Attachment 2 - Existing Approval
ED 23141 OPW-08 G Plant List prepared by Element Design 11.02.2024
ED 23141 OPW-09 G Specification prepared by Element Design 11.02.2024
Arborist Report - Arborist Report, prepared by, Australian Tree 13.09.2023
Contractors & Aboricultural Consultants
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 13 May 2030, unless an application to extend the currency period is
approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
3. Deleted.
4. Submit amended plans to Council as described in the List of plans requiring amendments.
Plans must be submitted and approved prior to the pre-start meeting.
5. All necessary approvals from external service providers (eg Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
6. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
Construction at the “pre start” meeting.
7. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting.
8. A condition report of the drainage system must be completed for agreement at the prestart
meeting. The report is to confirm that the capacity of the network is consistent with the
capacity assumed in the Stormwater Management Plan Rev D (prepared by SCG Consulting
Engineers, dated 12/3/24). The report is to include a CCTV inspection of the existing pipe
and must include at least 50m upstream and downstream of all works.
9. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
10. Prior to requesting a prestart meeting:
a. Receipt of amended plans approval.
b. Receipt of Fauna management plan.
c. Tree protection fencing must be installed under the supervision of the qualified person*.
(Refer to Advisory Note)
11. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Erosion and sediment control works;
c. Arboreal works.
d. Fauna management works.
e. Other relevant parties
Page 14 of 31
Document Set ID: 23876458
Version: 4, Version Date: 09/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 2 - Existing Approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.