-11-
Landscaping
6.
Rehabilitation of Koala Sustainability Area
oaccess
environmental licences and permits
Notice:
Concurrence Agency Response
At least 70% of any future landscaping within the , i i
; ; Proposed lots are to consist of Australian native:
50% of which are to be native to the local area and include koala habitat trees species derived from
local seed stock. Thi i isi es - Ges
condition 8. is requirement is in addition to that specified for rehabilitation of the site in
Any landscaping to be placed either side of the drivewa’ t
ys are to be setback at least 1 met
edge of the pavement to ensure greater visibility of koalas attempting to cross the road. re from the
8. ‘ehabilitation of koala habitat must be undertaken in accordance with the following requirements:
a.’ rehabilitation will be i 2 ani :
enhante thé ort be im, lemented v Nf inthe oroposed Lot 2 to__
b. _re-planting is to be conducted within an area located on the eastern side of the proposed Lot
2 and within the Riparian Buffer Area as shown within the Proposed Reconfiguration Plan
Drawing No. 7396-02; .
c. 150 canopy stems and 300 understorey and groundcover species are to be planted across
the 600m’ area in a way that is consistent with the density, composition, and distribution of
the surrounding regional ecosystems 12.3.5 and 12.3.13; ’
d. all koala habitat tree species planted are to be derived from local seed stock;
@. in addition to the re-planting within the Riparian Buffer Area, the existing riparian vegetation
within proposed Lot 2 is to be actively managed to limit weeds and soil erosion.
f. the land holder shall ensure that natural regeneration of the riparian vegetation is allowed to
occur by restricting access to domestic grazing animals; and
g. suitable protective measures (e.g. fencing) are required to be installed around the
rehabilitation area (s) at the time of planting and remain in place until the maintenance
period has finished. Please refer to condition 9 for maintenance requirements.
9. Rehabilitation is to be completed within one (1) year of the date the reconfiguration approval is issued
. by Noosa Shire Council. : .
40. Maintenance of the completed rehabilitation is to be undertaken over a period of two (2) years,
commencing from the date revegetation is completed. Maintenance actions are to address the
following:
i. soil erosion; stabilisation of soil structure;
replacement of dead tree plantings;
tegular watering, taking into consideration current water restrictions; and
weed incursion; removal and management of noxious plant and environmental weed
species.
o Page 3 of 5 * AF080109 : . Environmental Protection Agency
Page 11 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2006.00002378.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 599 KB (small file)
- File type
No other editions are linked here.