Original source · versioned page text
Attachment 2 - Existing Approval
NOOSA COUNCIL MATERIALS AND FINISHES
APPROVED PLAN CODE DESCRIPTION FINISH FT3 2m Powdercoated Aluminium Screen XXXX
MCU23/0094.02, OPW23/0113.02 & RAL23/0014.02
7 JULY 2025 AWN1 Awning Hood Powder Coated Aluminium Surfmist PV1 Feature Driveway Entry Beauford Crazy Pave
AWN2 Awning Hood Powder Coated Aluminium Surfmist RN1 Render Resene Black White
BAL3 Aluminium and Clear glass balustrade Powder Coated Aluminium Surfmist RN2 Render with Sawcuts Concrete Look
BAL4 Solid Balustrade Birch RN3 Render with Sawcuts To Match Surfmist
BAL5 Aluminium and Clear glass balustrade Powder Coated Aluminium Surfmist RN4 Render over cladding Resene Black White
BAL6 Aluminium and Translucent glass balustrade Powder Coated Aluminium Surfmist RN5 Render with Sawcuts over cladding Concrete Look
CLD1 Hardies Oblique Resene Black White RS1 LYSAGHT Colorbond roof sheet Colorbond Surfmist
CLD2 Hardies Axon Limed SCN1 Aluminium Batten Screen - angled Powder Coated Aluminium Surfmist
DP PVC Downpipe Wall colour SF1 Soffit lining Resene Black White
EA CONC Driveway; Exposed Aggregate Concrete Silver Frost SF2 Soffit lining Pre-finished
EG1 Eaves Gutter Stramit 175 Quad Colorbond Surfmist SF3 Soffit lining - Territory Panel Limed
FF1 External Tile Paradise Stone Ivory
FT1 2m High Perimeter Fencing Timber Pailing Resene Black White
FT2 1.4m Screen above Rendered Blockwork XXXX
FT3 2m Powdercoated Aluminium Screen XXXX
A.3 B.3 C.3 D.3 E.3
3.3 2.3 1.3
TOWNHOUSE 304
TOWNHOUSE 301 TOWNHOUSE 302 TOWNHOUSE 303 TOWNHOUSE 304
BOUNDARY
W.21 8M HEIGHT LIM
IT
AT ROOF RIDG
E
8M HEIGHT LIMIT RS1 RS1 RS1 8M HEIGHT LIM
RS1 EG1 EG1 IT
AT FASCIA AT FASCIA
EG1
EG1
RN5 RN5 CLD1 CLD1
CLD1 2400 WINDOW & CLD2 W.20 W.20 CLD2 2400 WINDOW &
DOOR HEAD HEIGHT W.20 W.20
DOOR HEAD HEIGHT
W.21 DP
DP
W.21
DP W.21 UPPER LEVEL
UPPER LEVEL DP UPPER LEVEL
FFL+13.420 RN5 DP DP DP DP
RN5
FFL+13.200 RN5 FFL+13.200
RS1 RS1 EG1 EG1
EG1
EG1
DP
2400 WINDOW & RN4 RN4
DOOR HEAD HEIGHT AWN3 AWN3 DP RN4 RN4 RN4 RN4 AWN3
CLD2
2400 WINDOW & 2400 WINDOW &
DP DP DP DP DP DP DP DP
CL DOOR HEAD HEIGHT DOOR HEAD HEIGHT
DP TERRACE TERRACE TERRACE TERRACE
DP
2,400
DP CL CL CL CL
W.06 W.06 GROUND LEVEL AC AC AC
GROUND LEVEL AC GROUND LEVEL
RN4 FFL+10.020
FFL+9.500 AD.04 AD.18 AD.04 AD.18 FFL+9.500
FFL+9.500
FINISHED GROUND FINISHED GROUND
NATURAL GROUND NATURAL GROUND
N BUILDING 3 ELEVATION E BUILDING 3 ELEVATION
- - Scale 1:100
Scale 1:100
1.3 2.3 3.3 E.3 D.3 C.3 B.3 A.3
TOWNHOUSE 301 TOWNHOUSE 304 TOWNHOUSE 303 TOWNHOUSE 302 TOWNHOUSE 301
BOUNDARY
8M HEIGHT LIMIT
RC RC
RC
RS1 RS1 RS1
EG1 RS1 RS1
2400 WINDOW & EG1 EG1 EG1 EG1 EG1
DOOR HEAD HEIGHT EG1 CLD2
RN5
RN5 RN5 CLD1 RN5 2400 WINDOW &
2400 WINDOW & W.20 W.20 RN5
W.20 W.20 DOOR HEAD HEIGHT
DOOR HEAD HEIGHT
DP DP DP DP
UPPER LEVEL DP W.07 W.07 DP W.07
UPPER LEVEL
CLD2 UPPER LEVEL DP
FFL+13.420 DP FFL+13.420
FFL+13.200 RS1 EG1 EG1
2400 WINDOW & EG1
EG1
DOOR HEAD HEIGHT DP RN4 DP DP DP
RN4 RN4 2400 WINDOW &
CLD2 2400 WINDOW &
2400 WINDOW & DOOR HEAD HEIGHT
DOOR HEAD HEIGHT
DP DOOR HEAD HEIGHT
DP SHS
2,400
GROUND LEVEL GROUND LEVEL
RN4 GROUND LEVEL W.05 W.05
FFL+10.240 RN4 W.06 W.06 DP W.05 W.05 RN4 FFL+10.240
FFL+10.020 D.13 AD.09 AD.09 D.14
RN4 D.13 AD.09 AD.09 D.14
FFL+9.500 FINISHED DRIVEWAY
FINISHED DRIVEWAY
NATURAL GROUND
FINISHED GROUND FINISHED GROUND
FINISHED DRIVEWAY
NATURAL GROUND
S BUILDING 3 ELEVATION W BUILDING 3 ELEVATION
- Scale 1:100 - Scale 1:100
Notes:
B L A C K Project: Drawing Title: Project No. Drawn By Drawing No.
Rev Date Description Use figured dimensions in preference to scale. Contact information:
1 28/11/2024 BUILDING APPROVAL ISSUE All dimensions to be varified and checked on
2 13/12/2024 BUILDING APPROVAL RFI ISSUE site. These designs, drawings, specifications
PO Box 781 Tewantin Q 4565 79 - 83 Eumundi Noosa Road B3 - ELEVATIONS 202327 PT WD.3.06
Architect Registration # 5386 QLD
and the copyright thereof are the property of For CAPITAL PRUDENTIAL
4
5
28/02/2025
10/03/2025
CONSTRUCTION ISSUE
Concil AMdendment Issue
Blackwood and must not be used, retained or W O O D Ph: 0416 037 424
[email protected] 79 - 83 EUMUNDI NOOSA ROAD & 26 Scale Date Project Stage Revision
copied without the written authority of
6 25/03/2025 Pools & Landscape Calculation Revised Blackwood. a r c h i t e c t u r e & d e s i g n www.blackwoodarchitecture.com.au HEADLAND DRIVE, NOOSAVILLE QLD 4566 1:100, 1:1 @ A1 25/03/2025 Building Approval 6
Document Set ID: 23656563
Version: 1, Version Date: 26/03/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 2 - Existing Approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.