-17-

 

 

Schedule A — Glossary

Clearing as a result of reconfiguring includes:
e clearing of assessable vegetation that will result from reconfiguration of the
lot(s), consisting of any of the following

And

clearing for boundary fence lines for each proposed allotment (whether or
nat the clearing is proposed as part of the application)

clearing for infrastructure—including stormwater management systems,
water supply and sewerage systems—roads, access routes or utilities
corridors that are proposed as part of the RaL application or that will be
required as a condition of approval by the assessment manager

clearing for excavation and filling—for example, where the lots are to be
levelled.

* clearing of assessable vegetation that will become exempt if the development -
application is approved. This includes any of the following examples

clearing for a single residence and reasonably associated buildings and

structures for each allotment to be created as a result of the RaL, where

no such dwelling house already exists on the proposed allotment

alt lots will be assessed as including clearing of 2 ha for of the purpose

stated in (b)(i), or for lots smaller than 2 ha the whole area of the lot,

unless the application demonstrates that a greater or smaller area will be

required and achieved—for example, building envelopes binding on title

clearing for routine management and essential management purposes

associated with the approved development including clearing to maintain

proposed infrastructure, facilities, roads, access routes, utilities, services

and fences, and clearing to maintain the safety of persons and property

that will be associated with the development

clearing for necessary fire breaks and fire management lines associated

with the development. This will be assessed as follows

i. all built infrastructure other than underground services, roads and
fences will be assessed as requiring clearing for firebreaks with a
width of 1.5 times the height of the tallest vegetation_adjacent to the
infrastructure, or 20m, whichever is the greater. However, evidence
may be provided to NRW that confirms that an alternative firebreak
width is required that is consistent with the State Planning Policy
(SPP) 1/03 Guideline
ii.. all proposed allotment boundaries will be assessed as requiring
clearing for fire management lines with a width of 10m constructed
on either side of the allotment boundary, unless NRW is provided
with evidence that confirms that an alternative width of fire
management line is required or an alternative configuration of fire
management lines are required that is consistent with the SPP 1/03
Guideline
iii. in the case of evidence being presented that demonstrates

alternative fire management guidelines as being sufficient and
consistent with the SPP 1/03, NRW may condition the development
so that the full extent of exempt clearing prescribed for essential
management under Schedule 8 of the IPA cannot be carried out by
current or future landholders.

The Department of Natural Resources and Water IC1106NAM0008 3of3

Used in these records

About this file

File size
599 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2006.00002378.001 [As Published].pdf · 599 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.