Original source · versioned page text
Attachment 2 - Existing Approval
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE (MCU23/0094)
When Conditions Must Be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Currency Period
2. This development approval lapses if the use has not happened by 13 May 2030, unless an
application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table/s below, unless otherwise amended by a condition.
Plan No. Rev. Plan/Document Name Date
General
WD0.05 7 Site Plan prepared by Blackwood Architecture & 25/03/2025
Design
WD0.06 7 Site Plan – Ground Level prepared by Blackwood 25/03/2025
Architecture & Design
WD0.07 6 Site Plan – Upper Level prepared by Blackwood 25/03/2025
Architecture & Design
WD0.08 6 Site Plan – Roof prepared by Blackwood 25/03/2025
Architecture & Design
WD0.09 6 Site – Elevations prepared by Blackwood 25/03/2025
Architecture & Design
WD.0.10 6 Site – Internal Elevations / Sections prepared by 25/03/2025
Blackwood Architecture & Design
WD.1.19 6 Landscape prepared by Blackwood Architecture & 25/03/2025
Design
WD.1.22 6 External Colour Comparison prepared by 25/03/2025
Blackwood Architecture & Design
Page 2 of 31
Document Set ID: 23876458
Version: 4, Version Date: 09/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 2 - Existing Approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.