Council archive · source document
Decision Notice - 010.2006.00002378.001 [As Published] · 152006.2378
-3-
13. All redundant vehicular crossings to the site shall be removed and the areas reinstated in
accordance with Council’s standard specifications prior to Council’s endorsement of the Plan
of Survey.
Engineering Issues
14. All designs for engineering works involving the construction of pavements, vehicular access,
footpaths etc shall be prepared in accordance with Council’s Planning Scheme Policy PSP 5
Engineering Design Standards – Roads, Drainage and Earthworks and shall reference where
applicable to Council’s Standard Drawings and shall incorporate best engineering practice.
15. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works.
16. Prior to Council endorsing the Plan of Survey, a certificate from a registered Professional Civil
Engineer shall be submitted to Council for each Development Permit for Operational Works
issued pursuant to this permit. The engineer shall certify that he has supervised those works
and that they have been completed in a workman like manner in accordance with good
engineering practice and in accordance with that permit.
Easements
17. The access easement to proposed Lot 1 shall be a minimum of 10.0 metres wide with the
width being increased where necessary to accommodate passing lanes and services or to
provide the specified clearances from cut/fill batters.
18. Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required
Grant of Easement shall be submitted to Council for perusal.
Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of
Survey.
Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to
the endorsing of the Plan of Survey.
19. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's
Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the Plan of
Survey at the Land Titles Office, the Title Deed and the easement documents will also be
lodged and any additional Titles Office forms or requisitions requiring the consent of Council
being attended to forthwith.
Effluent Disposal
20. All septic and sullage wastes shall be disposed of on site to the reasonable satisfaction of the
Manager - Building Services. Plans prepared by a registered Consulting Civil Engineer are to
be submitted to and approved by Council's Manager - Building Services, prior to the issue of a
Development Permit for Building Works.
21. The applicant shall submit an Effluent Disposal report for proposed Lot 1 for approval prior to
Council’s endorsement of the Plan of Survey. The report shall be prepared by a suitably
qualified geotechnical engineer and shall make recommendations on the treatment system
and application areas required to dispose of effluent for a typical residential use. The design of
the on-site effluent disposal system and disposal area (land application area) shall be in
accordance with Council’s Planning Scheme Policy PSP24 - Effluent Disposal.
Please note the land application area shall be positioned to achieve the greatest possible
setback to any permanent or intermittent watercourse and at least 15m from any underground
rainwater tanks.
Page 3 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2006.00002378.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 599 KB (small file)
- File type
No other editions are linked here.