Appendix A - SDAP - State Code 1 - Development in a state controlled road environment response template

of 17

Page text shows just the words. Original shows the document exactly as it was published.

State code 1: Development in a state-controlled road
environment
Table 1.1 Development in general
 Performance outcomes                                Acceptable outcomes                              Response
 Buildings, structures, infrastructure, services and utilities
 PO1 The location of the development does not     AO1.1 Development is not located in a state-        Complies – there is no new building work.
 create a safety hazard for users of the state-   controlled road.
 controlled road.
                                                  AND

                                                     AO1.2 Development can be maintained without
                                                     requiring access to a state-controlled road.
 PO2 The design and construction of the              No acceptable outcome is prescribed.             Complies – the proposed expansion of the landfill will
 development does not adversely impact the                                                            provide for improved safety for the general public by
 structural integrity or physical condition of the                                                    providing for greater separation within the Resource
 state-controlled road or road transport                                                              Recovery Area and will not result in an increase in
 infrastructure.                                                                                      traffic generation.
 PO3 The location of the development does not        No acceptable outcome is prescribed.             Complies – there is no change to the location of the
 obstruct road transport infrastructure or                                                            development or the existing access.
 adversely impact the operating performance of
 the state-controlled road.
 PO4 The location, placement, design and             No acceptable outcome is prescribed.             Complies – there is no change to the existing
 operation of advertising devices, visible from                                                       advertising signage.
 the state-controlled road, do not create a
 safety hazard for users of the state-controlled
 road.
 PO5 The design and construction of buildings        AO5.1 Facades of buildings and structures        Complies – no new buildings are being proposed.
 and structures does not create a safety hazard      fronting the state-controlled road are made of
 by distracting users of the state-controlled        non-reflective materials.
 road.

State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                                                   Page 1 of 17
Log in to download the original file

Appendix A - SDAP - State Code 1 - Development in a state controlled road environment response template.pdf · 211 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 16 pages

Page 2

 Performance outcomes                             Acceptable outcomes                                  Response
                                                  AND

                                                  AO5.2 Facades of buildings and structures do
                                                  not direct or reflect point light sources into the
                                                  face of oncoming traffic on the state-controlled
                                                  road.

                                                  AND

                                                  AO5.3 External lighting of buildings and
                                                  structures is not directed into the face of
                                                  oncoming traffic on the state-controlled road.

                                                  AND

                                                  AO5.4 External lighting of buildings and
                                                  structures does not involve flashing or laser
                                                  lights.
 PO6 Road, pedestrian and bikeway bridges         AO6.1 Road, pedestrian and bikeway bridges           N/A
 over a state-controlled road are designed and    over the state-controlled road include throw
 constructed to prevent projectiles from being    protection screens in accordance with section
 thrown onto the state-controlled road.           4.11 of the Design Criteria for Bridges and
                                                  Other Structures Manual, Department of
                                                  Transport and Main Roads, 2020.
 Landscaping
 PO7 The location of landscaping does not         AO7.1 Landscaping is not located in a state-         Complies – no new landscaping is being proposed.
 create a safety hazard for users of the state-   controlled road.
 controlled road.
                                                  AND

                                                  AO7.2 Landscaping can be maintained without
                                                  requiring access to a state-controlled road.

                                                  AND



State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                                                Page 2 of 17

Page 3

 Performance outcomes                                Acceptable outcomes                                Response
                                                     AO7.3 Landscaping does not block or obscure
                                                     the sight lines for vehicular access to a state-
                                                     controlled road.
 Stormwater and overland flow
 PO8 Stormwater run-off or overland flow from        No acceptable outcome is prescribed.               Complies – the stormwater management for the
 the development site does not create or                                                                development is to be provided in accordance with an
 exacerbate a safety hazard for users of the                                                            updated Stormwater Management Plan and will not
 state-controlled road.                                                                                 affect a state-controlled road (refer Attachment 5).
 PO9 Stormwater run-off or overland flow from        No acceptable outcome is prescribed.               Complies – Refer above.
 the development site does not result in a
 material worsening of the operating
 performance of the state-controlled road or
 road transport infrastructure.
 PO10 Stormwater run-off or overland flow from       No acceptable outcome is prescribed.               Complies – Refer above.
 the development site does not adversely impact
 the structural integrity or physical condition of
 the state-controlled road or road transport
 infrastructure.
 PO11 Development ensures that stormwater is         AO11.1 Development does not create any new         Complies – Refer above.
 lawfully discharged.                                points of discharge to a state-controlled road.

                                                     AND

                                                     AO11.2 Development does not concentrate
                                                     flows to a state-controlled road.

                                                     AND

                                                     AO11.3 Stormwater run-off is discharged to a
                                                     lawful point of discharge.

                                                     AND




State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                                                    Page 3 of 17

Page 4

 Performance outcomes                              Acceptable outcomes                               Response
                                                   AO11.4 Development does not worsen the
                                                   condition of an existing lawful point of
                                                   discharge to the state-controlled road.
 Flooding
 PO12 Development does not result in a             AO12.1 For all flood events up to 1% annual       Complies – The issue of flooding has been considered
 material worsening of flooding impacts within a   exceedance probability, development results       in the updated Stormwater Management Plan and will
 state-controlled road.                            in negligible impacts (within +/- 10mm) to        not result in a material worsening of flooding within a
                                                   existing flood levels within a state-controlled   state-controlled road.
                                                   road.

                                                   AND

                                                   AO12.2 For all flood events up to 1% annual
                                                   exceedance probability, development results
                                                   in negligible impacts (up to a 10% increase) to
                                                   existing peak velocities within a state-
                                                   controlled road.

                                                   AND

                                                   AO12.3 For all flood events up to 1% annual
                                                   exceedance probability, development results
                                                   in negligible impacts (up to a 10% increase) to
                                                   existing time of submergence of a state-
                                                   controlled road.
 Drainage Infrastructure
 PO13 Drainage infrastructure does not create a    AO13.1 Drainage infrastructure is wholly          N/A
 safety hazard for users in the state-controlled   contained within the development site, except
 road.                                             at the lawful point of discharge.

                                                   AND

                                                   AO13.2 Drainage infrastructure can be
                                                   maintained without requiring access to a state-
                                                   controlled road.
State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                                                  Page 4 of 17

Page 5

 Performance outcomes                             Acceptable outcomes                           Response
 PO14 Drainage infrastructure associated with,    No acceptable outcome is prescribed.
 or within, a state-controlled road is
 constructed, and designed to ensure the
 structural integrity and physical condition of
 existing drainage infrastructure and the
 surrounding drainage network.

Table 1.2 Vehicular access, road layout and local roads
 Performance outcomes                               Acceptable outcomes                              Response
 Vehicular access to a state-controlled road or within 100 metres of a state-controlled road intersection
 PO15 The location, design and operation of a       No acceptable outcome is prescribed.             N/A
 new or changed access to a state-controlled
 road does not compromise the safety of users of
 the state-controlled road.
 PO16 The location, design and operation of a       No acceptable outcome is prescribed.             N/A
 new or changed access does not adversely
 impact the functional requirements of the state-
 controlled road.
 PO17 The location, design and operation of a       No acceptable outcome is prescribed.             N/A
 new or changed access is consistent with the
 future intent of the state-controlled road.
 PO18 New or changed access is consistent with No acceptable outcome is prescribed.                  N/A
 the access for the relevant limited access road
 policy:
 1. LAR 1 where direct access is prohibited; or
 2. LAR 2 where access may be permitted,
     subject to assessment.
 PO19 New or changed access to a local road         No acceptable outcome is prescribed.             N/A
 within 100 metres of an intersection with a state-
 controlled road does not compromise the safety
 of users of the state-controlled road.
 PO20 New or changed access to a local road         No acceptable outcome is prescribed.             N/A
 within 100 metres of an intersection with a state-
 controlled road does not adversely impact on the
 operating performance of the intersection.
State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                Page 5 of 17

Page 6

 Performance outcomes                                Acceptable outcomes                    Response
 Public passenger transport and active transport
 PO21 Development does not compromise the          No acceptable outcome is prescribed.     N/A
 safety of users of public passenger transport
 infrastructure, public passenger services and
 active transport infrastructure.
 PO22 Development maintains the ability for        No acceptable outcome is prescribed.     N/A
 people to access public passenger transport
 infrastructure, public passenger services and
 active transport infrastructure.
 PO23 Development does not adversely impact the No acceptable outcome is prescribed.        N/A
 operating performance of public passenger
 transport infrastructure, public passenger
 services and active transport infrastructure.
 PO24 Development does not adversely impact        No acceptable outcome is prescribed.     N/A
 the structural integrity or physical condition of
 public passenger transport infrastructure and
 active transport infrastructure.


Table 1.3 Network impacts
 Performance outcomes                                Acceptable outcomes                    Response
 PO25 Development does not compromise the            No acceptable outcome is prescribed.   Complies – There is no increase in the intensity of
 safety of users of the state-controlled road                                               the use on the land and therefore will not
 network.                                                                                   compromise the safety if users of the state-
                                                                                            controlled road network.
 PO26 Development ensures no net worsening of        No acceptable outcome is prescribed.   Complies – Refer above.
 the operating performance of the state-controlled
 road network.
 PO27 Traffic movements are not directed onto a      No acceptable outcome is prescribed.   Complies – There is no proposed change to the
 state-controlled road where they can be                                                    current access arrangement or the existing traffic
 accommodated on the local road network.                                                    generation.
 PO28 Development involving haulage exceeding        No acceptable outcome is prescribed.   Complies – There is no increase in the intensity of
 10,000 tonnes per year does not adversely impact                                           the landfill operation as a result of the change with
 the pavement of a state-controlled road.                                                   more useable are being provided.


State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                                     Page 6 of 17

Page 7

 Performance outcomes                                 Acceptable outcomes                    Response
 PO29 Development does not impede delivery of         No acceptable outcome is prescribed.   Complies – The proposed development will not
 planned upgrades of state-controlled roads.                                                 impede any planned upgrades of state-controlled
                                                                                             roads.
 PO30 Development does not impede delivery of         No acceptable outcome is prescribed.   Complies – The proposed development will not
 corridor improvements located entirely within                                               impede delivery of any corridor improvements and
 the state-controlled road corridor.                                                         is removed from the frontage.

Table 1.4 Filling, excavation, building foundations and retaining structures
 Performance outcomes                                 Acceptable outcomes                    Response
 PO31 Development does not create a safety            No acceptable outcome is prescribed.   Complies – All earthworks are internal to the site,
 hazard for users of the state-controlled road or                                            with the majority of fill material to be sourced from
 road transport infrastructure.                                                              within the landfill site.
 PO32 Development does not adversely impact the       No acceptable outcome is prescribed.   Complies – The proposed earthworks for the
 operating performance of the state-controlled                                               development is not likely to impact the operating
 road.                                                                                       performance of the state-controlled road, with the
                                                                                             majority of the fill required to be sourced from
                                                                                             within the landfill site.
 PO33 Development does not undermine, damage          No acceptable outcome is prescribed.   Complies – Refer above.
 or cause subsidence of a state-controlled road.
 PO34 Development does not cause ground water         No acceptable outcome is prescribed.   Complies – The proposed development will not
 disturbance in a state-controlled road.                                                     affect ground water within a state-controlled road.
 PO35 Excavation, boring, piling, blasting and fill   No acceptable outcome is prescribed.   Complies – The proposed excavation and filling
 compaction do not adversely impact the physical                                             works will not adversely impact a state-controlled
 condition or structural integrity of a state-                                               road.
 controlled road or road transport
 infrastructure.
 PO36 Filling and excavation associated with the      No acceptable outcome is prescribed.   Complies – The existing access is to remain
 construction of new or changed access do not                                                unchanged with the filling and excavation works
 compromise the operation or capacity of existing                                            proposed being well removed from the state-
 drainage infrastructure for a state-controlled                                              controlled road.
 road.



Table 1.5 Environmental emissions
State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                                       Page 7 of 17

Page 8

Statutory note: Where a state-controlled road is co-located in the same transport corridor as a railway, the development should instead comply with Environmental emissions in State code 2:
Development in a railway environment.
  Performance outcomes                                            Acceptable outcomes                                             Response
  Reconfiguring a lot
  Involving the creation of 5 or fewer new residential lots adjacent to a state-controlled road or type 1 multi-modal corridor
  PO37 Development minimises free field noise       AO37.1 Development provides a noise barrier or      N/A
  intrusion from a state-controlled road.           earth mound which is designed, sited and
                                                    constructed:
                                                    1. to achieve the maximum free field acoustic
                                                         levels in reference table 2 (item 2.1);
                                                    2. in accordance with:
                                                          a. Chapter 7 integrated noise barrier design
                                                               of the Transport Noise Management
                                                               Code of Practice: Volume 1 (Road Traffic
                                                               Noise), Department of Transport and
                                                               Main Roads, 2013;
                                                          b. Technical Specification-MRTS15 Noise
                                                               Fences, Transport and Main Roads,
                                                               2019;
                                                          c. Technical Specification-MRTS04 General
                                                               Earthworks, Transport and Main Roads,
                                                               2020.

                                                                   OR

                                                                   AO37.2 Development achieves the maximum free
                                                                   field acoustic levels in reference table 2 (item
                                                                   2.1) by alternative noise attenuation measures
                                                                   where it is not practical to provide a noise barrier
                                                                   or earth mound.

                                                                   OR

                                                    AO37.3 Development provides a solid gap-free
                                                    fence or other solid gap-free structure along the
                                                    full extent of the boundary closest to the state-
                                                    controlled road.
  Involving the creation of 6 or more new residential lots adjacent to a state-controlled road or type 1 multi-modal corridor
State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                                                                                    Page 8 of 17

Page 9

 Performance outcomes                               Acceptable outcomes                                     Response
 PO38 Reconfiguring a lot minimises free field       AO38.1 Development provides noise barrier or       N/A
 noise intrusion from a state-controlled road.       earth mound which is designed, sited and
                                                     constructed:
                                                     1. to achieve the maximum free field acoustic
                                                         levels in reference table 2 (item 2.1);
                                                     2. in accordance with:
                                                          a. Chapter 7 integrated noise barrier design
                                                               of the Transport Noise Management
                                                               Code of Practice: Volume 1 (Road Traffic
                                                               Noise), Department of Transport and
                                                               Main Roads, 2013;
                                                          b. Technical Specification-MRTS15 Noise
                                                               Fences, Transport and Main Roads,
                                                               2019;
                                                          c. Technical Specification-MRTS04 General
                                                               Earthworks, Transport and Main Roads,
                                                               2020.

                                                     OR

                                                     AO38.2 Development achieves the maximum free
                                                     field acoustic levels in reference table 2 (item
                                                     2.1) by alternative noise attenuation measures
                                                     where it is not practical to provide a noise barrier
                                                     or earth mound.
 Material change of use (accommodation activity)
 Ground floor level requirements adjacent to a state-controlled road or type 1 multi-modal corridor
 PO39 Development minimises noise intrusion from AO39.1 Development provides a noise barrier or     N/A
 a state-controlled road in private open space.   earth mound which is designed, sited and
                                                  constructed:
                                                  1. to achieve the maximum free field acoustic
                                                      levels in reference table 2 (item
                                                      2.2) for private open space at the ground
                                                      floor level;
                                                  2. in accordance with:


State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                       Page 9 of 17

Page 10

 Performance outcomes                                Acceptable outcomes                                   Response
                                                          a.   Chapter 7 integrated noise barrier design
                                                               of the Transport Noise Management
                                                               Code of Practice: Volume 1 (Road Traffic
                                                               Noise), Department of Transport and
                                                               Main Roads, 2013;
                                                          b.   Technical Specification-MRTS15 Noise
                                                               Fences, Transport and Main Roads,
                                                               2019;
                                                          c.   Technical Specification-MRTS04 General
                                                               Earthworks, Transport and Main Roads,
                                                               2020.

                                                     OR

                                                     AO39.2 Development achieves the maximum free
                                                     field acoustic level in reference table 2 (item
                                                     2.2) for private open space by alternative noise
                                                     attenuation measures where it is not practical to
                                                     provide a noise barrier or earth mound.
 PO40 Development (excluding a relevant              AO40.1 Development (excluding a relevant             N/A
 residential building or relocated                   residential building or relocated building)
 building) minimises noise intrusion from a state-   provides a noise barrier or earth mound which is
 controlled road in habitable rooms at the           designed, sited and constructed:
 facade.                                             1. to achieve the maximum building façade
                                                           acoustic level in reference table 1 (item 1.1)
                                                           for habitable rooms;
                                                     2. in accordance with:
                                                           a. Chapter 7 integrated noise barrier design
                                                                of the Transport Noise Management
                                                                Code of Practice: Volume 1 (Road Traffic
                                                                Noise), Department of Transport and
                                                                Main Roads, 2013;
                                                           b. Technical Specification-MRTS15 Noise
                                                                Fences, Transport and Main Roads,
                                                                2019;


State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                      Page 10 of 17

Page 11

 Performance outcomes                               Acceptable outcomes                                    Response
                                                          c.   Technical Specification-MRTS04 General
                                                               Earthworks, Transport and Main Roads,
                                                               2020.

                                                     OR

                                                     AO40.2 Development (excluding a relevant
                                                     residential building or relocated building)
                                                     achieves the maximum building façade acoustic
                                                     level in reference table 1 (item 1.1) for habitable
                                                     rooms by alternative noise attenuation
                                                     measures where it is not practical to provide a
                                                     noise barrier or earth mound.
 PO41 Habitable rooms (excluding a relevant          No acceptable outcome is provided.             N/A
 residential building or relocated building) are
 designed and constructed using materials to
 achieve the maximum internal acoustic level in
 reference table 3 (item 3.1).
 Above ground floor level requirements (accommodation activity) adjacent to a state-controlled road or type 1 multi-modal corridor
 PO42 Balconies, podiums, and roof decks include: No acceptable outcome is provided.                N/A
 1. a continuous solid gap-free structure or
     balustrade (excluding gaps required for
     drainage purposes to comply with the Building
     Code of Australia);
 2. highly acoustically absorbent material
     treatment for the total area of the soffit above
     balconies, podiums, and roof decks.
 PO43 Habitable rooms (excluding a relevant           No acceptable outcome is provided.            N/A
 residential building or relocated building) are
 designed and constructed using materials
 to achieve the maximum internal acoustic level in
 reference table 3 (item 3.1).
 Material change of use (other uses)
 Ground floor level requirements (childcare centre, educational establishment, hospital) adjacent to a state-controlled road or type 1 multi-modal
 corridor
 PO44 Development:                                    No acceptable outcome is provided.            N/A
State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                                        Page 11 of 17

Page 12

 Performance outcomes                                 Acceptable outcomes                  Response
 1.   provides a noise barrier or earth mound that
      is designed, sited and constructed:
      a. to achieve the maximum free field
          acoustic level in reference table 2 (item
          2.3) for all outdoor education areas and
          outdoor play areas;
      b. in accordance with:
             i. Chapter 7 integrated noise barrier
                 design of the Transport Noise
                 Management Code of Practice:
                 Volume 1 (Road Traffic Noise),
                 Department of Transport and Main
                 Roads, 2013;
            ii. Technical Specification-MRTS15
                 Noise Fences, Transport and Main
                 Roads, 2019;
           iii. Technical Specification-MRTS04
                 General Earthworks, Transport
                 and Main Roads, 2020; or
 2. achieves the maximum free field acoustic
      level in reference table 2 (item 2.3) for all
      outdoor education areas and outdoor
      play areas by alternative noise
      attenuation measures where it is not
      practical to provide a noise barrier or earth
      mound.
 PO45 Development involving a childcare centre        No acceptable outcome is provided.    N/A
 or educational establishment:
 1. provides a noise barrier or earth mound that
      is designed, sited and constructed:
 2. to achieve the maximum building facade
      acoustic level in reference table 1 (item
      1.2);
 3. in accordance with:
      a. Chapter 7 integrated noise barrier design
          of the Transport Noise Management

State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                      Page 12 of 17

Page 13

 Performance outcomes                               Acceptable outcomes                           Response
          Code of Practice: Volume 1 (Road Traffic
          Noise), Department of Transport and
          Main Roads, 2013;
       b. Technical Specification-MRTS15 Noise
          Fences, Transport and Main Roads,
          2019;
       c. Technical Specification-MRTS04 General
          Earthworks, Transport and Main Roads,
          2020; or
 4. achieves the maximum building facade
       acoustic level in reference table 1 (item
       1.2) by alternative noise attenuation
       measures where it is not practical to provide
       a noise barrier or earth mound.
 PO46 Development involving:                          No acceptable outcome is provided.           N/A
 1. indoor education areas and indoor play
       areas; or
 2. sleeping rooms in a childcare centre; or
 3. patient care areas in a hospital achieves the
       maximum internal acoustic level in reference
       table 3 (items 3.2-3.4).
 Above ground floor level requirements (childcare centre, educational establishment, hospital) adjacent to a state-controlled road or type 1 multi-
 modal corridor
 PO47 Development involving a childcare centre        No acceptable outcome is provided.           N/A
 or educational establishment which have
 balconies, podiums or elevated outdoor play
 areas predicted to exceed the maximum free
 field acoustic level in reference table 2 (item 2.3)
 due to noise from a state-controlled road are
 provided with:
 1. a continuous solid gap-free structure or
      balustrade (excluding gaps required for
      drainage purposes to comply with the Building
      Code of Australia);



State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                                         Page 13 of 17

Page 14

 Performance outcomes                                   Acceptable outcomes                               Response
 2. highly acoustically absorbent material
     treatment for the total area of the soffit above
     balconies or elevated outdoor play areas.
 PO48 Development including:                            No acceptable outcome is provided.                 N/A
 1. indoor education areas and indoor play
     areas in a childcare centre or educational
     establishment; or
 2. sleeping rooms in a childcare centre; or
 3. patient care areas in a hospital located
     above ground level, is designed and
     constructed to achieve the maximum internal
     acoustic level in reference table 3 (items 3.2-
     3.4).
 Air, light and vibration
 PO49 Private open space, outdoor education             AO49.1 Each dwelling or unit has access to a       N/A
 areas and outdoor play areas are protected             private open space which is shielded from a
 from air quality impacts from a state-controlled       state-controlled road by a building, solid gap-
 road.                                                  free fence, or other solid gap-free structure.

                                                        OR

                                                        AO49.2 Each outdoor education area and
                                                        outdoor play area is shielded from a state-
                                                        controlled road by a building, solid gap-free
                                                        fence, or other solid gap-free structure.




State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                     Page 14 of 17

Page 15

 Performance outcomes                                 Acceptable outcomes                                 Response
 PO50 Patient care areas within hospitals are         AO50.1 Hospitals are designed and constructed
 protected from vibration impacts from a state-       to ensure vibration in the patient treatment area
 controlled road or type 1 multi-modal corridor.      does not exceed a vibration dose value of
                                                      0.1m/s1.75.

                                                      AND

                                                      AO50.2 Hospitals are designed and constructed
                                                      to ensure vibration in the ward of a patient care
                                                      area does not exceed a vibration dose value of
                                                      0.4m/s1.75.
 PO51 Development is designed and sited to            No acceptable outcomes are prescribed.               N/A
 ensure light from infrastructure within, and from
 users of, a state-controlled road or type 1 multi-
 modal corridor, does not:
 1. intrude into buildings during night hours (10pm
     to 6am);
 2. create unreasonable disturbance during
     evening hours (6pm to 10pm).

Table 1.6: Development in a future state-controlled road environment
 Performance outcomes                                 Acceptable outcomes                                 Response
 PO52 Development does not impede delivery of a       AO52.1 Development is not located in a future       N/A
 future state-controlled road.                        state-controlled road.

                                                      OR ALL OF THE FOLLOWING APPLY:

                                                      AO52.2 Development does not involve filling and
                                                      excavation of, or material changes to, a future
                                                      state-controlled road.

                                                      AND


State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                     Page 15 of 17

Page 16

 Performance outcomes                                 Acceptable outcomes                                 Response
                                                      AO52.3 The intensification of lots does not occur
                                                      within a future state-controlled road.

                                                      AND

                                                      AO52.4 Development does not result in the
                                                      landlocking of parcels once a future state-
                                                      controlled road is delivered.
 PO53 The location and design of new or               AO53.1 Development does not include new or          N/A
 changed access does not create a safety hazard       changed access to a future state-controlled
 for users of a future state-controlled road.         road.
 PO54 Filling, excavation, building foundations and   No acceptable outcome is prescribed.                N/A
 retaining structures do not undermine, damage
 or cause subsidence of a future state-controlled
 road.
 PO55 Development does not result in a material       No acceptable outcome is prescribed.                N/A
 worsening of stormwater, flooding, overland flow
 or drainage impacts in a future state-controlled
 road or road transport infrastructure.
 PO56 Development ensures that stormwater is          AO56.1 Development does not create any new          N/A
 lawfully discharged.                                 points of discharge to a future state-controlled
                                                      road.

                                                      AND

                                                      AO56.2 Development does not concentrate flows
                                                      to a future state-controlled road.

                                                      AND

                                                      AO56.3 Stormwater run-off is discharged to a
                                                      lawful point of discharge.

                                                      AND

State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                     Page 16 of 17

Page 17

 Performance outcomes                               Acceptable outcomes                                  Response

                                                    AO56.4 Development does not worsen the
                                                    condition of an existing lawful point of discharge
                                                    to the future state-controlled road.




State Development Assessment Provisions v3.0

State code 1: Development in a state-controlled road environment                                                    Page 17 of 17

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.