -
Underlined terms have been defined—see Schedule A — Glossary.

Reasons for the concurrence agency response

.NRW has assessed the application against the Concurrence Agency Policy for

Reconfiguring a Lot (RaL) 27 June 2005 (Ral Policy) and has determined that the
application meets the requirements of Part C of the Ral Policy, because clearing as
a result of the RaL will not occur within assessable vegetation.

The chief executive of NRW has directed the assessment manager to include
conditions in any development approval given for the application to ensure that:

. clearing as a result of the RaL does not occur within assessable vegetation
. the application remains consistent with the Ral Policy.

. Third Party Matters

i
The Chief Executive of the Department of Natural Resources and Water provides the
following advice to assist the Assessment Manager to fully consider the application.

Page 15 of 20

Page 16

- 16 -




         Page 16 of 20


[OCR of page images]
-16-

 

 

Aboriginal Cultural Heritage Act 2003

NRW also takes this opportunity to advise Council of the responsibilities of applicants
under the Aboriginal Cultural Heritage Act 2003. Council may wish to include this
information as an Advisory Note on the Decision Notice issued for the application.

Under section 23 of the Aboriginal Cultural Heritage Act 2003 a person who carries
out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage (the “cultural heritage duty of
care’). Maximum penalties for breaching the duty of care are $750,000 for a
corporation and $75,000 for an individual.

Applicants will comply with the duty of care in relation to Aboriginal cultural heritage if
they are acting in accordance with cultural heritage duty of care guidelines gazetted
under the Aboriginal Cultural Heritage Act 2003, available on the NRW website, or in
accordance with an agreement with the Aboriginal party for the area or a cultural
heritage management plan approved under part 7 of the Aboriginal Cultural Heritage
Act 2003.

Applicants are also encouraged to undertake a search of the Aboriginal Cultural
Heritage Database and the Aboriginal Cultural Heritage Register, administered by the
Cultural Heritage Coordination Unit, Department of Natural Resources and Water.
Application forms to undertake a free search of the Cultural Heritage Register and
the Database may be obtained by contacting the Cultural Heritage Coordination Unit
on (07) 3238 3838 or on the NRW website www.nrw.aid.gov.au/cultural_heritage.

. Authorised Delegate Signature

Oia p -

Jeff Guinea

Senior Officer (Planning & Environment)
South East Region

20 February 2008

Attachment 1 Schedule A — Glossary

The Department of Natural Resources and Water IC1106NAMO008 20f3 -

Page 16 of 20

Page 17

- 17 -




         Page 17 of 20


[OCR of page images]
-17-

 

 

Schedule A — Glossary

Clearing as a result of reconfiguring includes:
e clearing of assessable vegetation that will result from reconfiguration of the
lot(s), consisting of any of the following

And

clearing for boundary fence lines for each proposed allotment (whether or
nat the clearing is proposed as part of the application)

clearing for infrastructure—including stormwater management systems,
water supply and sewerage systems—roads, access routes or utilities
corridors that are proposed as part of the RaL application or that will be
required as a condition of approval by the assessment manager

clearing for excavation and filling—for example, where the lots are to be
levelled.

* clearing of assessable vegetation that will become exempt if the development -
application is approved. This includes any of the following examples

clearing for a single residence and reasonably associated buildings and

structures for each allotment to be created as a result of the RaL, where

no such dwelling house already exists on the proposed allotment

alt lots will be assessed as including clearing of 2 ha for of the purpose

stated in (b)(i), or for lots smaller than 2 ha the whole area of the lot,

unless the application demonstrates that a greater or smaller area will be

required and achieved—for example, building envelopes binding on title

clearing for routine management and essential management purposes

associated with the approved development including clearing to maintain

proposed infrastructure, facilities, roads, access routes, utilities, services

and fences, and clearing to maintain the safety of persons and property

that will be associated with the development

clearing for necessary fire breaks and fire management lines associated

with the development. This will be assessed as follows

i. all built infrastructure other than underground services, roads and
fences will be assessed as requiring clearing for firebreaks with a
width of 1.5 times the height of the tallest vegetation_adjacent to the
infrastructure, or 20m, whichever is the greater. However, evidence
may be provided to NRW that confirms that an alternative firebreak
width is required that is consistent with the State Planning Policy
(SPP) 1/03 Guideline
ii.. all proposed allotment boundaries will be assessed as requiring
clearing for fire management lines with a width of 10m constructed
on either side of the allotment boundary, unless NRW is provided
with evidence that confirms that an alternative width of fire
management line is required or an alternative configuration of fire
management lines are required that is consistent with the SPP 1/03
Guideline
iii. in the case of evidence being presented that demonstrates

alternative fire management guidelines as being sufficient and
consistent with the SPP 1/03, NRW may condition the development
so that the full extent of exempt clearing prescribed for essential
management under Schedule 8 of the IPA cannot be carried out by
current or future landholders.

The Department of Natural Resources and Water IC1106NAM0008 3of3

Page 18

- 18 -




         Page 18 of 20


[OCR of page images]
-18-

 

 

Derived Reference Points for GPS

 

 

 

 

 

 

 

 

= nes sp oe =
Scale 1:2,000 @ A3 paper size Note: GPS reference points are to be used for 7#e property boundaries shown on this plan are
80

 

 

 

 

 

24 PP Feet our memory, presenta ofthe lege bouts.
Projection: UTM (MGA Zone 56) Datum: GDA94 Tandelger and delogeed contains). Note. Rofertal Agoney Pee a soon Oe,
LEGEND |
| Derived Reference Points for GPS Referral Agency Response (Vegetation) Plan 7 &
CX Subject Lots) - January 2008 Plan of Area A and Area B in Lot 2 on RP223289 Queensiand
LA secre Respores ISDST e808 “ae

Trackjob No. IC14 06NAMOCO8
‘Area 8 - Specific conditions apply - see Referral

 

 

 

 

 

 

es) CENTRE: GYMPIE REGION: SOUTH EAST
Agency Response 2008/012873 fordelais | OC aLiry OF NOOSAVILLE LOCAL GOVERNMENT: NOOSA SHIRE RARP 2006/012872
Map Reference: 9545, For compilation of date sources see GYVAN006S7/GIS- fa 1 1 A
Sheet 1 of 1 Sheet
File Reference: GYVi000657 Prepared by: LMO- Date: 25 January 2008 t

 

 

 

 

 

 

 

 

 

Page 18 of 20

Page 19

                                                        - 19 -




                                              Appeal Rights
                                             INTEGRATED PLANNING ACT 1997 & 1998 REGULATION


                                                                     (5) If an application is processed under section
The following is an extract from the Integrated                  6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4).                                        application are available only for the aspects of the
                                                                 development that would have required public
Division 8 - Appeals to court relating to
                                                                 notification under the repealed Act.
development applications
Appeals by applicants                                                (6) If an application involves assessment
4.1.27.(1) An applicant for a development                        against a concurrence agency code, appeal rights
application may appeal to the court against any of               for submitters for the application are not available
the following-                                                   against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a                    concurrence agency’s response for the code.
    development application;                                     Appeals by advice agency submitters
(b) a matter stated in a development approval,                   4.1.29.(1) An advice agency may, within the limits
    including any condition applying to the                      of its jurisdiction, appeal to the court about the
    development, and the identification of a code                giving of a development approval for a
                         1
    under section 3.1.6;                                         development application if-
(c) the decision to give a preliminary approval                  (a) the development application involves impact
    when a development permit was applied for;                       assessment; and
(d) the length of a currency period;                             (b) the advice agency told the applicant and the
(e) a deemed refusal.                                                assessment manager to treat its response to
                                                                     the application as a submission for an appeal.
    (2) An appeal under subsection (1)(a) to (d)
must be started within 20 business days (the                         (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the                   business days after the day the decision notice or
decision notice or negotiated decision notice is                 negotiated decision notice is given to the advice
given to the applicant.                                          agency as a submitter.
    (3) An appeal under subsection (1)(e) may be                 Appeals for matters arising after approval given
started at any time after the last day a decision on             (co-respondents)
the matter should have been made.                                4.1.30.(1) For a development approval given for a
Appeals by submitters                                            development application, a person to whom any of
                                                                 the following notices have been given may appeal
4.1.28.(1) A submitter for a development
                                                                 to the court against the decision in the notice-
application may appeal to the court about-
                                                                 (a) a notice giving a decision on a request for
(a) the giving of a development approval, including
                                                                     extension of the currency period for an
    any conditions (or lack of conditions) or other
                                                                     approval;
    provisions of the approval; or
                                                                 (b) a notice giving a decision on a request to make
(b) the length of a currency period for the approval.
                                                                     a minor change to an approval.
    (2) The appeal must be started within 20
                                                                     (2) The appeal must be started within 20
business days (the “submitters appeal period”)
                                                                         business days after the day the notice of the
after the day the decision notice or negotiated
                                                                         decision is given to the person.
decision notice is given to the submitter.
                                                                     (3) Subsection (1)(a) does not apply if the
    (3) If a person withdraws a submission before
                                                                         approval resulted from a development
the application is decided, the person may not
                                                                         application (superseded planning scheme)
appeal the decision.
                                                                         that was assessed as if it were an
    (4) If an application involves both impact                           application under a superseded planning
assessment and code assessment, appeal rights                            scheme.
for submitters are available only for the part of the
                                                                     (4) Also, a person who has made a request
application involving impact assessment.
                                                                         mentioned in subsection (1) may appeal to
                                                                         the court against a deemed refusal of the
                                                                         request.

1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                         Page 19 of 20

Page 20

                                                        - 20 -



    (5) An appeal under subsection (4) may be                        (2) The appeal must be started within 20
        started at any time after the last day the               business days after the day notice of the decision
        decision on the matter should have been                  is given to the applicant.
        made.                                                    For Building Works Only
Division 9 - Appeals to court about other                        Rights of appeal conferred by Section 4.2.9 of the
matters                                                          Integrated Planning Act 1997 as follows:
Appeals for matters arising after approval given                 Division 3 – Appeals to tribunals relating to
(no co-respondents)                                              development applications
4.1.31.(1) A person to whom any of the following                 Appeals by applicants
notices have been given may appeal to the court
                                                                 4.2.9(1) An applicant for a development application
against the decision in the notice-
                                                                 may appeal to the Building and Development
(a) a notice giving a decision on a request to                   Tribunal against any of the following-
    change or cancel a condition of a development
    approval.                                                    (a) the refusal, or the refusal in part, of a
                                    2                                development application;
(b) a notice under section 6.1.44 giving a decision
    to change or cancel a condition of a                         (b) a matter stated in a development approval,
    development approval.                                            including any condition applying to the
                                                                     development, and the identification of a code
    (2) The appeal must be started within 20                         under section 3.1.6;
                                                                                           3
        business days after the day the notice of the
        decision is given to the person.                         (c) the decision to give a preliminary approval when a
                                                                       development permit was applied for;
    (3) Also, a person who has made a request
                                                                 (d) the length of a period mentioned in section 3.5.21
        mentioned in subsection (1)(a) may appeal
                                                                       currency period;
        to the court against a deemed refusal of the
        request.                                                 (e) a deemed refusal.
    (4) An appeal under subsection (3) may be                       (2) An appeal under subsection (1)(a) to (d) must
        started at any time after the last day the               be started within 20 business days (the “applicant’s
                                                                 appeal period”) after the day the decision notice or
        decision on the matter should have been
                                                                 negotiated decision notice is given to the applicant.
        made.
                                                                     (3) An appeal under subsection (1)(e) may be
Appeals against decisions to change approval                     started at any time after the last day a decision on the
conditions under the repealed Act                                matter should have been made.
4.1.33A.(1) A person who is dissatisfied with a                  The Registrar for the Building and Development
decision made on an application to change the                    Tribunal may be contacted at the website
conditions attached to an approval given under                   http://www.localgovernment.qld.gov.au/
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.




2
     Section 6.1.44 (Conditions may be changed or
                                                                 3
    cancelled by assessment manager or concurrence                    Section 3.1.6 (Preliminary approval may override
    agency in certain circumstances)                                 local planning instrument)
                                                                                                             Page 20 of 20

Used in these records

About this file

File size
599 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2006.00002378.001 [As Published].pdf · 599 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.