Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Decision Notice - 010.2006.00002378.001 [As Published] · 152006.2378

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                  -7-



2.    The applicant is informed that approval of this development application will trigger an
      Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
      Charges Plan for the estimated amount of $2,818 and is subject to variations in the Consumer
      Price Index, All Groups Brisbane from December 2007 until the date of payment. An
      Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
      Planning Act 1997.
3.    A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
      Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
4.    A Registered Professional Civil Engineer means an engineer who is registered with the
      Board of Professional Engineers of Queensland.
5.    The person acting on this permit means any person or company who undertakes
      development pursuant to this permit.
6.    AS/NZS 2890.1 – 2004 means Australian Standard for Off Street Carparking – AS/NZS
      2890.1-2004.
7.    Principal Contractor means the person nominated by the Applicant and approved by the
      Manager - Land Development at a pre-start meeting as being responsible for the major
      component of works associated with a Development Permit for Operational Works of any
      works on the site.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES
The following property notes will be placed against the subject property in Council’s property record
system:
“The property is in an unsewered area. Effluent shall be disposed of on-site in accordance with
Council’s policy for on-site wastewater disposal current at the time of Building Works. A detailed site
assessment and effluent land application design will be required to be submitted to Council at the
time of an application for a Development Permit for Building Works or modifications to the effluent
disposal system.”

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not Applicable.




                                                                                                Page 7 of 20

Used in these records

About this file

File size
599 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2006.00002378.001 [As Published].pdf · 599 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.