Council archive · source document
Response to Info Request - Attachment 6b - Ecological Assessment Part 2 MCU18-0015 & RAL18-0001 · MCU18/0015
Ecological Assessment – Attunga Heights
Specific Outcomes Probable Solutions Response
S11.2 No clearing of other habitat trees or No hollow bearing trees were observed during site
recruitment habitat trees. assessments.
Steep slopes
O13 Vegetation on steep slopes is retained and No solution provided. The majority of vegetation on the site will be
managed to avoid erosion and landslide and to retained and rehabilitated to protect ecological
protect natural resources and values. values and prevent erosion.
Engineering and site works
O14 Development is sited and designed to— S14.1 Works, including roads, driveways, No fauna underpasses or speed reduction features
a) provide adequate separation distance fences, sewer lines and other infrastructure— are considered necessary. It is not expected that
between the vegetation to be protected and a) do not transect areas of vegetation; or fencing will be required within the retained
the development to avoid disturbing, b) are co-located within a combined utility vegetation, however in the event fencing is
destabilising and deoxygenating any tree or corridor; and required, fauna friendly designs will be utilised.
altering the drainage; c) provide for fauna underpasses, speed
b) avoid traversing or fragmenting vegetation or reduction devices and associated fencing, A Vegetation Management Plan will be prepared
habitats for significant flora and fauna lighting and warning signs, where for Council’s approval prior to the
species; and appropriate; commencement of works. This Plan will ensure
c) avoid creating barriers to faunal movement. that retained vegetation is protected from
AND interference, and that appropriate site practices
are adopted during construction.
S14.2 Development within or adjacent to areas of
vegetation, incorporate fauna friendly fences;
AND
S14.3 Vegetation is protected from interference
resulting from clearing or construction activities
by—
a) clearly marking vegetation to be retained
with flagging tape;
Job No: Q12038/RW3 JWA Pty Ltd 102
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Info Request - Attachment 6b - Ecological Assessment Part 2 MCU18-0015 & RAL18-0001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.